1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposal Under EIA Notification 2006 and Ministry’s Notification vide S.O. (E) 1530, Dated 06.04.2018 for Sugala Limestone and Marl Mine (ML Area 417.3584 ha) with Limestone production capacity of 1.2
(b)Name of the Company / Organisation AMBUJA CEMENT LIMITED
(c)Registered Address 228. Udyog Vihar, Phase-I,Gurgaon,Gurgaon,Haryana-122016
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Sanjeew Kumar Singh
(b)Designation (Owner/ Partner/ CEO) Manager - Environment
(c)Address 228, Udyog Vihar, Phase-I,,,Gurgaon,Haryana-122016
(d)Pin code 122016
(e)E-mail sanjeewkumar.singh@adani.com
(f)STD Code. 124(f)Telephone No. 4565328
(g)Fax No. 01244531180
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/MIN/77357/2018
(d)Master Proposal Number(Single Window) SW/111248/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map is enclosed
(b)Pincode 362710
(c)Bounded Latitudes (North)
From
Degree 205245.16
Minutes
Second
From
Degree 205451.12
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 704533.23
Minutes
Second
From
Degree 704637.41
Minutes
Second
(e)Survey of India Topo Sheet No. 41L/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 54
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 250
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGir SomnathKodinar
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11015/154/2018-IA-II(M)
(b)Date of Apply of TOR 03 Oct 2018
(c)Date of Issue of TOR / Standard ToR 11 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The public hearing is not required as the instant
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Surface Miner SM2200;Wirtgen400 TPH1 no
(2.)Front end Loader L554; Liebherr3.50 cum1 no
(3.)Front end Loader L580; Liebherr50 cum1 no
(4.)Ripper Dozer D275A KOMATSUSingle shank giant ripper1 no
(5.)PC-200 (L&T komatsu)0.90 cum1 no
(6.)Tippers AMW 311818 tonnes25 no
(7.)Tippers TATA (3118)18 tonnes10 no
(8.)Surface Miner SM2100;Wirtgen200 TPH1 no
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Limestone1290000Tons per AnnumRoad
(2.)Soil403572Tons per AnnumOthersHaul road
(3.)Mining lease area417.3584HectaresOthers.
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? Obtained
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 21 Jul 2018
(iv)Valid Upto 01 Jul 2023
(v)File No. AWH-94734
(vi)Application No. 140283
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 150
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.10
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.51
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 335034
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 335034
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD335034OthersLiterIOCLRoad500 Open MarketCopy of Linkage
(2.)Lubricants6293OthersLiterIOCLRoad500 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2018 To 28 Feb 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube53.426.452.8660
(2.)SO2Micro Gram per Meter Cube19.705.8119.4280
(3.)NOxMicro Gram per Meter Cube17.367.8017.1680
(4.)PM10Micro Gram per Meter Cube87.450.286.656100
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l....
(2.)TDSmg/l5263705002000
(3.)Total Hardnessmg/l580346200600
(4.)Chloridesmg/l127.370.92501000
(5.)Fluoridemg/l1.40.321.01.5
(6.)pHNA7.37.086.58.5
(7.)Heavy MetalsNANA....
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.987.72D
(2.)DOmg/l7.24.8D
(3.)BODmg/l7.64.6D
(4.)CODmg/l31.4019.6D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))67.951.7I 70-75, C 55-65, R 45-55, S 40-50
(2.)Leq(Night)A-weighted decibels(dB(A))60.541.6I 70-75, C 55-65, R 45-55, S 40-50
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre0.470.23
(2.)pH8.478.1
(3.)N(Nitrogen)Kilogram per hectare126.8111.7
(4.)P(Phosphorus)Kilogram per hectare35.1232.18
(5.)K(Potassium)Kilogram per hectare225.60155.75
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 06 To 12
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4.8 To 8.7
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/1599/GJ/MIN/2016-175
(f)Date of Issue 31 Jan 2018
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater2250Copy of Permission LetterPipelineTube Well21-4/1599/GJ/MIN/2016-17531 Jan 20187628
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic & Utility1010Soak Pit via septic tankOthersSoak pit via septic tank010
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10
(b)Total Discharged Water (Kilolitre per Day) 10
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SoilOthersMine waste403572Tons0RoadOthersfor plantation
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube50.30050.460
(2.)PM10Microgram per Meter Cube82.500.082.6100
(3.)SO2Microgram per Meter Cube11.700011.7180
(4.)NOxMicrogram per Meter Cube24.680024.6980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000Others00
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 0
(b)Source 0
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 0
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 414.8493
(c)Government Land (ha.) 2.5091
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 417.3584
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 414.8493
(b)Waste/Barren Land (ha.) 2.5091
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 417.3584
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area360100 ha water reservoir and 260 ha backfilled
(2.)Green belt46.
(3.)OthersUndisturbed9.56Undisturbed
(4.)Built Up Area1.80Road
Total (ha.) 417.36
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNone0None
(2.)WLSGir Wildlife Sanctuary6.25.
(3.)NPANone0None
(4.)CorridorsNone0none
(5.)ESZsESZ of Gir wildlife sanctuary0None
(6.)Wildlife CorridorsNone0None
(7.)ESAsNone0None
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone0NOne
(2.)Defence InstallationsNone0None
(3.)OthersNoneNone0None
(4.)Archaeological SitesNone0None
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 279.0070
(b)Land yet to be acquired(Ha) 138.3505
(c)Status of Land acquisition if not acquired under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 2
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 101
(e)Funds Allocated for R&R(in INR) (in Lacs) 13835.05
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Peafowl, Asiatic Lion, and Leopard
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 60 Lakh
(iii)Period of Implementation 10 years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? Yes
(i)Uploaded copy of approval Copy of approval
(ii)Letter No. WLP/32/B/8598-99/2018-19
(iii)Date of issue 10 Dec 2018
(iv)Recommendation conservation plan approved
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nallah and sub canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Shingoda Mine
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 250
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 117
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 117
32.
Green Belt in Ha:
(a)Total Area of Green Belt 46
(b)Percentage of Total Project Area 11.02
(c)No. of Plants to be Planted 115000
(d)Funds Allocated for Plantation 17250000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAt the end of the life of mine total 360 ha will be excavated out of which 1.80 ha will be used for public/haul road, 100 ha converted to water reservoir, 260 ha will be backfilled, 46 ha will be covered by Greenbelt/plantation, 1.48 ha covered under water bodies (river/nallah/canal/pond) and 8.10 ha area will remain undisturbed. Development of water reservoir will increase the availability of surface water in the area.
(2.)SocialThe project will have positive direct and indirect employment. Manpower is required for mining operations and other mining related activities such as transportation, day to day operations etc. Further, additional employment opportunities will be generated. The total manpower required for the proposed mining project is around 117 persons. Preference has been given to the local people for employment based on their qualification and eligibility in the mines
(3.)FinancialThe Project will contribute additional revenue to the State and Central Govt. in the form of royalty, cess and other taxes etc.Job opportunities to the local people will improve the earning and spending capacity of the people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 1290000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. 682(23)(MS-374)/2006-khani kha sa (N) Uday
(b)Date of Approval 02 Dec 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 417.3584
(f)Approved Capacity 1290000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 39.458
(b)Mineable Reserves (Million Ton) 22.518
(c)Extractable Reserves(Million Ton) 22.518
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral cement grade
(f)Stripping Ratio 1 : 0
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) gentle slope in north to south direction 0.0015 in 1.0
(i)Mining Method Opencast
(j)Life of Mine (Years) 18
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 417.3584
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease has already been granted
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 417.3584
(iii)Validity of the lease deed From : 02 Sep 2002 To : 01 Sep 2032
(iv)Date of Execution of Mining Lese 02 Sep 2002
(v)Reference Number nil
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease deed valid upto 01.09.2032
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 1.7
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 1.7
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 100
(b)Depth (in meter) 10
(c)Volume (in Million Cubic meter) 10
12.
Details of Quarry:
(a)Final Void of 100 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 360
13.
Details of Transportation:
(a)In Pit/Underground to Surface From pit to surface by means of Wheel loader and t
(b)Surface to Siding/Loading Loading will be done by Front End Wheel Loader.
(c)Transportation / Conveyor Details From Sugala mine to cement plant located at Ambuja
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND414.84930414.8493
(2.)GRAZING LAND000
(3.)WASTE LAND2.509102.5091
(4.)SETTLEMENTS000
(5.)SURFACE WATER BODIES000
(6.)FOREST LAND000
(7.)OTHERS(Specify)0000
TOTAL417.35840417.3584
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT460046
(2.)OtherUndisturbed area and stream01.488.07849.5584
(3.)EXTERNAL OB DUMPS0000
(4.)INTERNAL OB DUMPS0000
(5.)BUILT UP AREA (COLONY/OFFICE)0000
(6.)VIRGIN AREA0000
(7.)ROADS001.801.8
(8.)EXCAVATION/QUARRY0100260360
(9.)TOP SOIL STORAGE0000
TOTAL46101.48269.87840417.3584
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 100 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 1500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 1.80
(h)Total afforestation plant (in hectare) 306
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)200203104000012900001290000732510
(2.)20101112900001290000129000012778220
(3.)20151612900001290000129352912895770
(4.)20181912900001290000129000012895510
(5.)20040510400001290000129000010398180
(6.)20121312900001290000128879612570750
(7.)20050610400001290000129000010397770
(8.)20091012900001290000129000012898430
(9.)20131412900001290000128935112181090
(10.)20030410400001290000129000010399530
(11.)20060710400001290000129000010398810
(12.)20080912900001290000129000012811610
(13.)20161712900001290000129249412886370
(14.)20171812900001290000129000012458860
(15.)20111212900001290000129000012317420
(16.)20070812900001290000129000012894990
(17.)20141512900001290000128191812817140
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt Ltd
(iii)Address J.M EnviroNet Pvt. Ltd., 202-A, ABW Tower, M.G. Road, Near IFFCO Chowk,, Gurugram - 122 001 (Haryana)
(iv)Mobile No. 9509267011
(v)Landline No. 0112469540
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPP is requested to submit the following: 1. All submitted document showed that the lease area is 417.35.84 ha; however, PP submitted the application for 417.3584 ha. So, it is unclear that what is the lease area for this proposal? Clarify the same with documentary proof. 2. The executed lease deed is in the name of M/s. Gujarat Ambuja Cement Ltd. Please clarify the same. 3. Provide the details of earlier public hearing with the necessary document. 4. Authenticated English translated copy for past production details since inception of mine. 5. Letter of authorization for the person who is responsible for this proposal. Whether it is Mr. Sanjeew Kumar Singh or Mr.Sukurj Ramarao? Please clarify the same with documentary proof. 06 Sep 2019
2.NAThe correction have been made as per the instruction received 27 Sep 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are herewith submitting ADS Reply 16 Oct 2020
2.NA

Deferred the proposal 

20 Nov 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSanjeew Kumar Singh
DesignationManager - Environment
Name of Company (Applicant Name should not be given here)AMBUJA CEMENT LIMITED
Address228, Udyog Vihar, Phase-I, Gurgaon, Haryana - 122016
Print