EC Report
1. Project Details
   Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? : No
1. Project Details
   i. Proposal No. : IA/TN/MIS/27468/2015    ii. MoEFCC File No. : 21-79/2015-IA-III    iii.Short narrative of the project: proposed mall, Guest house & Residental development    iv. Project Sector : INFRA-2    v. Company/Proponent : SUDHANSHU CHATURVEDI
  vi.Details of State of the project
Details of State of the project
S.no. State Name District Name Tehsil Name
1.Tamil NaduCoimbatoreCoimbatore North
 
vii. Uploaded EC Compliance report by rigional office of MoEFCC: NIL viii. Certified Monitoring report by RoMoEF: Annexure-Uploaded Monitoring report    ix.Date of TOR Granted N/A ix.Date of Submission for EC: 20 Apr 2015 x.Project Type: Expansion
2. Uploaded Documents of EIA/EMP,Risk Assessment,Public Hearing etc.
i.EIA/EMP: Annexure-EIA/EMP ii.Risk Assessment: Annexure-Risk Assessment iii.Public Hearing: Annexure-Public Hearing    iv. Date of Public Hearing: 20 Apr 2015   v. Uploaded Additional Report/Study/Document as desired by Ministry/EAC: Annexure-Additional Report/Study/Document   vi. Uploaded Cover Letter: Annexure-Cover Letter   vii.Remarks: This project is expansion project we attache the form 1, form 1A, EMP, in additional detail we attached the STP specification ,Site plan, Topo map, Satellite image ,Water balance sheet,Post EC detail,
3. Additional Detail Sought
Additional Detail Sought
Sno. ADS Letter Remarks Date of ADS
1.NAThe project was listed in 150th meeting of Expert Appraisal Committee for Projects related to Infrastructure Development, Coastal Regulation Zone,building/Construction and Miscellaneous projects held on 29th – 31st July, 2015 The EAC noted the submissions made by the PP and observed that project details in Form -1 are not in consonance with details in Form - 1A. The EAC advised the PP to submit the certificate from concerned State Government department to the effect that the present proposal is in conformity with the existing norms, to allow construction of commercial and residential complex in commercial area. The EAC decided to defer the proposal 17 Sep 2015
2. ADS LetterCovering Letter 22 Sep 2015
3.NAThe project was listed in 153rd meeting of EAC and EAC noted the following:- (i) The PP has revised the project name as ‘Existing Mall’ (Mall, Multiplex, Restaurant, Food Court), proposed Guest House & Residential Development” as per suggestions of the Committee. (ii) Presently, the EC has been sought for A. Guest house, already approved by DTCP B. Residential development for 540 dwelling units including 216 units of EWS, applied for DTCP approval. In view of the earlier observations to obtain a certification from the State Government in respect of conformity of the present proposal with the existing norms, and the submissions made by the project proponent, the EAC preferred to wait for the prior approval of DTCP to the proposed residential development. The proposal was, therefore, deferred. 28 Dec 2015
4. ADS LetterThe covering letter with DTCP approval for Mall and Residential development along with english Translation of DTCP approval notarised is enclosed. 12 Jan 2016
5.NAThe project was considered in 3rd meeting of infra 2 and after detailed deliberation, the Committee sought following addl. Information : a) Fresh form1, IA and conceptual plan. b) Tabular statement mentioning details of the existing EC and proposed changes. c) Monitoring report from the Regional Office, Chennai for the current status of compliance of the existing EC’s conditions to be submitted. d) A report on mandatory compliance measures taken for proposed buildings as recommended in the Energy conservation building code (ECBC) 2007 of the Bureau of Energy Efficiency, Government of India. e) Solar power to be included. f) Details of rain water harvesting system to be incorporated. g) Norms for solid waste management. h) Details of car parking norms to be followed. i) Fresh water balance. Source of water supply. j) STPs should be located at one place. k) Details of DG sets and its stack height as well as acoustic enclosure. The proposal was deferred till the desired 17 Mar 2016
6. ADS LetterPlease find the additional details uploaded. The revised form 1, form 1A, conceptual plan, existing and expansion details,ECBC compliance report, rain water harvesting details, Solid waste management, DG details are all uploaded. 22 Mar 2016
7.NAKindly submit authorized/signed Form-1, status of construction of existing and proposed project. 22 Apr 2016
8. ADS LetterThe signed form 1 is enclosed along with the covering letter. 26 Apr 2016
4. Accredited Consultant Details
   i. Accreditation status : Yes    ii. Accreditation No. : 77    iii. Name of Consultant: Hubert Enviro Care System Pvt Ltd   iv. Address : 18th street, 92nd street, Ashok Nagar, Chennai-600083   v. Mobile No.: 9884390811   vi. Landline No.: 4442985555   vii. Email Id: moses@hecs.in
5. Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief and I am aware that if any part of the data and information found to be false or misleading at at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost.
   i. Name of Applicant : Sudhanshu    ii. Designation : President - Project Developmen    iii. Name of Company(Applicant Name should not be given here) : SUDHANSHU CHATURVEDI    iv. Address : 105/106, Provogue House, Off.New Link Road, Andheri (W), Mumbai 400053 v. Uploaded copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency: NIL
Print