1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | MEWASA BAUXITE MINE | (b)Name of the Company / Organisation | SAURASHTRA CALCINE BAUXITE AND ALLIED INDUSTRIES | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | D K Raichura ji | (b)Designation (Owner/ Partner/ CEO) | Partner | (c)Address | NIL | (d)Pin code | 361315 | (e)E-mail | scabal@scabalindia.com | (f)STD Code. | 2891(f)Telephone No. | 233199 | (g)Fax No. | 233155 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/MIN/18422/2013 | (d)Master Proposal Number(Single Window) | SW/110964/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 138 | (b)Pincode | 361320 | (c)Bounded Latitudes (North) | | From | | Degree | 221352.488 | Minutes | | Second | | From | | Degree | 221405.793 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 691851.398 | Minutes | | Second | | From | | Degree | 691902.575 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41F/3 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 42 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/115/2013.IA.II(M) | (b)Date of Apply of TOR | 17 Apr 2013 | (c)Date of Issue of TOR / Standard ToR | 31 Aug 2015 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 30 Jun 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| At Mine Site, Survey No.:- 138, Village – Mewasa, Taluka – Kalyanpur, District – Devbhoomi Dwaraka (Gujarat) | State : | Gujarat | District : | Devbhumi Dwarka | Tehsil : | Kalyanpur | Village : | Mewasa |
| 41 | Employment is the major issue raised in public hearing. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Jack hammer (RH 658/ 42) | 32mm | 2 Nos. | (2.) | Water tanker | 4000 L | 1 nos | (3.) | Dewatering Pump | 10 HP | 1 Nos | (4.) | Compressor | 450 CFM, 100 PSV | 1 nos | (5.) | Tippers | 35 HP | 2 Nos. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 36000 TPA of ROM/ 9.66 Ha. | 36000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | Obtained | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 21 Jun 2011 | (iv)Valid Upto | 27 Jan 2015 | (v)File No. | PC/CCA-JMN-311(2)/ID_17099/84555 | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.75 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.1907 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.05 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.003 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | a)Protected areas notified under the wildlife (Protection) Act, 1972 | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 10.59 | Tons per Annum | | Nearby Pump | Road | | 1 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2015 To 31 Dec 2015 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 118.50 | 69.30 | 113.93 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 32.30 | 13.20 | 31.98 | 80 | (3.) | SO2 | | Micro Gram per Meter Cube | 21.50 | 11.0 | 21.04 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 1430 | 290 | 1400 | 2000 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 62.30 | 32.30 | 61.75 | 60 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 3712 | 3188 | 500 | 2000 | (2.) | Chlorides | | | mg/l | | 1433 | 1320 | 250 | 1000 | (3.) | pH | | | NA | | 7.90 | 7.70 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (5.) | Total Hardness | | | mg/l | | 1251 | 1193 | 200 | 600 | (6.) | Fluoride | | | mg/l | | 2 | 1.80 | 1 | 1.5 | (7.) | Heavy Metals | | Cadmium | mg/l | | 0.0101 | 0.0017 | 0.003 | 0 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 6.7 | 5.4 | C | (2.) | COD | | mg/l | | 98 | 20 | C | (3.) | BOD | | mg/l | | 30 | 4 | C | (4.) | pH | | NA | | 8.40 | 7.65 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 45.8 | 40 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.1 | 49.8 | 55 | |
14.5. No. of Soil Sample Monitored locations : 4 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milligram per Kilogram | | 143 | 62 | (2.) | pH | | | 8.36 | 1.62 | (3.) | P(Phosphorus) | Milligram per Kilogram | | 2.12 | 0.23 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 5230 | 7.81 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 147.5 | 36.0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 22 To 22 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 28 To 28 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Water Tanker | 6.5 | 1.0 | Copy of Permission Letter | modeOthers | Road | Others | Water Tanker | NA | 10 Jul 2019 | 6.5 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic | 1.5 | 2 | Septic tank followed by soak pit | Others | Septic tank followed by soak pit | 0.5 | 1.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1.5 | (b)Total Discharged Water (Kilolitre per Day) | 1 | (c)Total Reused Water (Kilolitre per Day) | 0.5 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 2.7 | Tons | 75 | Road | | Authorized Recyclers | | (2.) | Mine Waste | Others | Mine Waste | 1800 | Tons | 0 | Road | | Others | Backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 114.6 | 0 | 9.8 | 124.6 | 100 | (2.) | NOx | | Microgram per Meter Cube | 26.7 | 0 | 0.004 | 26.71 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 62.3 | 0 | 4.5 | 66.9 | 60 | (4.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 1 | 0 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 1430 | 0 | 0.002 | 1430.003 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | NA | 0 | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | NA | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.66 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.66 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 9.66 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Private Agriculture Land | 0 | Total (ha.) | 9.66 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Water Reservoir | | 8.3655 | Water Reservoir | (2.) | Green belt | | 0.200 | Plantation | (3.) | Built Up Area | | 0.0100 | Used for plantation | (4.) | Others | Undisturbed area | 1.0845 | Plantation | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | NA | 0 | NA | (2.) | NPA | Marine National Park | 3.34 | Towards NE | (3.) | Wildlife Corridors | NA | 0 | NA | (4.) | ESAs | NA | 0 | NA | (5.) | Critically Polluted Area | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Corridors | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | NA | 0 | NA | (2.) | Forest | | R.F. | 5.10 | Towards NE | (3.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | Selec | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 9.66 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Pea-fowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 5.0 Lacs | (iii)Period of Implementation | Life of Mine | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Rani Nadi | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 3.73 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 40 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 20 | (e)No. of working days | 300 | (f)Total Manpower | 60 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.2945 | (b)Percentage of Total Project Area | 13.40 | (c)No. of Plants to be Planted | 1294 | (d)Funds Allocated for Plantation | 6.47 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | A total of 1294 plants will be planted till the life of mine. | (2.) | Social | Employment to 60 people will be provided. | (3.) | Financial | State Govt. will get revenue in form of royalty and taxes. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Bauxite | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 36000 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 682 (23) (MS – 630)/2007 | (b)Date of Approval | 22 Jan 2016 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 9.66 | (f)Approved Capacity | 36000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 0.095582 | (b)Mineable Reserves (Million Ton) | 0.412759 | (c)Extractable Reserves(Million Ton) | 0.412759 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | Al2O3-45% High Grade; A12O3-35% Low Grade | (f)Stripping Ratio | 0.020 : 1 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 0 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 12 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 9.66 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | It is a existing mine | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 9.66 | (iii)Validity of the lease deed | From : 03 Sep 1986 To : 02 Sep 2036 | (iv)Date of Execution of Mining Lese | 03 Sep 1986 | (v)Reference Number | MCR-1585 CHH-80550 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | As per Amendment Act Dated 12.01.2015 Validity of | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 1 | (ii)Total Area (in Hectare) | 8.3655 | (iii)Height (in meter) | 12 | (iv)Quantity (in Million Cubic meter) | 1.00386 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 8.3655 | (b)Depth (in meter) | 12 | (c)Volume (in Million Cubic meter) | 1.00386 | |
|
12. | Details of Quarry: | (a)Final Void of 8.3655 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 9.66 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | By Tippers | (b)Surface to Siding/Loading | By Tippers | (c)Transportation / Conveyor Details | By Road | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 9.66 | 0 | 9.66 | (2.) | FOREST LAND | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | WASTE LAND | | 0 | 0 | 0 | |
TOTAL | 9.66 | 0 | 9.66 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (2.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | VIRGIN AREA | | 1.0845 | 0 | 0 | | 1.0845 | (4.) | EXCAVATION/QUARRY | | 0 | 8.365 | 0 | | 8.365 | (5.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | ROADS | | 0 | 0 | 0 | | 0 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0.0100 | 0 | 0 | | 0.01 | (8.) | GREEN BELT | | 0.200 | 0 | 0 | | 0.2 | |
TOTAL | 1.2945 | 8.365 | 0 | 0 | 9.6595 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 9.66 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 8.3655 (hectare) at a Depth of 12 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1000 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 1294 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 1990 | 0 | 0 | 0 | 6267 | 0 | (2.) | 1993 | 0 | 0 | 0 | 11526 | 0 | (3.) | 1994 | 0 | 0 | 0 | 25572 | 0 | (4.) | 1996 | 0 | 0 | 0 | 37342 | 0 | (5.) | 1998 | 0 | 0 | 0 | 66820 | 0 | (6.) | 1999 | 0 | 0 | 0 | 25074 | 0 | (7.) | 2001 | 0 | 0 | 0 | 23282 | 0 | (8.) | 2002 | 0 | 36000 | 0 | 9455 | 0 | (9.) | 2003 | 0 | 36000 | 0 | 5718 | 0 | (10.) | 2004 | 0 | 36000 | 0 | 10208 | 0 | (11.) | 2007 | 0 | 36000 | 32130 | 35921 | 0 | (12.) | 2008 | 0 | 36000 | 32775 | 35889 | 0 | (13.) | 2009 | 0 | 36000 | 33900 | 10460 | 0 | (14.) | 2010 | 0 | 36000 | 31800 | 3231 | 0 | (15.) | 2011 | 0 | 36000 | 29498 | 465 | 0 | (16.) | 2012 | 0 | 36000 | 30537 | 12300 | 0 | (17.) | 2014 | 0 | 36000 | 30024 | 0 | 0 | (18.) | 2017 | 0 | 36000 | 32348 | 0 | 0 | (19.) | 2018 | 0 | 36000 | 32063 | 0 | 0 | (20.) | 1988 | 0 | 0 | 0 | 6007 | 0 | (21.) | 1992 | 0 | 0 | 0 | 23290 | 0 | (22.) | 1995 | 0 | 0 | 0 | 22838 | 0 | (23.) | 2000 | 0 | 0 | 0 | 27014 | 0 | (24.) | 2005 | 0 | 36000 | 0 | 15728 | 0 | (25.) | 2016 | 0 | 36000 | 32148 | 0 | 0 | (26.) | 2013 | 0 | 36000 | 30375 | 19670 | 0 | (27.) | 1991 | 0 | 0 | 0 | 26991 | 0 | (28.) | 1997 | 0 | 0 | 0 | 61794 | 0 | (29.) | 2006 | 0 | 36000 | 35955 | 33409 | 0 | (30.) | 2015 | 0 | 36000 | 30456 | 0 | 0 | (31.) | 1989 | 0 | 0 | 0 | 16852 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 47 | (ii)Name of the EIA Consultant | Enkay Enviro Services Pvt. Ltd. | (iii)Address | 92, Heera Nagar-A, Near Shalimar Bagh, Ajmer Road, Jaipur | (iv)Mobile No. | 9314363996 | (v)Landline No. | 0141492077 | (vi)Email Id | info@enkayenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 14 Aug 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP is requested to submit the following:
Copy of action taken for violation made by the project proponent
2. Details of demand for the violation if any raised by Department of Mining and Geology.
3. Details of payment for the violation, if any made to Department of Mines & Geology
4. Status of mine whether working or not
5. Copy of approval letter of Conservation plan for Schedule I species
6. Status of the NBWL clearance | 06 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 20 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | Deferred | 28 Mar 2023 | 2. | ADS Reply Letter | ADS REPLY ENCLOSED WITH ANNEXURE | 23 Feb 2023 | 3. | NA | deferred the proposal
| 20 Nov 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | D K Raichura ji | Designation | Partner | Name of Company (Applicant Name should not be given here) | SAURASHTRA CALCINE BAUXITE AND ALLIED INDUSTRIES | Address | Harshad Road, P.O. - Bhatia Taluka - Kalyanpur |
|