Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion of Satyawadi Raja Harish Chandra At Sector-A1,Narela,Delhi
(b)Name of the Company / Organisation PUBLIC WORKS DEPARTMENT HEALTH NCT NEW DELHI
(c)Registered Address Dr.B.S.A Hospital Parishar, Sector- 6, Rohini ,Delhi,,North West,Delhi-110085
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant GS Kohli
(b)Designation (Owner/ Partner/ CEO) EE
(c)Address Dr.B.S.A Hospital Parishar, Sector-6, Rohini, Delhi,,Saraswati Vihar,North West,Delhi-110085
(d)Pin code 110085
(e)E-mail srhc53938@gmail.com
(f)STD Code. 120(f)Telephone No. 4352889
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity1(a) Mining of minerals
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/111236/2019
(d)Master Proposal Number(Single Window) SW/111234/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. plot no. 30 main road sector-A7
(b)Pincode 110040
(c)Bounded Latitudes (North)
From
Degree 25
Minutes
Second
From
Degree 30
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75
Minutes
Second
From
Degree 78
Minutes
Second
(e)Survey of India Topo Sheet No. 123
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 600
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason this is building construction
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)building construction projectexpansionexpansion
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)3.663.66HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Apr 2019
(iv)Valid Upto 10 Feb 2022
(v)File No. 123
(vi)Application No. 123
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 204.35
(b) Funds Allocated for Environment Management (Capital) (in Crores) 204.35
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.53
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 204.35
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)111Tons per Annum1Road1 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 May 2019 To 31 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube1986413160
(2.)SO2Micro Gram per Meter Cube16.912.814.880
(3.)OtherscoMili Gram per Meter Cube2.071.831.954
(4.)PM10Micro Gram per Meter Cube482263219100
(5.)NOxMicro Gram per Meter Cube60.255.157.6580
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l180120100200
(2.)TDSmg/l50040010642000
(3.)Total Hardnessmg/l380375200600
(4.)Heavy Metalsironmg/l0.150.101.02
(5.)Chloridesmg/l2702602501000
(6.)Fluoridemg/l0.80.511.5
(7.)pHNA8.56.57.778
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l94A
(2.)pHNA8.56.5A
(3.)BODmg/l32A
(4.)CODmg/l250200C
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))525153.6
(2.)Leq(Night)A-weighted decibels(dB(A))464344.2
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare255253
(2.)Electric ConductivityMillisiemens per Centimetre388384
(3.)N(Nitrogen)Kilogram per hectare215212
(4.)P(Phosphorus)Kilogram per hectare1715
(5.)pH97
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 28
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 30 To 35
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface5372Copy of Permission LetterPipelineTube Well12322 Apr 2019537
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Waste water298380STP ETPReuse within the Plant & Recycling298
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 298
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 298
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)solid wasteMunicipal Solid Waste1226.3Kilolitre3RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube48225492100
(2.)PM2.5Microgram per Meter Cube1982520560
(3.)SO2Microgram per Meter Cube16.5252280
(4.)NOxMicrogram per Meter Cube60.2256680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG setDiesel39.450.3PM102065
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 5820
(b)Source DG SET
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3*1500KVA
(e)Stack Height (in m) 33.45
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 3.663
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.663
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : plot area 3.663
    Total (ha.) 3.663
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt1.019
Total (ha.) 1.019
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted Areaanand parbat20.64NA
(2.)WLSOkhla bird sanctuary32.81NA
(3.)ESZsNazagarh drain2.82NA
(4.)ESAsCentral ridge reserve forest25.10NA
(5.)NPAnational park20.5NA
(6.)Wildlife CorridorsNA0NA
(7.)CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNA0NA
(2.)Archaeological SitesNA0NA
(3.)ForestCentral ridge forest25.10NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 89
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 45
(b)Permanent Employment-During Operation 45
(c)Temporary Employment- During Construction 35
(d)Temporary Employment- During Operation 25
(e)No. of working days 5
(f)Total Manpower 150
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.019
(b)Percentage of Total Project Area 27.82
(c)No. of Plants to be Planted 480
(d)Funds Allocated for Plantation 0.5
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialHealth Care
(2.)FinancialHospital Project
(3.)EnvironmentalSTP,ETP,Greenbelt
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 33.45
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 36630
(e)Total built up area (sqm) 73285.55
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 8
(b)Capacity 21.19
(c)No. of Recharge Pits 8
(d)Capacity 21.19
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 4
5.
Energy Saving Measures:
(a)Source/Mode solar pannel
(b)Percentage 50
(c)Quantity 456.19
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Government hospital
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1518/IA0017
(ii)Name of the EIA Consultant M/s Amaltas Enviro Industtrial Consultant LLP(AEC)
(iii)Address Noida
(iv)Mobile No. 9810085736
(v)Landline No. 0120435288
(vi)Email Id mervyn.atmos@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply (Proposal no- IA/DL/MIS/111236/2019; file no- 21/64/2019-IA-III) 18 Feb 2020
2.NAAnnexures in respect of observation (ii) and (vi) mentioned in the ADS reply letter are not available. Kindly upload the same. 14 Jan 2020
3. ADS Reply LetterNA 04 Jan 2020
4.NA

Kindlly see final minutes of 43rd EAC (Infra-II) meeting held on 20-22, August 2019

05 Sep 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantGS Kohli
DesignationEE
Name of Company (Applicant Name should not be given here)PUBLIC WORKS DEPARTMENT HEALTH NCT NEW DELHI
AddressDr.B.S.A Hospital Parishar, Sector- 6, Rohini ,Delhi
Print