1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | M/s Maihar Cement (A Division of Century Textile & Industries Limited) Increase in clinker production from 3 million TPA to 4 million TPA and cement production from 5 million TPA to 6 million TPA thro | (b)Name of the Company / Organisation | MAIHAR CEMENT (CENTURY TEXTILES & INDUSTRIES LTD) | (c)Registered Address | Post Sarla Nagar,,Satna,Madhya Pradesh-485772 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sajay Joshi | (b)Designation (Owner/ Partner/ CEO) | President | (c)Address | Post Sarla Nagar,,Tehsil- Maihar Dist Satna,Maihar,Satna,Madhya Pradesh-485772 | (d)Pin code | 485772 | (e)E-mail | sailesh.pandey@adityabirla.com | (f)STD Code. | 0(f)Telephone No. | 277067 | (g)Fax No. | 2772836 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/IND/73253/2018 | (d)Master Proposal Number(Single Window) | SW/110793/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 2142 | (b)Pincode | 485772 | (c)Bounded Latitudes (North) | | From | | Degree | 24.19143611 | Minutes | | Second | | From | | Degree | 24.20822222 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 80.78972222 | Minutes | | Second | | From | | Degree | 80.80805556 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 63D16 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 441 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.50 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Satna | Maihar | | (2.) | Madhya Pradesh | Satna | Maihar | Sarlanagar | (3.) | Maharashtra | Solapur | Mohol | Chincholi | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/113/2018-IA-II(I) | (b)Date of Apply of TOR | 28 Feb 2018 | (c)Date of Issue of TOR / Standard ToR | 19 Apr 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Mar 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.10 |
| Aganwadi Center, Chopra no. 1 | State : | Madhya Pradesh | District : | Satna | Tehsil : | Maihar | Village : | Chopra no. 1, Post Sarla Nagar |
| 71 | S.N. Name & Address (Shri) Issues raised Comments of the applicant
1 Kailash Dwivedi,
Village- Sonwari, Tehsil- Maihar Dist Satna (MP) The unemployment problem has been reduced from the inceptio | District Collector | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Cement | 5MTPA to 6MTPA | | (2.) | Clinker | 3MTPA to 4MTPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Cement | 6000000 | Tons per Annum | | Road,Rail | | (2.) | Clinker | 4000000 | Tons per Annum | | Conveyor Belt | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 05 Nov 2018 | (iv)Valid Upto | 30 Sep 2019 | (v)File No. | 87523 | (vi)Application No. | 13057 | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 80 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 11.34 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 6 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 940380000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 940380000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Fly ash | 2040000 | Tons per Annum | | captive and purchase | Rail | | 4 | Captive | | Copy of Linkage | (2.) | Coal | 632000 | Tons per Annum | | Linkage/ e-auction/ purchase | Road,Rail | | 250 | Linkage | | Copy of Linkage | (3.) | Pet coke as fuel for lime kiln | 395000 | Tons per Annum | | Linkage/ e-auction/ purchase | Road,Rail | | 500 | Linkage | | Copy of Linkage | (4.) | Bauxite | 592000 | Tons per Annum | | purchase | Conveyor Belt | | 100 | Open Market | | Copy of Linkage | (5.) | GYPSUM | 180000 | Tons per Annum | | purchase | Rail | | 250 | Open Market | | Copy of Linkage | (6.) | LATERITE | 177600 | Tons per Annum | | captive and purchase | Road,Conveyor Belt | | 8 | Captive | | Copy of Linkage | (7.) | Limestone | 5920000 | Tons per Annum | | captive and purchase | Road,Conveyor Belt | | 8 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2018 To 31 May 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 30.05 | 16.66 | 29.90 | 60 | (2.) | Others | CO | Mili Gram per Meter Cube | 1 | 1 | 1 | 4 | (3.) | SO2 | | Micro Gram per Meter Cube | 6.97 | 6.0 | 6.69 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 25.48 | 8.0 | 25.42 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 77.09 | 42.24 | 71.94 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 681 | 84 | 500 | 2000 | (2.) | Fluoride | | | mg/l | | 1.00 | 0.10 | 1 | 1.5 | (3.) | pH | | | NA | | 8.28 | 6.37 | 6.5 | 8.5 | (4.) | TSS | | | mg/l | | 70 | 8 | 100 | 100 | (5.) | Total Hardness | | | mg/l | | 452 | 76 | 300 | 600 | (6.) | Chlorides | | | mg/l | | 127.96 | 5.99 | 250 | 1000 | (7.) | Heavy Metals | | Fe | mg/l | | 0.05 | 0.05 | 0.3 | 1.00 | (8.) | Others | NO3 | | mg/l | | 23.87 | 5.27 | 45 | 100 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 70 | 4 | C | (2.) | pH | | NA | | 8.34 | 7.06 | C | (3.) | BOD | | mg/l | | 7 | 2 | C | (4.) | Others | Fe | mg/l | | 0.05 | 0.05 | C | (5.) | DO | | mg/l | | 5.30 | 4.20 | C | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 54.34 | 32.84 | 45 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 76.54 | 53.71 | 55 | |
14.5. No. of Soil Sample Monitored locations : 5 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.82 | 7.20 | (2.) | N(Nitrogen) | Kilogram per hectare | | 294.78 | 75.26 | (3.) | P(Phosphorus) | Kilogram per hectare | | 61.07 | 19.20 | (4.) | K(Potassium) | Kilogram per hectare | | 356.83 | 144.25 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 0.142 | 0.042 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 18.0 To 8.70 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.50 To 17.4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine pit and water reservoir | 3225 | 6 | Not Appliacble | Pipeline | | Others | pumping through pipeline | 2542 | 27 Jan 2009 | 3225 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | DM Water | 10 | 10 | Neutralisation tank | Reuse within the Plant & Recycling | | 10 | | (2.) | domestic (Plant Colony) | 385 | 800 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | Dust suppression | 308 | 77 | (3.) | Cooling Tower | 5 | 05 | neturlisation | Reuse within the Plant & Recycling | | 5 | | (4.) | domestic (Mine Colony) | 60 | 150 | STP | Green Belt Renewal Plant,Others | Dust Suppression | 48 | 12 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 460 | (b)Total Discharged Water (Kilolitre per Day) | 89 | (c)Total Reused Water (Kilolitre per Day) | 371 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | metal scrap | Industrial Waste | | 80 | Tons | 250 | Road | | Authorized Recyclers | | (2.) | Used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 27.74 | Kilolitre | 500 | Road | | Authorized Recyclers | | (3.) | Lead Acid Batteries | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 159 | Tons | 500 | Road | | Authorized Recyclers | | (4.) | Ruuber Belt Scrap | Others | rubber | 80 | Tons | 0 | Others | captive use | Co-Processing | | (5.) | STP sludge | Others | STP | 0.66 | Tons | 0 | Others | captive use | Others | Used as Manure and used for Plantatio | (6.) | Transformer Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4 | Kilolitre | 500 | Road | | Authorized Recyclers | | (7.) | Fly ash | Fly Ash | | 74250 | Tons | 0 | Conveyor Belt | | Others | used for manufacturing of PPC | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 27.36 | 0.50 | 0.85 | 28.32 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 6.38 | 0.50 | 2.00 | 8.38 | 80 | (3.) | NOx | | Microgram per Meter Cube | 9.70 | 0.50 | 3.00 | 12.71 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 67.76 | 0.50 | 0.85 | 68.81 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Kiln no. 3 | coal | 102 | 4.6 | PM10 | | 1.68 | (2.) | Coal Mill No. 4 | coal | 40 | 1.8 | PM10 | | 0.82 | (3.) | Clinker Cooler No.1 | - | 40 | 2.0 | PM10 | | 0.43 | (4.) | Clinker Coller no.2 | - | 40 | 2 | PM10 | | 0.43 | (5.) | Cement Mill no. 1 & 2 | - | 40 | 1.5 | PM10 | | 0.26 | (6.) | Cement Mill No. 3 | - | 40 | 1.8 | PM10 | | 0.27 | (7.) | Cement Mill No. 4 & 5 | - | 31 | 1.3 | PM10 | | 0.26 | (8.) | Thermal power Plant No. 1 | Coal | 70 | 2.5 | PM10 | | 1.70 | (9.) | Thermal Power Plant -2 | coal | 72 | 2.5 | PM10 | | 0.59 | (10.) | Clinker Cooler no. 3 | - | 50 | 4.8 | PM10 | | 2.20 | (11.) | Kiln No. 1 | Coal | 80 | 3.9 | PM10 | | 2.39 | (12.) | Coal Mill No; 5 | coal | 60 | 1.8 | PM10 | | 0.31 | (13.) | Kiln No. 2 | Coal | 80 | 3.9 | PM10 | | 3.41 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 401380 | (b)Source | Captive Power Plant of 31.4MW and MPSEB | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | captive Power Plant of 31.4MW | (e)Stack Height (in m) | 72 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0.0 | (b)Private Land (ha.) | 0.0 | (c)Government Land (ha.) | 199.023 | (d)Revenue Land (ha.) | 0.0 | (e)Other Land (ha.) | 0.0 | Total Land (ha.) | 199.023 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 18850 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 157.79 | (d)Surface Water Bodies (ha.) | 1212.58 | (e)Settlements (ha.) | 1981.00 | (f)Industrial (ha.) | 677 | (g)Forest (ha.) | 10205.00 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Road, Railway line, plantation | 252.97 | Total (ha.) | 33336.340000000004 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 20.2343 | | (2.) | Township | | 30.3514 | | (3.) | Green belt | | 65.2982 | exiting 60.2982ha and proposed 5.0ha | (4.) | Built Up Area | | 53.0138 | Cement plant area | (5.) | Others | Open Area | 30.1251 | Open Area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 100 | none within 10km radius | (2.) | Corridors | NA | 70 | none within 10km radius | (3.) | Wildlife Corridors | NA | 70 | none within 10km radius | (4.) | ESAs | NA | 100 | none within 10km radius | (5.) | NPA | NA | 70 | none within 10km radius | (6.) | ESZs | NA | 70 | none within 10km radius | (7.) | WLS | NA | 100 | none within 10km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | PF | 0 | adjacent | (2.) | Archaeological Sites | | NA | 15 | NONE WITHIN 10KM RADIUS | (3.) | Defence Installations | | NA | 200 | NONE WITHIN 10KM RADIUS | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 199.023 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | running plant | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Barking Deer, the Peacock, Chital, Sambhar, Jungle Cat, Hyena, Fox and Porcupine alongwith the Vultures and the Indian Python | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 258.40lakh | (iii)Period of Implementation | 10year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tamas River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 0.50 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 25 | (e)No. of working days | 330 | (f)Total Manpower | 25 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 65.2982 | (b)Percentage of Total Project Area | 32.81 | (c)No. of Plants to be Planted | 10000 | (d)Funds Allocated for Plantation | 15 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Green belt has already been developed within the existing operational premises & mines with 10,78,000 number of trees. Total area (within plan and colony) covered under plantation is about 149 acres (60 hact) with 8,23,000 number of trees. The green belt is consisting of local species would be preferred. Further development of green belt over 5 hectare of area is also proposed around the plant periphery and open space | (2.) | Social | In line with the OM of MoEFCC dated 1st May 2018, following additional provision has been proposed towards the CER which is altogether does not include the cost of implementation of EMP, conservation plan, etc. The existing cost being incurred pertaining to CER aspect shall continue as per requirement.
Total Cost of proposed Project : 80 Crores
CSR Budget @ 1 % : 0.80 Crores
This amount Rs 80 lacs per year will be spent over a period of 2years (@ Rs 40 Lacs per Year) in addition to the | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA-0071 | (ii)Name of the EIA Consultant | Creative Enviro Services | (iii)Address | SR-4, Shrirm Kunj, Bharat Nagar, Shahpura, Bhopal | (iv)Mobile No. | 9425009319 | (v)Landline No. | 0755429931 | (vi)Email Id | creative.bpl@rediffmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 23 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sajay Joshi | Designation | President | Name of Company (Applicant Name should not be given here) | MAIHAR CEMENT (CENTURY TEXTILES & INDUSTRIES LTD) | Address | Post Sarla Nagar |
|