Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Indian Oil Corporation Limited LPG Bottling Plant Barapani, Meghalaya
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED MEGHALAYA
(c)Registered Address IOCL LPG Bottling Plant, Umium, Near Shillong, Ri-Bhoi, Meghalaya,,Ri Bhoi,Meghalaya-793103
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Parthiv Dhar
(b)Designation (Owner/ Partner/ CEO) CMLPGE
(c)Address Indian Oil AOD State Office, Indian Oil Bhavan, Sector III, Noonmati, Guwahati, Assam,,Guwahati,Kamrup,Assam-781020
(d)Pin code 781020
(e)E-mail pdhar@indianoil.in
(f)STD Code. 891(f)Telephone No. 2755528
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
(b)Category B1
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry TOR issued by EAC, Industry-II vide No.IA-J-11011/325/2018-IA-II(I) dated 29.11.2018. Hence applying
(c)Proposal Number IA/ML/IND2/82553/2018
(d)Master Proposal Number(Single Window) SW/111061/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. IOCL Premises, Umiam Village, Ri-Bhoi district
(b)Pincode 793103
(c)Bounded Latitudes (North)
From
Degree 25.680416
Minutes
Second
From
Degree 25.682859
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 91.908969
Minutes
Second
From
Degree 91.910232
Minutes
Second
(e)Survey of India Topo Sheet No. 78O/14
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 998
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 00
(j)Seismic Zone 5
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Meghalaya
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MeghalayaRi BhoiUmsning
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/325/2018-IA-II(I)
(b)Date of Apply of TOR 22 Oct 2018
(c)Date of Issue of TOR / Standard ToR 29 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Mar 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Apr 2019
Distance of Public Hearing Venue from the Proposed Project :00
IOCL Premises, Umiam Pyllun, Ri-Bhoi district
State :Meghalaya
District :Ri Bhoi
Tehsil :Umsning
Village :Umiam
60Local Employment and InfrastructureDeputy Commissioner
(2.)
Date of Advertisement :23 Mar 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :23 Apr 2019
Distance of Public Hearing Venue from the Proposed Project :00
IOCL Premises, Umiam Pyllun, Ri-Bhoi district
State :Meghalaya
District :Ri Bhoi
Tehsil :Umsning
Village :Umiam
60Local EmploymentDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LPG Bottling PlantLPG Storage and Bottling Plant
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG Bottling30OthersTMTPARoad
(2.)LPG Storage450OthersMT MSVRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 73.98
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.62
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.4796
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.135
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LPG30000OthersMTPANARoad,OthersNA0 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube18.311.90080
(2.)PM10Micro Gram per Meter Cube64.541.700100
(3.)NOxMicro Gram per Meter Cube20.414.10080
(4.)PM2.5Micro Gram per Meter Cube36.718.10060
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l24.918.35002000
(2.)Heavy MetalsIronmg/l0.130.070.30.3
(3.)Total Hardnessmg/l9.17.0300600
(4.)Chloridesmg/l6.44.22501000
(5.)Fluoridemg/l0.360.271.01.5
(6.)pHNA7.06.76.58.5
(7.)TSSmg/l00000000
    14.3.     No. of Surface Water monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l1.11.0C
(2.)pHNA7.37.1C
(3.)DOmg/l6.76.6C
(4.)CODmg/l2.72.4C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.952.4Industrial 75 / Residential 55
(2.)Leq(Night)A-weighted decibels(dB(A))44.241.9Industrial 70 / Residential 45
    14.5.     No. of Soil Sample Monitored locations : 5
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.16.6
(2.)N(Nitrogen)Kilogram per hectare291244
(3.)P(Phosphorus)Kilogram per hectare26.421.9
(4.)K(Potassium)Kilogram per hectare131.2126.5
(5.)Electric ConductivityOthersmicro ohms/cm174139
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.95 To 5.14
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater100 Not Appliacble modeOthersNAOthersBore well029 Nov 201810
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic4.04.0Septic Tank followed by soak pitOthersSeptic Tank4.000
(2.)Cylinder washings4.04.0ETPReuse within the Plant & Recycling4.0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)GarbageMunicipal Solid Waste14.5Tons0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube18.30018.480
(2.)PM10Microgram per Meter Cube64.500.1564.7100
(3.)PM2.5Microgram per Meter Cube36.70036.860
(4.)NOxMicrogram per Meter Cube20.40020.580
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetHSD50.15NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source MPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x250KVA and 1x160 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 6.879
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 6.879
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 6.879
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 6.879
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.6
(2.)Green belt2.27
Total (ha.) 6.87
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)NPANA0NA
(3.)ESAsNA0NA
(4.)ESZsNA0NA
(5.)CorridorsNA0NA
(6.)Critically Polluted AreaNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)OthersWater bodiesUmiam Lake1.1NA
(3.)ForestUmkhuti Protected forest0Adjacent to site on east side
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? Yes
(i)Uploaded Noc / Permission from the competent authority Copy of Noc / Permission from the competent authority
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 200
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 6.879
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Umiam Lake
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 1.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 12
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 71
(e)No. of working days 300
(f)Total Manpower 83
32.
Green Belt in Ha:
(a)Total Area of Green Belt 2.27
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 2500
(d)Funds Allocated for Plantation 15.0
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialAvailability of LPG
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 152
(ii)Name of the EIA Consultant SV ENVIRO LABS AND CONSULTANTS
(iii)Address Enviro House, B-1, Block-B, IDA, Autonagar, Visakhapatnam
(iv)Mobile No. 9440338628
(v)Landline No. 0891275552
(vi)Email Id svenviro_labs@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease see this Ministry's Notification dated 13/6/2019 for applicability of the EIA Notification, 2006 to the said project. 27 Jul 2019
2.NAThe correction have been made as per the instruction received 27 Aug 2019
3.NAPlease see our observations dated 27/7/2019. 27 Aug 2019
4.NAThe correction have been made as per the instruction received 06 Sep 2019
5.NAMay kindly refer to the our earlier observations. You are requested to refer to the notification SO 1960 (E) dated 13.06.2019 and accordingly you may proceed. 07 Oct 2019
6.NAThe correction have been made as per the instruction received 04 Feb 2020
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantParthiv Dhar
DesignationCMLPGE
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED MEGHALAYA
AddressIOCL LPG Bottling Plant, Umium, Near Shillong, Ri-Bhoi, Meghalaya
Print