1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Amendment in Existing EC for Proposed Expansion of Styrene Acrylonitrile co-polymer (SAN) plant from 1,20,000 MTA to 1,60,000 MT/Annum and Transfer of EC from M/s. INEOS ABS (India) Limited to M/s. In | (b)Name of the Company / Organisation | INEOS STYROLUTION INDIA LIMITED | (c)Registered Address | 5th Floor, OHM House - II, OHM Business Park,,,Vadodara,Gujarat-390023 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Parvez H Bata | (b)Designation (Owner/ Partner/ CEO) | PlantManager | (c)Address | Halol - katol Road,,Katol,Kalol,Panchmahal,Gujarat-389330 | (d)Pin code | 389330 | (e)E-mail | parvez.bata@styrenix.com | (f)STD Code. | 2676(f)Telephone No. | 228405 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(e) Petrochemical based processing (processes other than cracking &
| Minor Activity | 5(e) Petrochemical based processing (processes other than cracking &
| (b)Category | A | (c)Proposal Number | IA/GJ/IND2/109956/2010 | (d)Master Proposal Number(Single Window) | SW/109894/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot NO. 17, 18/1, 18/2 & 20, 911 (Kalol) | (b)Pincode | 389330 | (c)Bounded Latitudes (North) | | From | | Degree | 22.5990528 | Minutes | | Second | | From | | Degree | 22.5990667 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.45165833 | Minutes | | Second | | From | | Degree | 73.4517055 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43H76, F43H10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 86 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.13 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/133/2010-IA II(I) | (b)Date of Apply of TOR | 15 Mar 2010 | (c)Date of Issue of TOR / Standard ToR | 10 Jun 2010 | (d)Date of Apply of EC | 18 Apr 2011 | (e)Date of Issue of EC | 27 Jan 2012 | (d)Previous TOR Letter | NA | (g)Previous EC Letter | NA | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 Jun 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.7 |
| Suvarna Hall, Kalol housing society, Kalol, Dist. Panchmahal | State : | Gujarat | District : | Panchmahal | Tehsil : | Kalol | Village : | Kalol |
| 51 | Positive approach from villagers. they welcomed expansion so employment will increase and for development of region. No pollution issue they faced. | Others | Resident Additional Collector & Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 5-11/2012(ENV)/175 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 2 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Styrene Acrylonitrile (SAN) | 120000 | 40000 | 160000 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Styrene Acrylonitrile (SAN) | 120000 MTPA | 40000 MTPA | 160000 MTPA | | (2.) | ABS Sheets | 2400 MTPA | -2400 MTPA | 0 | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 07 May 2015 | (iv)Valid Upto | 23 Feb 2020 | (v)File No. | AWH- 70236 | (vi)Application No. | - | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 123 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 3.23 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.9225 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.085 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 9 | (c)Total quantity of raw material/fuel | 9 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Styrene | 9600.48 | Others | MT | Hazira/ GCPTCL | Road | | 230 | Others | Agreement | Copy of Linkage | (2.) | Dicumly peroxide | 12 | Others | MT | Raigadh, Maharastra | Road | | 1300 | Others | through approved supplier | Copy of Linkage | (3.) | Glycerene Monostearate | 25.5 | Others | MT | Malaysia- Hazira | Road | | 230 | Others | through approved supplier | Copy of Linkage | (4.) | Blue Pigment | 0.02 | Others | MT | Dahej | Road | | 180 | Others | through approved supplier | Copy of Linkage | (5.) | Toluene | 66.67 | Others | MT | Hazira | Road | | 230 | Others | Agreement | Copy of Linkage | (6.) | Tert-dodecyl Mercaptans | 45 | Others | MT | Germany- Hazira | Road | | 230 | Others | through approved supplier | Copy of Linkage | (7.) | Acrylonitrile | 3733.52 | Others | MT | Hazira | Road | | 230 | Others | Agreement | Copy of Linkage | (8.) | Ethylene Bis-stereamide | 12 | Others | MT | Malaysia- Hazira | Road | | 230 | Others | through approved supplier | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 21 | 14 | 21 | 80 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 44 | 28 | 43 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 10 | 8 | 10 | 80 | (4.) | Others | VOC | Micro Gram per Meter Cube | 1 | 1 | 1 | NS | (5.) | PM10 | | Micro Gram per Meter Cube | 96 | 73 | 95 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 214 | 97 | 250 | 1000 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | pH | | | NA | | 7.95 | 7.34 | 8.5 | 0 | (4.) | Fluoride | | | mg/l | | 1.59 | 0.73 | 1 | 1.5 | (5.) | Total Hardness | | | mg/l | | 480 | 40 | 200 | 600 | (6.) | TDS | | | mg/l | | 760 | 408 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.8 | 6.54 | A | (2.) | DO | | mg/l | | 4.9 | 3.3 | A | (3.) | BOD | | mg/l | | 22 | 3 | D | (4.) | COD | | mg/l | | 92 | 15 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 70 | 54.1 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 69.5 | 44.1 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Others | dS/m | 0.4 | 0.2 | (2.) | K(Potassium) | Others | g/kg | 0.06 | 0.01 | (3.) | P(Phosphorus) | Others | g/kg | 0.02 | 0.02 | (4.) | N(Nitrogen) | Percent | | 0.08 | 0.06 | (5.) | pH | Others | - | 8.3 | 7.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 15 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 508 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | Nil | 04 Jul 2019 | 493 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 91 | 120 | ETP/ZLD | Green Belt Renewal Plant | | 91 | | (2.) | Domestic | 30 | 20 | STP | Green Belt Renewal Plant | | 30 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 121 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 121 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Sludge from Wastewater purification | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 8.03 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Contaminated Solvent/Mixture of Solvents | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 32.31 | Tons | 148 | Road | | Co-Processing | | (3.) | Discarded contaminated material | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 49.99 | Tons | 135 | Road | | Authorized Recyclers | | (4.) | Dist.residue from contaminated Organic solvent | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 14.6 | Tons | 148 | Road | | Co-Processing | | (5.) | Organic Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 899.35 | Tons | 148 | Road | | Co-Processing | | (6.) | Chemical containing cargo residue & sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 53.53 | Tons | 148 | Road | | Co-Processing | | (7.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 20.2 | Tons | 135 | Road | | Authorized Recyclers | | (8.) | Sludge & filters contaminated with Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.24 | Tons | 148 | Road | | Co-Processing | | (9.) | Asbestos containing residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 4.87 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (10.) | Waste/residue containing oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.97 | Tons | 148 | Road | | Co-Processing | | (11.) | Heavy Metal- having residue in water purification | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 28.23 | Tons | 65 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (12.) | Oil-water cargo residue,washing water&sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 23.91 | Tons | 148 | Road | | Co-Processing | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 17.53 | 1 | 1.42 | 18.96 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | (3.) | PM10 | | Microgram per Meter Cube | 86.8 | 1 | 3.13 | 90 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 8.72 | 1 | 0.01 | 8.74 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 1.06 | 1 | 0.61 | 1.68 | NS | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Incinerator (Removed) | 0 | 0 | 0 | PM10 | | 0 | (2.) | TFH No. 1 & 2 (1 Working + 1 standby) | Natural Gas | 40.5 | 0.49 | PM10 | | 100 mg/m3 Permissible | (3.) | TFH No. 3 & 4 (1 working + 1 Standby) | Natural Gas | 40.5 | 0.49 | PM10 | | 100 mg/m3 Permissble | (4.) | DG Set-1 (1000 kVA) | Diesel | 18 | 0.2 | PM10 | | 100 mg/m3 permissible | (5.) | DG Set- 3 (1250 kVA) | Diesel | 30 | 0.2 | PM10 | | 100 mg/m3 Permissible | (6.) | Atmospheric Vent (Reactor Safety Valves) | - | 15 | 0.2 | Others | HC | 15 mg/Nm3 Permissible | (7.) | Pelletizer Vent blower- Line 1 | - | 15 | 0.2 | Others | HC | 15 mg/Nm3 Permissible | (8.) | Pelletizer Vent blower- Line 2 | - | 15 | 0.2 | Others | HC | 15 mg/Nm3 Permissible | (9.) | Pelletizer Vent Blower- Line 3 | - | 15 | 0.2 | Others | HC | 15 mg/Nm3 Permissible | (10.) | Vent Blower- Line 3, Silo top line 3 | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (11.) | Dust collector H-501 Loading Hopper | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (12.) | Dust Collector NKH 501 R/S | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (13.) | Dust Collector for H 503/ 504/ 506 | - | 9 | 0.15 | PM10 | | 150 mg/Nm3 Permissible | (14.) | Dust Collector H 502 A/ H 502 B | - | 9 | 0.08 | PM10 | | 150 mg/Nm3 Permissible | (15.) | Boiler- 1 & 2 (1 Working+1 Standby) | Natural Gas | 30.5 | 0.8 | PM10 | | 100 mg/m3 Permissible | (16.) | Fume Extraction System at QA lab | - | 9 | 0.15 | Others | HC | 15 mg/Nm3 Permissible | (17.) | Dust Collector H- 503 Loading Hopper | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (18.) | Dust collector Line 2 Silo loading Hopper | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (19.) | DG Set-2 (1500 kVA) | Diesel | 30 | 0.2 | PM10 | | 100 mg/m3 Permissible | (20.) | Pelletizer Vent Blower- Line 3 DB | - | 15 | 0.2 | Others | HC | 15 mg/Nm3 Permissible | (21.) | Dust collector NKH 501 N/P | - | 9 | 0.3 | PM10 | | 150 mg/Nm3 Permissible | (22.) | Dust collector NKH 501 T/U | - | 9 | 0.2 | PM10 | | 150 mg/Nm3 Permissible | (23.) | Dust Collector NKP 501/ KH 502 C | - | 9 | 0.08 | PM10 | | 150 mg/Nm3 Permissible | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2700 | (b)Source | Madhya Gujarat Vij Company (MGVCL) | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 3 No. DG Set of 1000, 1500 & 1250 kVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 4.79 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 4.79 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 23086 | (b)Waste/Barren Land (ha.) | 357 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 880 | (e)Settlements (ha.) | 1994 | (f)Industrial (ha.) | 778 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Vegetation Cover | 6368 | Total (ha.) | 33463 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Others | 2.71 | | (2.) | Main Plant | | 0.37 | Processing area | (3.) | Area for Solid Waste Management | | 0.02 | Haz. waste storage area | (4.) | Green belt | | 1.54 | | (5.) | Built Up Area | | 0.15 | Office area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Wildlife Corridors | None | 0 | Ecological Sensitive area is not present in study area | (2.) | Corridors | None | 0 | Ecological Sensitive area is not present in study area | (3.) | Critically Polluted Area | None | 0 | Ecological Sensitive area is not present in study area | (4.) | WLS | None | 0 | Ecological Sensitive area is not present in study area | (5.) | NPA | None | 0 | Ecological Sensitive area is not present in study area | (6.) | ESAs | None | 0 | Ecological Sensitive area is not present in study area | (7.) | ESZs | None | 0 | Ecological Sensitive area is not present in study area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Mountains/ Hills | Pavagadh Mountain Range | 13.24 | in SSE Direction | (2.) | Defence Installations | | None | 0 | - | (3.) | Forest | | Pavagadh Reserved Forest | 16.68 | in SSE Direction | (4.) | Archaeological Sites | | Champaner monuments: UNESCO World Heritage site | 14.83 | in SSE Direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 4.79 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peacock | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 500000 | (iii)Period of Implementation | 5 year | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Goma River | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 0.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 172 | (d)Temporary Employment- During Operation | 16 | (e)No. of working days | 365 | (f)Total Manpower | 203 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.19 | 0.34 | 1.53 | (2.) | Percentage of Total Project Area | 25 | 7 | 32 | (3.) | No. of Plants | 280 | 2395 | 2675 | (4.) | Funds Allocated | 0 | 249080 | 249080 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | INEOS Styrolution India Limited has initiated up-gradation of Existing school at Katol by Construction of Lunch room in Primary school with utensils provision, installation of RO water plant and water cooler at Katol School. Also Public Announcement system provision is proposed for the school. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0042 | (ii)Name of the EIA Consultant | Kadam Environmental Consultants | (iii)Address | 871/B/3, GIDC Makarpura, Vadodadara, Gujarat 390010 | (iv)Mobile No. | 0265613132 | (v)Landline No. | 0265613100 | (vi)Email Id | kadam@kadamenviro.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 15 Oct 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The project actually involves expansion of SAN from 120000 to 160000 TPA. The proposal needs to be restructured accordingly. To consider the present proposal, existing EC dated 27/1/2012 needs to be first transferred in your name. Please submit separate proposal accordingly for the same. | 11 Aug 2019 | 2. | NA | The correction have been made as per the instruction received | 12 Sep 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Parvez H Bata | Designation | PlantManager | Name of Company (Applicant Name should not be given here) | INEOS STYROLUTION INDIA LIMITED | Address | 5th Floor, OHM House - II, OHM Business Park, |
|