Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Establishment of synthetic organic chemicals by M/s. Bhimani Dye Chem Industries located at Plot No. 02, S. No. 316, Dhanot, Ta - Kalol, Dist - Gandhinagar.
(b)Name of the Company / Organisation BHIMANI DYECHEM INDUSTRIES
(c)Registered Address Plot no. 2, Survey No. 316, Opp. Dharti Industrial Estate, Ta: Kalol, Gandhinagar,,Gandhinagar,Gujarat-382721
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bhavin Jayesh Bhimani
(b)Designation (Owner/ Partner/ CEO) Partner
(c)Address 507, Mahakant, Opp. V.S. Hospital, Ellisbridge, Ahmedabad,,Kalol,Gandhinagar,Gujarat-380006
(d)Pin code 380006
(e)E-mail bhavin@bhimanigroup.com
(f)STD Code. 79(f)Telephone No. 26575474
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/81447/2018
(d)Master Proposal Number(Single Window) SW/110885/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No. 2, Survey No. 316, Opp. Dharti Industrial
(b)Pincode 382715
(c)Bounded Latitudes (North)
From
Degree 23.286754
Minutes
Second
From
Degree 23.287735
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.416908
Minutes
Second
From
Degree 72.417177
Minutes
Second
(e)Survey of India Topo Sheet No. 43
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 73
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratGandhinagarKalol
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/349/2018-IA-II(I)
(b)Date of Apply of TOR 22 Oct 2018
(c)Date of Issue of TOR / Standard ToR 29 Nov 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :17 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :19 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project Site of M/s. Bhimani Dye Chem Industries
State :Gujarat
District :Gandhinagar
Tehsil :Kalol
Village :Dhanot
63Effluent management, Employment, Greenbelt, management of Hazardous waste, CSR activity etc.OthersGAS - Additional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Vessel (1)M S R L (1 Nos.)5000 Ltr
(2.)Vessel (2)M S R L (1 Nos.)10000 Ltr
(3.)Vessel (4)M S R L (1 Nos.)30000 Ltr
(4.)Vessel (3)M S R L (1 Nos.)20000 Ltr
(5.)PulverizerC.I (1 Nos.)70 kgs/Hour
(6.)Tray DryerM.S. (3 Nos.)200 Tray
(7.)Steam BoilerMS (1 Nos.)1 TPH
(8.)Spin Flash DryerS.S. (1 Nos.)200 Ltr. / Hour
(9.)Air CompressorMS (1 Nos.)10 H.P.
(10.)Vessel (6)M S R L (1 Nos.)60000 Ltr
(11.)Spray DryerMS (1 Nos.)700 lit/Hr.
(12.)Hot Air GeneratorS.S. (1 Nos.)10 Lacs KCal
(13.)Vessel (6)M S R L (1 Nos.)60000 Ltr
(14.)Ball mill – 3MS (2 Nos.)5000 Kgs
(15.)R.O. PlantS.S. (1 Nos.)120 Ltr / Hour
(16.)Filter PressS.S. (1 Nos.)200 Ltr / Hour
(17.)Small BoilerMS (1 Nos.)0.6 TPH
(18.)Ball mill – 1MS (1 Nos.)2000 Kgs
(19.)Ball mill – 2MS (1 Nos.)500 Kgs
(20.)Hot Air GeneratorSS (1 Nos.)2.0 Lacs Kcal
(21.)Vessel (5)M S R L (1 Nos.)50000 Ltr
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)PAABSA75OthersMT/MonthRoad
(2.)SPCP75OthersMT/MonthRoad
(3.)N.W. Acid75OthersMT/MonthRoad
(4.)Sodium Naphthionate75OthersMT/MonthRoad
(5.)K-Acid75OthersMT/MonthRoad
(6.)Reactive Black 8/HN120OthersMT/MonthRoad
(7.)Reactive Black WNN / Black Mix120OthersMT/MonthRoad
(8.)Reactive Black 5/B120OthersMT/MonthRoad
(9.)Reactive Blue 222/BF120OthersMT/MonthRoad
(10.)Reactive Orange 12/Golden Yellow HR120OthersMT/MonthRoad
(11.)Reactive Orange 13/H2R120OthersMT/MonthRoad
(12.)Reactive Yellow 42/FG120OthersMT/MonthRoad
(13.)Reactive Turquoise Blue 21/G120OthersMT/MonthRoad
(14.)Reactive Orange 122/ ME2RL120OthersMT/MonthRoad
(15.)Direct Orange 39120OthersMT/MonthRoad
(16.)Direct Yellow 86120OthersMT/MonthRoad
(17.)Direct Yellow 11/ Paper Yellow R120OthersMT/MonthRoad
(18.)Direct Violet 9/ BRILL Violet B120OthersMT/MonthRoad
(19.)Direct Blue 86/ Turquoise Blue GL120OthersMT/MonthRoad
(20.)Direct blue 1/ FF120OthersMT/MonthRoad
(21.)Acid Brown75/CR120OthersMT/MonthRoad
(22.)Acid green 68120OthersMT/MonthRoad
(23.)Acid Yellow 36120OthersMT/MonthRoad
(24.)Acid Violet 90/ Bordeaux MB120OthersMT/MonthRoad
(25.)Tartrazine120OthersMT/MonthRoad
(26.)Sunset Yellow120OthersMT/MonthRoad
(27.)Chocolate Brown120OthersMT/MonthRoad
(28.)Ponceau 4R120OthersMT/MonthRoad
(29.)Disperse Orange 2530OthersMT/MonthRoad
(30.)Disperse Yellow 21130OthersMT/MonthRoad
(31.)MUA75OthersMT/MonthRoad
(32.)Reactive Blue 194/ Navy Blue ME2GL120OthersMT/MonthRoad
(33.)Reactive Yellow 15/GR120OthersMT/MonthRoad
(34.)Reactive Yellow 18/H4G120OthersMT/MonthRoad
(35.)Reactive Yellow 145/Golden Yellow MERL120OthersMT/MonthRoad
(36.)Reactive Red 198/ RB120OthersMT/MonthRoad
(37.)Acid Blue 193/ Blue MTR120OthersMT/MonthRoad
(38.)Acid black 194/MSRL120OthersMT/MonthRoad
(39.)Acid Red 131120OthersMT/MonthRoad
(40.)Acid Black 210/NT120OthersMT/MonthRoad
(41.)Solvent Red 24120OthersMT/MonthRoad
(42.)Solvent Yellow 33120OthersMT/MonthRoad
(43.)Solvent Green 3120OthersMT/MonthRoad
(44.)Disperse Blue 36630OthersMT/MonthRoad
(45.)Disperse Blue 7930OthersMT/MonthRoad
(46.)Reactive Yellow 160/ME4GL120OthersMT/MonthRoad
(47.)Reactive Red 195/ ME4BL120OthersMT/MonthRoad
(48.)Direct Black 22/ VSF120OthersMT/MonthRoad
(49.)Direct Red 31/ 12B120OthersMT/MonthRoad
(50.)Acid Blue 113120OthersMT/MonthRoad
(51.)Solvent Blue 36120OthersMT/MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4.5
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.995
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.018
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 3.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 97
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 97
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)All Raw Material43260Tons per AnnumLocal Market/ Various TradersRoad100 Open MarketCopy of Linkage
(2.)1,2,4, Diazo480Tons per AnnumLocal Market/ Various TradersRoad100 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 07 Mar 2018 To 27 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube65.3130.7264.9460
(2.)SO2Micro Gram per Meter Cube35.079.4233.0180
(3.)NOxMicro Gram per Meter Cube56.8217.0553.1280
(4.)PM10Micro Gram per Meter Cube89.5366.7788.89100
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.17.37.07.5
(2.)TSSmg/l1111.5
(3.)Total Hardnessmg/l267201200600
(4.)Fluoridemg/l0.70.51.01.5
(5.)Heavy MetalsIronmg/l0.260.081.01.5
(6.)TDSmg/l10096415002000
(7.)Chloridesmg/l388234.32501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l48.84A
(2.)BODmg/l122A
(3.)DOmg/l00A
(4.)pHNA8.27.9A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))514470
(2.)Leq(Day)A-weighted decibels(dB(A))585375
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram4480.017
(2.)pH8.47.8
(3.)K(Potassium)Milligram per Kilogram7147
(4.)P(Phosphorus)Milligram per Kilogram11.074.68
(5.)Electric ConductivityOthersOhm/cm725181
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 40
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 20
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersLocal Water Tanker8510 Not Appliacble PipelineOthersBy PipelineNA06 Jun 201885
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic50.0Septik TankOthersSoak pit0.05
(2.)Industrial44.5100Primary TreatmentOthersCommon Spray Dryer0.044.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 49.5
(b)Total Discharged Water (Kilolitre per Day) 49.5
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Process WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)48Tons50RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Dilute HCl (25%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)307Tons100RoadOtherssell to Actual users having rule 9 permission
(3.)Sodium Bisulfite (28%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)2010Tons50RoadOthersReuse or Sell to actual users
(4.)Ammonium Hydroxide (25%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)1602Tons50RoadOthersReuse or Sell to actual users
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons80RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.020Kilolitre20RoadOthersReuse or sell to refiners
(7.)Glauber SaltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)300Tons50RoadOtherssell to actual users
(8.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)5Tons50RoadOthersSend to common incineration site
(9.)Discarded containers/Bags/DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)80Tons50RoadOthersUsed for packing of ETP waste or return back
(10.)Spent Acid (40-45%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)9966Kilolitre100RoadOtherssell to Actual recycler having rule 9 permission
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube87.382.53.4890.87100
(2.)NOxMicrogram per Meter Cube49.512.50.3949.9180
(3.)PM2.5Microgram per Meter Cube44.592.53.0047.6060
(4.)SO2Microgram per Meter Cube35.072.50.6235.780
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam Boiler - 2 (3 TPH)Coal/Lignite/Agrowaste300.9OthersSPM, SO2, NOx0.1736,0.01736,0.01026
(2.)Steam Boiler -1 (3 TPH)Coal/Lignite/Agrowaste300.9OthersSPM, SO2, NOx0.289,0.0289,0.01709
(3.)Hot Air Generator (10 Lac. K. Cal/Hr.)Coal/Lignite/Agrowaste300.9OthersSPM, SO2, NOx0.17361,0.01736,0.10264
(4.)Reaction Vessel---110.3OthersNH30.0280
(5.)Spray Dryer---110.3PM100.0280
(6.)Reaction Vessel---110.3SO20.0015
(7.)Reaction Vessel---110.3OthersHCl0.0190
(8.)DG Set (125 KVA)Diesel110.3OthersSPM, SO2, NOx0.0000046,0.000644,0.00154
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 95
(b)Source Uttar Gujarat Vij Co. Ltd.
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) DG Set (125 KVA)
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 0.3344
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 0.3344
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 21104.00
(b)Waste/Barren Land (ha.) 0.0
(c)Grazing/ Community Land (ha.) 0.0
(d)Surface Water Bodies (ha.) 164.21
(e)Settlements (ha.) 0.0
(f)Industrial (ha.) 1110.48
(g)Forest (ha.) 0.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Habitation,Plantation,Open Vegetation 9035.89
    Total (ha.) 31414.579999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.3344No
Total (ha.) 0.3344
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo Critically Polluted area100None within 10 km
(2.)WLSnone100None within 10 km
(3.)NPAnone100None within 10 km
(4.)ESAsnone100None within 10 km
(5.)ESZsnone100None within 10 km
(6.)Corridorsnone100None within 10 km
(7.)Wildlife Corridorsnone100None within 10 km
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone100None within 10 km
(2.)Defence InstallationsNone100None within 10 km
(3.)Archaeological SitesNone100None within 10 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.3344
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 28
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 12
(e)No. of working days 326
(f)Total Manpower 40
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.1105
(b)Percentage of Total Project Area 33.04
(c)No. of Plants to be Planted 60
(d)Funds Allocated for Plantation 150000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Increases
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 15
(ii)Name of the EIA Consultant BHAGWATI ENVIRO CARE PVT. LTD
(iii)Address Plot No.: 28,29,30, Parmeshwar Estate-II, Opp. AMCO Bank, Phase-1, GIDC Estate, Vatva, Ahmedbad, -382445, Gujarat, India
(iv)Mobile No. 9824051541
(v)Landline No. 0794008305
(vi)Email Id tech5@bhagwatienviro.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBhavin Jayesh Bhimani
DesignationPartner
Name of Company (Applicant Name should not be given here)BHIMANI DYECHEM INDUSTRIES
AddressPlot no. 2, Survey No. 316, Opp. Dharti Industrial Estate, Ta: Kalol, Gandhinagar
Print