1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Proposal Under EIA Notification 2006 and Ministry’s Notification vide S.O. (E) 1530, Dated 06.04.2018 for Sugala Limestone and Marl Mine (ML Area 417.3584 ha) with Limestone production capacity of 1.2 | (b)Name of the Company / Organisation | AMBUJA CEMENT LIMITED | (c)Registered Address | 228. Udyog Vihar, Phase-I,Gurgaon,Gurgaon,Haryana-122016 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sanjeew Kumar Singh | (b)Designation (Owner/ Partner/ CEO) | Manager - Environment | (c)Address | 228, Udyog Vihar, Phase-I,,,Gurgaon,Haryana-122016 | (d)Pin code | 122016 | (e)E-mail | sanjeewkumar.singh@adani.com | (f)STD Code. | 124(f)Telephone No. | 4565328 | (g)Fax No. | 01244531180 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/MIN/77357/2018 | (d)Master Proposal Number(Single Window) | SW/111248/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra Map is enclosed | (b)Pincode | 362710 | (c)Bounded Latitudes (North) | | From | | Degree | 205245.16 | Minutes | | Second | | From | | Degree | 205451.12 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 704533.23 | Minutes | | Second | | From | | Degree | 704637.41 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 41L/13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 54 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 250 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Gujarat | Gir Somnath | Kodinar | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11015/154/2018-IA-II(M) | (b)Date of Apply of TOR | 03 Oct 2018 | (c)Date of Issue of TOR / Standard ToR | 11 Dec 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The public hearing is not required as the instant | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Surface Miner SM2200;Wirtgen | 400 TPH | 1 no | (2.) | Front end Loader L554; Liebherr | 3.50 cum | 1 no | (3.) | Front end Loader L580; Liebherr | 50 cum | 1 no | (4.) | Ripper Dozer D275A KOMATSU | Single shank giant ripper | 1 no | (5.) | PC-200 (L&T komatsu) | 0.90 cum | 1 no | (6.) | Tippers AMW 3118 | 18 tonnes | 25 no | (7.) | Tippers TATA (3118) | 18 tonnes | 10 no | (8.) | Surface Miner SM2100;Wirtgen | 200 TPH | 1 no | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 1290000 | Tons per Annum | | Road | | (2.) | Soil | 403572 | Tons per Annum | | Others | Haul road | (3.) | Mining lease area | 417.3584 | Hectares | | Others | . | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | Obtained | (ii)Copies of all Consent to operate obtained since inception | Copy of Consent to Operate | (iii)Date of Issue | 21 Jul 2018 | (iv)Valid Upto | 01 Jul 2023 | (v)File No. | AWH-94734 | (vi)Application No. | 140283 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 150 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.5 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.51 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 335034 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 335034 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 335034 | Others | Liter | IOCL | Road | | 500 | Open Market | | Copy of Linkage | (2.) | Lubricants | 6293 | Others | Liter | IOCL | Road | | 500 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 53.4 | 26.4 | 52.86 | 60 | (2.) | SO2 | | Micro Gram per Meter Cube | 19.70 | 5.81 | 19.42 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 17.36 | 7.80 | 17.16 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 87.4 | 50.2 | 86.656 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | . | . | . | . | (2.) | TDS | | | mg/l | | 526 | 370 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 580 | 346 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 127.3 | 70.9 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 1.4 | 0.32 | 1.0 | 1.5 | (6.) | pH | | | NA | | 7.3 | 7.08 | 6.5 | 8.5 | (7.) | Heavy Metals | | NA | NA | | . | . | . | . | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.98 | 7.72 | D | (2.) | DO | | mg/l | | 7.2 | 4.8 | D | (3.) | BOD | | mg/l | | 7.6 | 4.6 | D | (4.) | COD | | mg/l | | 31.40 | 19.6 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 67.9 | 51.7 | I 70-75, C 55-65, R 45-55, S 40-50 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 60.5 | 41.6 | I 70-75, C 55-65, R 45-55, S 40-50 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 0.47 | 0.23 | (2.) | pH | | | 8.47 | 8.1 | (3.) | N(Nitrogen) | Kilogram per hectare | | 126.8 | 111.7 | (4.) | P(Phosphorus) | Kilogram per hectare | | 35.12 | 32.18 | (5.) | K(Potassium) | Kilogram per hectare | | 225.60 | 155.75 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 06 To 12 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.8 To 8.7 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/1599/GJ/MIN/2016-175 | (f)Date of Issue | 31 Jan 2018 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 225 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4/1599/GJ/MIN/2016-175 | 31 Jan 2018 | 7628 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic & Utility | 10 | 10 | Soak Pit via septic tank | Others | Soak pit via septic tank | 0 | 10 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 10 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Soil | Others | Mine waste | 403572 | Tons | 0 | Road | | Others | for plantation | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 50.3 | 0 | 0 | 50.4 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 82.5 | 0 | 0.0 | 82.6 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 11.70 | 0 | 0 | 11.71 | 80 | (4.) | NOx | | Microgram per Meter Cube | 24.68 | 0 | 0 | 24.69 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | Others | 0 | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 0 | (b)Source | 0 | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 414.8493 | (c)Government Land (ha.) | 2.5091 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 417.3584 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 414.8493 | (b)Waste/Barren Land (ha.) | 2.5091 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 417.3584 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 360 | 100 ha water reservoir and 260 ha backfilled | (2.) | Green belt | | 46 | . | (3.) | Others | Undisturbed | 9.56 | Undisturbed | (4.) | Built Up Area | | 1.80 | Road | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | None | 0 | None | (2.) | WLS | Gir Wildlife Sanctuary | 6.25 | . | (3.) | NPA | None | 0 | None | (4.) | Corridors | None | 0 | none | (5.) | ESZs | ESZ of Gir wildlife sanctuary | 0 | None | (6.) | Wildlife Corridors | None | 0 | None | (7.) | ESAs | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | NOne | (2.) | Defence Installations | | None | 0 | None | (3.) | Others | None | None | 0 | None | (4.) | Archaeological Sites | | None | 0 | None | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 279.0070 | (b)Land yet to be acquired(Ha) | 138.3505 | (c)Status of Land acquisition if not acquired | under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 2 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 101 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 13835.05 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peafowl, Asiatic Lion, and Leopard | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 60 Lakh | (iii)Period of Implementation | 10 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | Yes | (i)Uploaded copy of approval | Copy of approval | (ii)Letter No. | WLP/32/B/8598-99/2018-19 | (iii)Date of issue | 10 Dec 2018 | (iv)Recommendation | conservation plan approved | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Nallah and sub canal | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Shingoda Mine | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 250 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 117 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 117 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 46 | (b)Percentage of Total Project Area | 11.02 | (c)No. of Plants to be Planted | 115000 | (d)Funds Allocated for Plantation | 17250000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | At the end of the life of mine total 360 ha will be excavated out of which 1.80 ha will be used for public/haul road, 100 ha converted to water reservoir, 260 ha will be backfilled, 46 ha will be covered by Greenbelt/plantation, 1.48 ha covered under water bodies (river/nallah/canal/pond) and 8.10 ha area will remain undisturbed. Development of water reservoir will increase the availability of surface water in the area. | (2.) | Social | The project will have positive direct and indirect employment. Manpower is required for mining operations and other mining related activities such as transportation, day to day operations etc. Further, additional employment opportunities will be generated.
The total manpower required for the proposed mining project is around 117 persons. Preference has been given to the local people for employment based on their qualification and eligibility in the mines | (3.) | Financial | The Project will contribute additional revenue to the State and Central Govt. in the form of royalty, cess and other taxes etc.Job opportunities to the local people will improve the earning and spending capacity of the people. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1290000 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | 682(23)(MS-374)/2006-khani kha sa (N) Uday | (b)Date of Approval | 02 Dec 2016 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 417.3584 | (f)Approved Capacity | 1290000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 39.458 | (b)Mineable Reserves (Million Ton) | 22.518 | (c)Extractable Reserves(Million Ton) | 22.518 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | cement grade | (f)Stripping Ratio | 1 : 0 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | gentle slope in north to south direction 0.0015 in 1.0 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 18 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 417.3584 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Lease has already been granted | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 417.3584 | (iii)Validity of the lease deed | From : 02 Sep 2002 To : 01 Sep 2032 | (iv)Date of Execution of Mining Lese | 02 Sep 2002 | (v)Reference Number | nil | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Lease deed valid upto 01.09.2032 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 1.7 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 1.7 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 100 | (b)Depth (in meter) | 10 | (c)Volume (in Million Cubic meter) | 10 | |
|
12. | Details of Quarry: | (a)Final Void of 100 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 360 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | From pit to surface by means of Wheel loader and t | (b)Surface to Siding/Loading | Loading will be done by Front End Wheel Loader. | (c)Transportation / Conveyor Details | From Sugala mine to cement plant located at Ambuja | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 414.8493 | 0 | 414.8493 | (2.) | GRAZING LAND | | 0 | 0 | 0 | (3.) | WASTE LAND | | 2.5091 | 0 | 2.5091 | (4.) | SETTLEMENTS | | 0 | 0 | 0 | (5.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (6.) | FOREST LAND | | 0 | 0 | 0 | (7.) | OTHERS(Specify) | 0 | 0 | 0 | 0 | |
TOTAL | 417.3584 | 0 | 417.3584 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 46 | 0 | 0 | | 46 | (2.) | Other | Undisturbed area and stream | 0 | 1.48 | 8.0784 | | 9.5584 | (3.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (4.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (6.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (7.) | ROADS | | 0 | 0 | 1.80 | | 1.8 | (8.) | EXCAVATION/QUARRY | | 0 | 100 | 260 | | 360 | (9.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 46 | 101.48 | 269.8784 | 0 | 417.3584 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 100 (hectare) at a Depth of 10 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 1500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 1.80 | (h)Total afforestation plant (in hectare) | 306 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 200203 | 1040000 | 1290000 | 1290000 | 73251 | 0 | (2.) | 201011 | 1290000 | 1290000 | 1290000 | 1277822 | 0 | (3.) | 201516 | 1290000 | 1290000 | 1293529 | 1289577 | 0 | (4.) | 201819 | 1290000 | 1290000 | 1290000 | 1289551 | 0 | (5.) | 200405 | 1040000 | 1290000 | 1290000 | 1039818 | 0 | (6.) | 201213 | 1290000 | 1290000 | 1288796 | 1257075 | 0 | (7.) | 200506 | 1040000 | 1290000 | 1290000 | 1039777 | 0 | (8.) | 200910 | 1290000 | 1290000 | 1290000 | 1289843 | 0 | (9.) | 201314 | 1290000 | 1290000 | 1289351 | 1218109 | 0 | (10.) | 200304 | 1040000 | 1290000 | 1290000 | 1039953 | 0 | (11.) | 200607 | 1040000 | 1290000 | 1290000 | 1039881 | 0 | (12.) | 200809 | 1290000 | 1290000 | 1290000 | 1281161 | 0 | (13.) | 201617 | 1290000 | 1290000 | 1292494 | 1288637 | 0 | (14.) | 201718 | 1290000 | 1290000 | 1290000 | 1245886 | 0 | (15.) | 201112 | 1290000 | 1290000 | 1290000 | 1231742 | 0 | (16.) | 200708 | 1290000 | 1290000 | 1290000 | 1289499 | 0 | (17.) | 201415 | 1290000 | 1290000 | 1281918 | 1281714 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | JM EnviroNet Pvt Ltd | (iii)Address | J.M EnviroNet Pvt. Ltd., 202-A, ABW Tower, M.G. Road, Near IFFCO Chowk,, Gurugram - 122 001 (Haryana) | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0112469540 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | PP is requested to submit the following:
1. All submitted document showed that the lease area is 417.35.84 ha; however, PP submitted the application for 417.3584 ha. So, it is unclear that what is the lease area for this proposal? Clarify the same with documentary proof.
2. The executed lease deed is in the name of M/s. Gujarat Ambuja Cement Ltd. Please clarify the same.
3. Provide the details of earlier public hearing with the necessary document.
4. Authenticated English translated copy for past production details since inception of mine.
5. Letter of authorization for the person who is responsible for this proposal. Whether it is Mr. Sanjeew Kumar Singh or Mr.Sukurj Ramarao? Please clarify the same with documentary proof. | 06 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 27 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting ADS Reply | 16 Oct 2020 | 2. | NA | Deferred the proposal
| 20 Nov 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sanjeew Kumar Singh | Designation | Manager - Environment | Name of Company (Applicant Name should not be given here) | AMBUJA CEMENT LIMITED | Address | 228, Udyog Vihar, Phase-I, Gurgaon, Haryana - 122016 |
|