(a)Name of the project(s) Expansion of Caustic Chlorine Products and Value-Added Derivatives along with installation of new Chloromethane Plant at Birlagram, Nagda, District - Ujjain (Madhya Pradesh) by M/s. Grasim Industries
(b)Name of the Company / Organisation GRASIM INDUSTRIES LIMITED CHEMICAL DIVISION
(c)Registered Address Birlagram, Nagda,,Ujjain,Madhya Pradesh-456331
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Kumar Mishra
(b)Designation (Owner/ Partner/ CEO) HSEHEAD
(c)Address Birlagram, Nagda,,Nagda,Ujjain,Madhya Pradesh-456331
(d)Pin code 456331
(e)E-mail vinod.kmishra@adityabirla.com
(f)STD Code. 7366(f)Telephone No. 255512
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(d) Chlor-alkali industry
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity4(d) Chlor-alkali industry
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
(b)Category A
(c)Proposal Number IA/MP/IND2/26969/2015
(d)Master Proposal Number(Single Window) SW/111383/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra List Enclosed with PFR
(b)Pincode 456331
(c)Bounded Latitudes (North)
From
Degree 023265.25
Minutes
Second
From
Degree 232639.69
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 752410.35
Minutes
Second
From
Degree 752455.10
Minutes
Second
(e)Survey of India Topo Sheet No. 46M/6, 46M/7, 46M/10 and 46M/11
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 477
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshUjjainNagda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11011/119/2015-IA-II(I)
(b)Date of Apply of TOR 07 May 2015
(c)Date of Issue of TOR / Standard ToR 29 Jul 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :2
SDM Office, Nagda
State :Madhya Pradesh
District :Ujjain
Tehsil :Nagda
Village :Birlagram
138Issues related to Employment, Environment, Pollution, CSR activities, Health and Education were raised during the Public Hearing.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rectifier (MVA)258FOR RECTIFORMER
(2.)Ion exchange column (m3/h)1314FOR SALT PURIFICATION
(3.)Electrolyser (TPD)1240FORELECTROLYSIS
(4.)Flaker Drum (TPD)300FOR CAUSTIC SODA FLAKES UNIT
(5.)Chlorine Compressor (TPD)1120FOR CHLORINE
(6.)Chlorine Vaporiser (TPD)28FOR CHLORINE
(7.)HCl furnace (TPD)265FOR HCl
(8.)MSGL Reactor (KL)176FOR PAC
(9.)Columns(m3)926.31For ChloroMethane Plant
(10.)Exchangers(m2)1342.56For ChloroMethane Plant
(11.)Reactors(m3)81.2For ChloroMethane Plant
(12.)Chlorine Liquefier (TPD)1180FOR CHLORINE
(13.)Heating vessel (KL)18FOR CP
(14.)Saturator (m3)354FOR SALT PURIFICATION
(15.)Chlorine Absorbers (m3)76FOR HYPO
(16.)Graphite Heat Exchanger (L)440FOR PAC
(17.)Drying Chamber (Kg/h)3000FOR PAC
(18.)Crane (Ton)4FOR PAC
(19.)Degasifier (KL)40FOR CP
(20.)HCl scrubber (m2)211FOR CP
(21.)Condenser (m2)70FOR CP
(22.)Chlorination Drum (m3)140FOR SBP
(23.)Lime hopper (m3)34FOR SBP
(24.)Redler Conveyor (TPH)80FOR SBP
(25.)Hypo Tower (TPD)16FOR SBP
(26.)Gas coolers (m2)47For ChloroMethane Plant
(27.)Acid stripping system(m2)0.38For ChloroMethane Plant
(28.)Separators(m3)100.26For ChloroMethane Plant
(29.)Reactor (KL)56FOR CP
(30.)Clarifier (m3 )7500FOR SALT PURIFICATION
(31.)Polishing Filters(m3/h)675FOR SALT PURIFICATION
(32.)Electrolyser (TPD)1240FORELECTROLYSIS
(33.)Chlorate Destruction Tank (m3/h)37.5FOR CHLORATE DESTRUCTION
(34.)Chlorine drying Tower (Kg/h)41925FOR CHLORINE
(35.)Multistage evaporator (TPD)1125FOR CAUSTIC CONCENTRATION UNIT
(36.)HCl furnace (TPD)265FOR HCl
(37.)Condensers(m2)2638.68For ChloroMethane Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Poly Aluminum Chloride165000Tons per AnnumRoad
(2.)ChloroSulphonic Acid23400Tons per AnnumRoad
(3.)Calcium Chloride (100 %)54000Tons per AnnumRoad
(4.)Hydrochloric Acid (100%)135000Tons per AnnumRoad
(5.)Sodium Hypochlorite (100%)90000Tons per AnnumRoad
(6.)Carbon Dioxide (By- product)23760Tons per AnnumRoad
(7.)Compressed Hydrogen1460Tons per AnnumRoad
(8.)Stable Bleaching Powder54750Tons per AnnumRoad
(9.)Caustic Soda450000Tons per AnnumRoad,Rail
(10.)Chlorinated Paraffin45645Tons per AnnumRoad
(11.)Chloromethane36000Tons per AnnumRoad
(12.)Chlorine365000Tons per AnnumRoad
(13.)Hydrogen11400Tons per AnnumRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 20 May 2019
(iv)Valid Upto 28 Feb 2022
(v)File No. For Caustic Soda Membrane Cell Unit-1 :AWH 49987
(vi)Application No. For Caustic Soda Membrane Cell Unit-1 :755012
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 285
(b) Funds Allocated for Environment Management (Capital) (in Crores) 20
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.4
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1274361
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1274361
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sodium Sulphite115Tons per AnnumM/s. Kota Chemicals, Kota RajasthanRoad350 OthersPurchase OrderCopy of Linkage
(2.)Hydrochloric Acid22500Tons per AnnumWithin PlantPipe Conveyor2 CaptiveCopy of Linkage
(3.)AlphaCellulose68OthersMPASigachi Plasticizers PuneRoad700 OthersPurchase OrderCopy of Linkage
(4.)MagnaFloc5Tons per AnnumBASF India Ltd.GujaratRoad650 OthersPurchase OrderCopy of Linkage
(5.)Salt706500Tons per AnnumM/s. Shri Ram saltRoad,Rail700 OthersPurchase orderCopy of Linkage
(6.)Barium Carbonate4200Tons per AnnumM/s. Solavay VishnuRoad1000 OthersPurchase OrderCopy of Linkage
(7.)AluminaHydrate47500Tons per AnnumM/s. Hindalco, IndoreRoad250 OthersPurchase OrderCopy of Linkage
(8.)limestone/hydrated lime65000Tons per AnnumM/s. Gotan Lime, Gotan, RajasthanRoad575 OthersPurchase OrderCopy of Linkage
(9.)Chlorine22448Tons per AnnumWithin PlantPipe Conveyor2 CaptiveCopy of Linkage
(10.)Hydrochloric acid for Chlorinated paraffin7488Tons per AnnumCaptive productionPipe Conveyor2 CaptiveCopy of Linkage
(11.)SulphurTrioxide for Chlorinated paraffin for16193Tons per AnnumSister unitPipe Conveyor2 CaptiveCopy of Linkage
(12.)Methanol9855Tons per AnnumJ.K. Enterprises IndoreRoad300 Open MarketCopy of Linkage
(13.)Sulphuric Acid7300Tons per AnnumCaptivePipe Conveyor2 CaptiveCopy of Linkage
(14.)Chlorine for Chloromethane Plant31032Tons per AnnumWithin PlantPipe Conveyor2 CaptiveCopy of Linkage
(15.)Soda ash910Tons per AnnumM/s. DCW, Dhargendra, GujaratRoad650 OthersPurchase OrderCopy of Linkage
(16.)Hydrochloric Acid38280Tons per AnnumCaptive productionPipe Conveyor2 CaptiveCopy of Linkage
(17.)Sulfuric Acid2210Tons per AnnumSister unitPipe Conveyor2 CaptiveCopy of Linkage
(18.)Hydrochloric Acid for For Calcium Chloride35532Tons per AnnumCaptive productionPipe Conveyor2 CaptiveCopy of Linkage
(19.)NormalParaffin/HeavyNormalParaffin19500Tons per AnnumM/s. MahimaRoad650 OthersPurchase OrderCopy of Linkage
(20.)Sulphuric Acid for Chlorinated paraffin93600Tons per AnnumSister unitPipe Conveyor2 CaptiveCopy of Linkage
(21.)Caustic Soda45000Tons per AnnumWithin PlantPipe Conveyor2 CaptiveCopy of Linkage
(22.)Hydrated Lime 90% For Bleaching power unit41000Tons per AnnumM/s. Shri RamRoad575 OthersPurchase OrderCopy of Linkage
(23.)Epoxidized Soya Bean oil913Tons per AnnumAgrawal Organics and Dhanraj Organics IndoreRoad150 OthersPurchase OrderCopy of Linkage
(24.)Chlorine For Chlorinated paraffin54700Tons per AnnumWithin PlantPipe Conveyor2 CaptiveCopy of Linkage
(25.)Caustic Soda For Bleaching power unit1371Tons per AnnumCaptive productionPipe Conveyor2 CaptiveCopy of Linkage
(26.)Caustic Soda for Chlorinated paraffin1141Tons per AnnumCaptive productionPipe Conveyor2 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube90.163.288.74100
(2.)PM2.5Micro Gram per Meter Cube46.328.246.2760
(3.)NOxMicro Gram per Meter Cube30.612.629.3580
(4.)SO2Micro Gram per Meter Cube32.97.330.0580
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0000
(2.)TDSmg/l18156035002000
(3.)Total Hardnessmg/l586.50268.98200600
(4.)Fluoridemg/l1.050.631.01.5
(5.)pHNA7.697.106.58.5
(6.)Chloridesmg/l785.45203.212501000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.727.48E
(2.)DOmg/l5.605.40E
(3.)OthersTotal Hardnessmg/l268.84156.98E
(4.)BODmg/l11.657.01E
(5.)CODmg/l148.5723.20E
(6.)OthersChloridemg/l119.1086.32E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.848.375
(2.)Leq(Night)A-weighted decibels(dB(A))54.640.870
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare52.5933.56
(2.)K(Potassium)Kilogram per hectare157.2548.36
(3.)pH7.967.32
(4.)N(Nitrogen)Kilogram per hectare336.95206.58
(5.)Electric ConductivityMillisiemens per Centimetre0.460.20
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 06.2 To 21
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 03.4 To 16
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface54001Copy of Permission LetterPipelineIntake Well3634/Revenue/2011-1201 Apr 201141666
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic5380STPGreen Belt Renewal Plant53
(2.)IndustrialActivity6101000ETPOthersReuse within the Plant6100
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 663
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 663
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Glass WoolsIndustrial Waste4Tons170RoadOthersSold to MPPCB Authorized recycler
(2.)Brine SludgeIndustrial Waste9000Tons1RoadSanitary Landfills
(3.)Chemical Waste (Solid)Industrial Waste15Tons1RoadSanitary Landfills
(4.)Oily rags and waste rubberIndustrial Waste4Tons170RoadAuthorized Recyclers
(5.)Discarded PPEsIndustrial Waste0.5Tons1RoadSanitary Landfills
(6.)Process waste from SBPIndustrial Waste5000Tons1RoadSanitary Landfills
(7.)Used / Spent OilOthersUsed / Spent Oil50Kilolitre170RoadOthers• Sold to MPPCB Authorized recycler
(8.)ETP Sludge / Chemical SludgeIndustrial Waste150Tons1RoadSanitary Landfills
(9.)Process waste from PACIndustrial Waste1000Tons1RoadSanitary Landfills
(10.)ThermocolIndustrial Waste0.20Tons170RoadAuthorized Recyclers
(11.)Discarded AsbestosIndustrial Waste1Tons1RoadSanitary Landfills
(12.)STP Sludge (Bio manure)OthersDomestic Waste1.825Tons1RoadOthersGreenbelt/Plantation Development
(13.)Emplty barrelsIndustrial Waste10Tons170RoadAuthorized RecyclersSold to MPPCB Authorized recycler
(14.)Used memberanesIndustrial Waste5Tons1RoadSanitary Landfills
(15.)Exhausted Ion Exchange resinIndustrial WasteExhausted Ion Exchange resin35Tons1RoadSanitary Landfills
(16.)Oil & Grease (Skimming)Industrial Waste1.5Tons170RoadAuthorized Recyclers
(17.)Process waste from Calcium ChlorideIndustrial Waste720Tons1RoadSanitary Landfills
(18.)FRP WasteIndustrial Waste10Tons170RoadAuthorized Recyclers
(19.)Salt from ZLD PlantIndustrial Waste2920Tons1RoadSanitary Landfills
(20.)PVC & Plastic WastePlastic Waste125Tons170RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)Others(Specify)HCLMicrogram per Meter Cube28.90.70.10829.1080
(2.)SO2Microgram per Meter Cube00010
(3.)NOxMicrogram per Meter Cube00010
(4.)PM10Microgram per Meter Cube87.900.70.024387.944100
(5.)PM2.5Microgram per Meter Cube00010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Chlorinated ParafinNA30100OthersCL210 mg/Nm3
(2.)Chlorinated ParafinNA30100OthersHCL20 mg/Nm3
(3.)Caustic Soda Unit - 1, 2 & 3 (Water Scrubber)NA34100OthersCL210 mg/Nm3
(4.)Calcium ChlorideNA34100OthersCL210 mg/Nm3
(5.)ChloromethaneNA34200OthersCL210 mg/Nm3
(6.)Caustic Soda Unit - 1, 2 & 3 (Water Scrubber)NA34100OthersHCL20 mg/Nm3
(7.)Stable Bleaching PowderNA30100PM10150 mg/Nm3
(8.)Stable Bleaching PowerNA30100OthersCL210 mg/Nm3
(9.)Poly Aluminium ChlorideNA34100OthersHCL20 mg/Nm3
(10.)Calcium ChlorideNA34100OthersHCL20 mg/Nm3
(11.)Poly Aluminium ChlorideNA34100PM1050 mg/Nm3
(12.)Chloro Suphonic AcidNA30100OthersCL210 mg/Nm3
(13.)Chloro SulphonicNA30100PM1050 mg/Nm3
(14.)Caustic Soda Unit - 1, 2 & 3 (Alkali Scrubber)NA32100OthersCL210 mg/Nm3
(15.)Caustic Soda Unit -1, 2 & 3 (Alkali Scrubber)NA32100OthersHCL20 mg/Nm3
(16.)Chloro Suphonic AcidNA30100OthersHCL20 mg/Nm3
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 141000
(b)Source Outsource& Madhya Pradesh State Electricity Board
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) Not Applicable
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 61.92
    Total Land (ha.) 61.92
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 61.92
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 61.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant26.6
(2.)Green belt23.68
(3.)OthersOther Infrastructure11.64
Total (ha.) 61.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0No Critically Polluted Area within 10 km radius
(2.)ESZsNot applicable0No ESZ within 10 km radius
(3.)CorridorsNot applicable0No Corridor within 10 km radius
(4.)WLSNot applicable0No WLS within 10 km radius
(5.)ESAsNot applicable0No ESA within 10 km radius
(6.)NPANot applicable0No NPA within 10 km radius
(7.)Wildlife CorridorsNot applicable0No wildlife corridor within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot applicable0No Defense Installation within 10 km radius
(2.)ForestNot applicable0No Forest within 10 km radius
(3.)Archaeological SitesNot applicable0No Archaeological Site within 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 61.92
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Pavo Cristatus (Indian Peafowl)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1260000
(iii)Period of Implementation 10
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Chambal River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 30
(b)Permanent Employment-During Operation 245
(c)Temporary Employment- During Construction 200
(d)Temporary Employment- During Operation 1300
(e)No. of working days 365
(f)Total Manpower 1775
32.
Green Belt in Ha:
(a)Total Area of Green Belt 23.68
(b)Percentage of Total Project Area 38.24
(c)No. of Plants to be Planted 51943
(d)Funds Allocated for Plantation 250
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalGreenery of the area will be increased
(2.)SocialEmployment generation and upliftment of the nearby villagers through CER
(3.)FinancialRevenue generation for State and Centre in terms of taxes etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J.M. EnviroNet Pvt. Ltd.
(iii)Address 202-A, ABW Tower, MG Road, IFFCO Chowk, Gurugram (Haryana)
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - EC for the existing operations/production and the compliance status thereof. - Whether all the existing/proposed products are covered under the ambit of the EIA Notification, 2006, and require prior EC. - EIA consultant is not accredited for preparing/submission of EIA/EMP report relating to items 4(d) & 5(f). The proposal is therefore not acceptable. 11 Aug 2019
2.NAThe correction have been made as per the instruction received 30 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Kumar Mishra
DesignationHSEHEAD
Name of Company (Applicant Name should not be given here)GRASIM INDUSTRIES LIMITED CHEMICAL DIVISION
AddressBirlagram, Nagda
Print