Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Nigahi Opencast Project of M/s Northern Coalfields Limited
(b)Name of the Company / Organisation NIGAHI PROJECT NORTHERN COALFIELDS LIMITED
(c)Registered Address Office of the General Manager, Nigahi Project,PO- Nigahi, Distt-Singrauli,Singrouli,Madhya Pradesh-486884
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant JAI PRAKASH DWIVEDI
(b)Designation (Owner/ Partner/ CEO) General Manager
(c)Address Office of the General Manager, Nigahi Project,PO- Nigahi, Distt.- Singrauli,,Singrouli,Madhya Pradesh-486884
(d)Pin code 486884
(e)E-mail nigahi.environment@gmail.com
(f)STD Code. 7805(f)Telephone No. 276306
(g)Fax No. 07805276306
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity
(b)Category A
(c)Proposal Number IA/MP/CMIN/109926/2019
(d)Master Proposal Number(Single Window) SW/109923/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Project Office :109,110,111,112,113 (part)
(b)Pincode 486884
(c)Bounded Latitudes (North)
From
Degree 24.1009
Minutes
Second
From
Degree 24.1879
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.5912
Minutes
Second
From
Degree 82.6639
Minutes
Second
(e)Survey of India Topo Sheet No. G44W12 (63L/12)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 500
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.7
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 3-17/ 2015/(ENV)/681 dated 18.06.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 14 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Capacity (Coal)18750000225000021000000Tons per Annum(TPA)OthersMGR
(2.)Area3018.4003018.4Hectares(ha)OthersMGR
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Opencast mining of CoalShovel-dumper system and draglineShovel-dumper system and draglineShovel-dumper system and draglineDeployment of 1 number of Surface Miner (3800- 4000 mm) in expansion
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 28 Sep 2016
(iv)Valid Upto 31 Jan 2020
(v)File No. AW46103
(vi)Application No. 220011
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2197.31
(b) Funds Allocated for Environment Management (Capital) (in Crores) 31.0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.00
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 4.28
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Diesel24636OthersKL/ AnnumIOCLRoad2.0 LOACopy of Linkage
(2.)Explosives56083Tons per AnnumBlastec, IOCL, Solar, IEPLRoad3.0 LOACopy of Linkage
(3.)Power15OthersMVAMPPKVVCLOthersNA10 MoUCopy of Linkage
(4.)Water14234Kilo Litre per DayIWSSOthersPipeline12 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.25 To 24.75
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.82 To 24.62
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. NA
(f)Date of Issue 01 Mar 2006
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1423412Copy of Permission LetterPipelineIntake Well649-Cu-II/ NTPC/ 7913 Mar 1979146794.53
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Workshops13204000Sedimentation added with coagulationReuse within the Plant & Recycling1320
(2.)Coal Handling Plant460010500Sedimentation added with coagulationReuse within the Plant & Recycling4600
(3.)Township17003000Activated Sludge ProcessGreen Belt Renewal Plant1700
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 7620
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 7620
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal Solid WasteMunicipal Solid Waste142.350Tons1RoadSanitary Landfills
(2.)Overburden of MineIndustrial Waste183876000Tons2.47OthersInternal RoadsOthersInternal or External Dumping
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube50.006.840.8450.8560
(2.)SO2Microgram per Meter Cube21.001.050.0021.0180
(3.)NOxMicrogram per Meter Cube28.501.050.0028.5180
(4.)PM10Microgram per Meter Cube946.844.5398.54100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)nana00OthersNo stack0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 15000
(b)Source MPEB
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 4 numbers of DG sets
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 1280.517
(b)Private Land (ha.) 1528.883
(c)Government Land (ha.) 209.00
(d)Revenue Land (ha.) 0.00
(e)Other Land (ha.) 0.00
    Total Land (ha.) 3018.40
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1528.883
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 1280.517
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : government land 209
    Total (ha.) 3018.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Township265.00
(2.)Green belt335
(3.)Quarry Area1665
(4.)OB Dump Area418.00
(5.)Safety Zone147including vacant or waste land etc
(6.)OthersOther Infrastructure188.40Workshops ETP CHP Roads and Railways
Total (ha.) 3018.4
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNil0No WLS within 10 Kilometers
(2.)ESAsNil0No ESA within 10 Kilometers
(3.)NPANil0No NPA within 10 Kilometers
(4.)ESZsNil0No ESZ within 10 Kilometers
(5.)CorridorsNil0No Corridors within 10 Kilometers
(6.)Wildlife CorridorsNil0No Wildlife Corridors within 10 Kilometers
(7.)Critically Polluted AreaNil0Project is situated in Singrauli (MP), which is Severely Polluted Area
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNil0No Archaeological Site within 10 Kilometers
(2.)Defence InstallationsNil0No Defence Installation within 10 Kilometers
(3.)Forest1280.517 Ha Forest Land0Forest Clearance has already obtained for this forest land
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3018.4
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 15
(b)No. of Households 32037
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 1309
(e)Funds Allocated for R&R(in INR) (in Lacs) 1437.87
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area GBP Sagar Dam
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 1120
(e)No. of working days 365
(f)Total Manpower 1120
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants15230002000001723000
(2.)Total Area of Green Belt33580415
(3.)Percentage of Total Project Area11.102.6513.75
(4.)Funds Allocated269280005134000078268000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalPost-mining Enhancement of Green Cover
(2.)FinancialFinancial benefits of the adjoining areas: - Increase in Employment Potential - Contribution to the Exchequer
(3.)Socialsocial benefits of the adjoining areas: - Improvements in Physical Infrastructure - Improvements in Social Infrastructure - Meet energy requirement
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)CoalMajor
2.
Mine Capacity in ROM (Run of Mine) 18.75 MTPA
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. OFFICE/29/2837/2019-PnP, NCL HQ-NORTHERN COALFIELD
(b)Date of Approval 23 Apr 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department NCL Board
(e)Approved Mining Lease Area 3018.4
(f)Approved Capacity 21.00
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 561.71
(b)Mineable Reserves (Million Ton) 483.01
(c)Extractable Reserves(Million Ton) 483.01
(d)Percent(%) of Extraction 85.99
(e)Grade of Coal /Ore /Mineral G-10
(f)Stripping Ratio Average Stripping Ration as on 01.04.2019 : 3.94
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA since it is a Opencast Project
(h)Average Gradient(Degree) 2-3 degree
(i)Mining Method Opencast
(j)Life of Mine (Years) 12 from 01.04.2019 (As per mining plan 21.00 MTPA)
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable Yes
(b)No. of seams 3
(c)Thickness of seams to be worked on 18
(d)Maximum Thickness of Seams (metres) Purewa Top : 10.94, Purewa Bottom : 14.70, Turra : 19.20, Purewa Merged (Purewa Top and Bottom merged): 27.50
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 3018.40
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Not Applicable since Nigahi is mine under CPSU und
(c)Whether Lease Deed Executed ? No
(i)Reason thereof All rights of 3018.40 has been acquired under Sub-
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof All rights of 3018.40 has been acquired under Sub-
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 2.1
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 2.1
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of 60 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 1665
13.
Details of Transportation:
(a)In Pit/Underground to Surface Dumpers
(b)Surface to Siding/Loading R/P (CHP) to SILO is done via Closed belt Conveyor
(c)Transportation / Conveyor Details Total number of dumpers : 122 (of capacities 85T,
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND1528.88301528.883
(2.)SETTLEMENTS000
(3.)OTHERS(Specify)Government Land2090209
(4.)FOREST LAND1280.51701280.517
(5.)GRAZING LAND000
(6.)SURFACE WATER BODIES000
(7.)WASTE LAND000
TOTAL3018.403018.4
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)GREEN BELT33500335
(2.)EXTERNAL OB DUMPS41800418
(3.)VIRGIN AREA14700147
(4.)BUILT UP AREA (COLONY/OFFICE)00265265
(5.)OtherETP, CHP, other infrastructure etc00314.4314.4
(6.)TOP SOIL STORAGE0000
(7.)INTERNAL OB DUMPS1405001405
(8.)EXCAVATION/QUARRY060060
(9.)ROADS007474
TOTAL230560653.403018.4
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 418
(b)Internal Dump(in hectare) 1405
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 147
(e)Final Void of 60 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 335
(h)Total afforestation plant (in hectare) 2305
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)1985864.204.204.200.000.00
(2.)1989904.204.204.200.000.00
(3.)1995964.204.204.204.200.00
(4.)20000110.0010.0010.005.400.00
(5.)20010210.0010.0010.006.060.00
(6.)20080915.0015.0015.0011.660.00
(7.)20101115.0015.0015.0012.020.00
(8.)20181918.7518.7518.7518.480.00
(9.)1987884.204.204.200.000.00
(10.)1990914.204.204.201.050.00
(11.)1986874.204.204.200.000.00
(12.)1991924.204.204.201.900.00
(13.)1988894.204.204.200.000.00
(14.)1992934.204.204.202.210.00
(15.)1993944.204.204.202.870.00
(16.)1994954.204.204.203.600.00
(17.)19969710.0010.0010.004.200.00
(18.)19989910.0010.0010.004.130.00
(19.)19990010.0010.0010.004.500.00
(20.)20020310.0010.0010.007.590.00
(21.)20030410.0010.0010.009.500.00
(22.)20040510.0010.0010.0010.400.40
(23.)20060710.0010.0010.0011.101.10
(24.)20091015.0015.0015.0012.360.00
(25.)20070815.0015.0015.0011.300.00
(26.)20111215.0015.0015.0010.880.00
(27.)20131415.0015.0015.0013.650.00
(28.)20151618.7518.7518.7515.010.00
(29.)20161718.7518.7518.7515.520.00
(30.)20171818.7518.7518.7517.130.00
(31.)19979810.0010.0010.004.000.00
(32.)20050610.0010.0010.0011.051.05
(33.)20121315.0015.0015.0013.520.00
(34.)20141515.0015.0015.0013.660.00
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0092 dated 28.05.2018
(ii)Name of the EIA Consultant CMPDIL
(iii)Address CMPDIL, Gondwana Place, Kanke Road, Ranchi, Jharkhand- 834031
(iv)Mobile No. 9425176928
(v)Landline No. 0780527781
(vi)Email Id rdri6.cmpdi@coalindia.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 01 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Please inform status of ToR and public hearing for the proposed expansion project. - In case of CPA/SPA, Hon'ble NGT, vide order dated 10/7/2019 in OA No.1038/2018, has directed for no further industrial activities or expansion to be allowed with regard to red and orange category units. 11 Aug 2019
2.NAThe correction have been made as per the instruction received 28 Aug 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAdditional details were sought on 14.10.2019, against the proposal no. IA/ MP/ CMIN/ 109926/ 2019 dated 13.07.2019, for further consideration of the proposal. Point wise reply of queries of ADS, along with all required documents, is hereby submitted in the attached pdf. 03 Nov 2019
2.NA

The EAC, therefore, after deliberations, desired the following details for further consideration of the proposal.