Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Thiruvallur – Bengaluru RLNG Pipeline section of ETBPNMTPL project
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED PIPELINES DIVISION
(c)Registered Address INDIANOIL BHAWAN A-1,UDYOG MARG,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant AMIT KUMAR
(b)Designation (Owner/ Partner/ CEO) DGM
(c)Address INDIANOIL BHAWAN,A-1 UDYOG BHAWAN,Gautam Buddha Nagar,Gautam Buddha Nagar,Uttar Pradesh-201301
(d)Pin code 201301
(e)E-mail kumaram@indianoil.in
(f)STD Code. 120(f)Telephone No. 2448614
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(a) Oil & gas transportation pipe line (crude and refinery/ petrochemical
Minor Activity
(b)Category A
(c)Proposal Number IA/AP/IND2/74035/2018
(d)Master Proposal Number(Single Window) SW/110780/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 61,98,99
(b)Pincode 517422
(c)Bounded Latitudes (North)
From
Degree 12515.2
Minutes
Second
From
Degree 13150
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77482.7
Minutes
Second
From
Degree 80052.3
Minutes
Second
(e)Survey of India Topo Sheet No. 16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 920
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 3
(c)Main State of the project Andhra Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Andhra PradeshChittoorYadamariYadamari
(2.)Andhra PradeshChittoorPalasamudram
(3.)GujaratPanchmahalKalolMadhvas
(4.)KarnatakaBangalore UrbanAnekalSarjapur
(5.)Tamil NaduTiruvallurUthukkottaiThirukandalam
(6.)Tamil NaduTiruvallurThiruvallur
(7.)KarnatakaBangalore RuralHoskote
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/140/2018-IA-II(I)
(b)Date of Apply of TOR 13 Apr 2018
(c)Date of Issue of TOR / Standard ToR 24 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :07 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :09 May 2019
Distance of Public Hearing Venue from the Proposed Project :0.1
IOCL depot Yadamari
State :Andhra Pradesh
District :Chittoor
Tehsil :Yadamari
Village :Yadamari
54Related to compensation and safetyDistrict Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)R-LNG Pipeline35 MMSCMDR-LNG Pipeline
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)R-LNG35OthersMMSCMDOthersPipeline transportation
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7.2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.2
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.01
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
d)Inter-State boundaries and international boundaries Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 35
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 35
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Natural Gas35OthersMMSCMDEnnoreOthersPipeline34 OthersOfftake agreementCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 14
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube37.911.537.6480
(2.)PM2.5Micro Gram per Meter Cube53.428.253.460
(3.)PM10Micro Gram per Meter Cube90.153.588.6100
(4.)SO2Micro Gram per Meter Cube23.5523.1380
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.236.58.5
(2.)Total Hardnessmg/l385.15313.25200600
(3.)Fluoridemg/l0.900.611.01.5
(4.)Chloridesmg/l188.43102.472501000
(5.)TDSmg/l6444635002000
(6.)TSSmg/l6334505002000
(7.)Heavy Metalshgmg/l0.000010.000010.0010.001
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.767.19B
(2.)CODmg/l47.5219.26C
(3.)DOmg/l6.95.9B
(4.)BODmg/l7.140.04A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))46.2142.155
(2.)Leq(Day)A-weighted decibels(dB(A))54.848.3555
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.217.2
(2.)N(Nitrogen)Kilogram per hectare268.68196
(3.)K(Potassium)Kilogram per hectare262.42160.25
(4.)P(Phosphorus)Kilogram per hectare29.1017.61
(5.)Electric ConductivityKilogram per hectare0.6020.13
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.38 To 7.36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 5.30
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTankers53 Not Appliacble modeOthersTankersOthersfrom outside tankersNA16 Jul 20195
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic0.30NILReuse within the Plant & Recycling0.3
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0.3
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0.3
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)E wasteE Waste0.02Tons0RoadOthersbuyback/ authorized re-cycler
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube23.520.000123.500280
(2.)PM10Microgram per Meter Cube90.120.00190.102100
(3.)NOxMicrogram per Meter Cube37.920.000137.900280
(4.)PM2.5Microgram per Meter Cube53.420.000153.400360
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA0000NOx00
(2.)NANA0000SO200
(3.)NANA0000PM1000
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 50
(b)Source State grids of Tamil nadu, Andhra Pradesh and karn
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 15 KVA
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 4.6
(b)Private Land (ha.) 4.27
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 8.87
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20226.96
(b)Waste/Barren Land (ha.) 4084.98
(c)Grazing/ Community Land (ha.) 3995.96
(d)Surface Water Bodies (ha.) 986.21
(e)Settlements (ha.) 184.764
(f)Industrial (ha.) 739.05
(g)Forest (ha.) 4.6
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 30222.523999999994
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersRoU acqusition0Only right of use of land is obtained
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPAna0na
(2.)Corridorsna0na
(3.)Wildlife Corridorsna0na
(4.)ESAsna0na
(5.)WLSKoundinya wildlife sanctuary0Pipeline is passing through WLS
(6.)Critically Polluted Areana0na
(7.)ESZsna0na
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA0NA
(2.)Defence InstallationsNA0NA
(3.)ForestPalamner forest0Pipeline passing through forest area in existing Right of way
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? Yes
(i)Status of NBWL Application for Wildlife Clearance yet to be submitted
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 4.27
(c)Status of Land acquisition if not acquired under acquisition
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species As per EIA report
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 30 lakhs
(iii)Period of Implementation Upon completion of project
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 50
(e)No. of working days 300
(f)Total Manpower 160
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.01
(b)Percentage of Total Project Area 0.22
(c)No. of Plants to be Planted 100
(d)Funds Allocated for Plantation 10000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThis pipeline will evacuate degasified liquid Natural gas from LNG import terminal at Ennore and deliver clean fuel (Natural gas) to consumers located across Tamil Nadu, Andhra Pradesh and Karnataka
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0037
(ii)Name of the EIA Consultant Vardan environet
(iii)Address D-142, Sushant Lok_II, Sector 57, Gurugram
(iv)Mobile No. 9971684812
(v)Landline No. 0
(vi)Email Id industry@vardanenvironet.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 09 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease submit the application for clearance from the Standing Committee of NBWL to consider the proposal for EC. 27 Jul 2019
2.NAThe correction have been made as per the instruction received 30 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAMIT KUMAR
DesignationDGM
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED PIPELINES DIVISION
AddressINDIANOIL BHAWAN A-1
Print