1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Nigahi Opencast Project of M/s Northern Coalfields Limited | (b)Name of the Company / Organisation | NIGAHI PROJECT NORTHERN COALFIELDS LIMITED | (c)Registered Address | Office of the General Manager, Nigahi Project,PO- Nigahi, Distt-Singrauli,Singrouli,Madhya Pradesh-486884 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | JAI PRAKASH DWIVEDI | (b)Designation (Owner/ Partner/ CEO) | General Manager | (c)Address | Office of the General Manager, Nigahi Project,PO- Nigahi, Distt.- Singrauli,,Singrouli,Madhya Pradesh-486884 | (d)Pin code | 486884 | (e)E-mail | nigahi.environment@gmail.com | (f)STD Code. | 7805(f)Telephone No. | 276306 | (g)Fax No. | 07805276306 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/CMIN/109926/2019 | (d)Master Proposal Number(Single Window) | SW/109923/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Project Office :109,110,111,112,113 (part) | (b)Pincode | 486884 | (c)Bounded Latitudes (North) | | From | | Degree | 24.1009 | Minutes | | Second | | From | | Degree | 24.1879 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.5912 | Minutes | | Second | | From | | Degree | 82.6639 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G44W12 (63L/12) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 500 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.7 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 3-17/ 2015/(ENV)/681 dated 18.06.2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 14 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Capacity (Coal) | 18750000 | 2250000 | 21000000 | Tons per Annum(TPA) | | Others | MGR | (2.) | Area | 3018.40 | 0 | 3018.4 | Hectares(ha) | | Others | MGR | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Opencast mining of Coal | Shovel-dumper system and dragline | Shovel-dumper system and dragline | Shovel-dumper system and dragline | Deployment of 1 number of Surface Miner (3800- 4000 mm) in expansion | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Sep 2016 | (iv)Valid Upto | 31 Jan 2020 | (v)File No. | AW46103 | (vi)Application No. | 220011 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2197.31 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 31.0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11.00 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 4.28 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 24636 | Others | KL/ Annum | IOCL | Road | | 2.0 | LOA | | Copy of Linkage | (2.) | Explosives | 56083 | Tons per Annum | | Blastec, IOCL, Solar, IEPL | Road | | 3.0 | LOA | | Copy of Linkage | (3.) | Power | 15 | Others | MVA | MPPKVVCL | Others | NA | 10 | MoU | | Copy of Linkage | (4.) | Water | 14234 | Kilo Litre per Day | | IWSS | Others | Pipeline | 12 | Captive | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.25 To 24.75 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.82 To 24.62 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | NA | (f)Date of Issue | 01 Mar 2006 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 14234 | 12 | Copy of Permission Letter | Pipeline | | Intake Well | | 649-Cu-II/ NTPC/ 79 | 13 Mar 1979 | 146794.53 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Workshops | 1320 | 4000 | Sedimentation added with coagulation | Reuse within the Plant & Recycling | | 1320 | | (2.) | Coal Handling Plant | 4600 | 10500 | Sedimentation added with coagulation | Reuse within the Plant & Recycling | | 4600 | | (3.) | Township | 1700 | 3000 | Activated Sludge Process | Green Belt Renewal Plant | | 1700 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 7620 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 7620 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 142.350 | Tons | 1 | Road | | Sanitary Landfills | | (2.) | Overburden of Mine | Industrial Waste | | 183876000 | Tons | 2.47 | Others | Internal Roads | Others | Internal or External Dumping | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 50.00 | 6.84 | 0.84 | 50.85 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 21.00 | 1.05 | 0.00 | 21.01 | 80 | (3.) | NOx | | Microgram per Meter Cube | 28.50 | 1.05 | 0.00 | 28.51 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 94 | 6.84 | 4.53 | 98.54 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | na | na | 0 | 0 | Others | No stack | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 15000 | (b)Source | MPEB | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 4 numbers of DG sets | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 1280.517 | (b)Private Land (ha.) | 1528.883 | (c)Government Land (ha.) | 209.00 | (d)Revenue Land (ha.) | 0.00 | (e)Other Land (ha.) | 0.00 | Total Land (ha.) | 3018.40 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1528.883 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 1280.517 | (h)Mangroves (ha.) | 0.00 | (i)Marine Area (ha.) | 0.00 | (j)Others (ha.) : government land | 209 | Total (ha.) | 3018.4 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Township | | 265.00 | | (2.) | Green belt | | 335 | | (3.) | Quarry Area | | 1665 | | (4.) | OB Dump Area | | 418.00 | | (5.) | Safety Zone | | 147 | including vacant or waste land etc | (6.) | Others | Other Infrastructure | 188.40 | Workshops ETP CHP Roads and Railways | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | No WLS within 10 Kilometers | (2.) | ESAs | Nil | 0 | No ESA within 10 Kilometers | (3.) | NPA | Nil | 0 | No NPA within 10 Kilometers | (4.) | ESZs | Nil | 0 | No ESZ within 10 Kilometers | (5.) | Corridors | Nil | 0 | No Corridors within 10 Kilometers | (6.) | Wildlife Corridors | Nil | 0 | No Wildlife Corridors within 10 Kilometers | (7.) | Critically Polluted Area | Nil | 0 | Project is situated in Singrauli (MP), which is Severely Polluted Area | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | No Archaeological Site within 10 Kilometers | (2.) | Defence Installations | | Nil | 0 | No Defence Installation within 10 Kilometers | (3.) | Forest | | 1280.517 Ha Forest Land | 0 | Forest Clearance has already obtained for this forest land | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 3018.4 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 15 | (b)No. of Households | 32037 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 1309 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 1437.87 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | GBP Sagar Dam | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 1120 | (e)No. of working days | 365 | (f)Total Manpower | 1120 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 1523000 | 200000 | 1723000 | (2.) | Total Area of Green Belt | 335 | 80 | 415 | (3.) | Percentage of Total Project Area | 11.10 | 2.65 | 13.75 | (4.) | Funds Allocated | 26928000 | 51340000 | 78268000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Post-mining Enhancement of Green Cover | (2.) | Financial | Financial benefits of the adjoining areas:
- Increase in Employment Potential
- Contribution to the Exchequer | (3.) | Social | social benefits of the adjoining areas:
- Improvements in Physical Infrastructure
- Improvements in Social Infrastructure
- Meet energy requirement | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 18.75 MTPA | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | OFFICE/29/2837/2019-PnP, NCL HQ-NORTHERN COALFIELD | (b)Date of Approval | 23 Apr 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | NCL Board | (e)Approved Mining Lease Area | 3018.4 | (f)Approved Capacity | 21.00 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 561.71 | (b)Mineable Reserves (Million Ton) | 483.01 | (c)Extractable Reserves(Million Ton) | 483.01 | (d)Percent(%) of Extraction | 85.99 | (e)Grade of Coal /Ore /Mineral | G-10 | (f)Stripping Ratio | Average Stripping Ration as on 01.04.2019 : 3.94 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA since it is a Opencast Project | (h)Average Gradient(Degree) | 2-3 degree | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 12 from 01.04.2019 (As per mining plan 21.00 MTPA) | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 3 | (c)Thickness of seams to be worked on | 18 | (d)Maximum Thickness of Seams (metres) | Purewa Top : 10.94, Purewa Bottom : 14.70, Turra : 19.20, Purewa Merged (Purewa Top and Bottom merged): 27.50 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 3018.40 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Not Applicable since Nigahi is mine under CPSU und | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | All rights of 3018.40 has been acquired under Sub- | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | All rights of 3018.40 has been acquired under Sub- | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 2.1 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 2.1 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 60 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 1665 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumpers | (b)Surface to Siding/Loading | R/P (CHP) to SILO is done via Closed belt Conveyor | (c)Transportation / Conveyor Details | Total number of dumpers : 122 (of capacities 85T, | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | AGRICULTURE LAND | | 1528.883 | 0 | 1528.883 | (2.) | SETTLEMENTS | | 0 | 0 | 0 | (3.) | OTHERS(Specify) | Government Land | 209 | 0 | 209 | (4.) | FOREST LAND | | 1280.517 | 0 | 1280.517 | (5.) | GRAZING LAND | | 0 | 0 | 0 | (6.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (7.) | WASTE LAND | | 0 | 0 | 0 | |
TOTAL | 3018.4 | 0 | 3018.4 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 335 | 0 | 0 | | 335 | (2.) | EXTERNAL OB DUMPS | | 418 | 0 | 0 | | 418 | (3.) | VIRGIN AREA | | 147 | 0 | 0 | | 147 | (4.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 265 | | 265 | (5.) | Other | ETP, CHP, other infrastructure etc | 0 | 0 | 314.4 | | 314.4 | (6.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (7.) | INTERNAL OB DUMPS | | 1405 | 0 | 0 | | 1405 | (8.) | EXCAVATION/QUARRY | | 0 | 60 | 0 | | 60 | (9.) | ROADS | | 0 | 0 | 74 | | 74 | |
TOTAL | 2305 | 60 | 653.4 | 0 | 3018.4 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 418 | (b)Internal Dump(in hectare) | 1405 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 147 | (e)Final Void of 60 (hectare) at a Depth of 40 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 335 | (h)Total afforestation plant (in hectare) | 2305 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 198586 | 4.20 | 4.20 | 4.20 | 0.00 | 0.00 | (2.) | 198990 | 4.20 | 4.20 | 4.20 | 0.00 | 0.00 | (3.) | 199596 | 4.20 | 4.20 | 4.20 | 4.20 | 0.00 | (4.) | 200001 | 10.00 | 10.00 | 10.00 | 5.40 | 0.00 | (5.) | 200102 | 10.00 | 10.00 | 10.00 | 6.06 | 0.00 | (6.) | 200809 | 15.00 | 15.00 | 15.00 | 11.66 | 0.00 | (7.) | 201011 | 15.00 | 15.00 | 15.00 | 12.02 | 0.00 | (8.) | 201819 | 18.75 | 18.75 | 18.75 | 18.48 | 0.00 | (9.) | 198788 | 4.20 | 4.20 | 4.20 | 0.00 | 0.00 | (10.) | 199091 | 4.20 | 4.20 | 4.20 | 1.05 | 0.00 | (11.) | 198687 | 4.20 | 4.20 | 4.20 | 0.00 | 0.00 | (12.) | 199192 | 4.20 | 4.20 | 4.20 | 1.90 | 0.00 | (13.) | 198889 | 4.20 | 4.20 | 4.20 | 0.00 | 0.00 | (14.) | 199293 | 4.20 | 4.20 | 4.20 | 2.21 | 0.00 | (15.) | 199394 | 4.20 | 4.20 | 4.20 | 2.87 | 0.00 | (16.) | 199495 | 4.20 | 4.20 | 4.20 | 3.60 | 0.00 | (17.) | 199697 | 10.00 | 10.00 | 10.00 | 4.20 | 0.00 | (18.) | 199899 | 10.00 | 10.00 | 10.00 | 4.13 | 0.00 | (19.) | 199900 | 10.00 | 10.00 | 10.00 | 4.50 | 0.00 | (20.) | 200203 | 10.00 | 10.00 | 10.00 | 7.59 | 0.00 | (21.) | 200304 | 10.00 | 10.00 | 10.00 | 9.50 | 0.00 | (22.) | 200405 | 10.00 | 10.00 | 10.00 | 10.40 | 0.40 | (23.) | 200607 | 10.00 | 10.00 | 10.00 | 11.10 | 1.10 | (24.) | 200910 | 15.00 | 15.00 | 15.00 | 12.36 | 0.00 | (25.) | 200708 | 15.00 | 15.00 | 15.00 | 11.30 | 0.00 | (26.) | 201112 | 15.00 | 15.00 | 15.00 | 10.88 | 0.00 | (27.) | 201314 | 15.00 | 15.00 | 15.00 | 13.65 | 0.00 | (28.) | 201516 | 18.75 | 18.75 | 18.75 | 15.01 | 0.00 | (29.) | 201617 | 18.75 | 18.75 | 18.75 | 15.52 | 0.00 | (30.) | 201718 | 18.75 | 18.75 | 18.75 | 17.13 | 0.00 | (31.) | 199798 | 10.00 | 10.00 | 10.00 | 4.00 | 0.00 | (32.) | 200506 | 10.00 | 10.00 | 10.00 | 11.05 | 1.05 | (33.) | 201213 | 15.00 | 15.00 | 15.00 | 13.52 | 0.00 | (34.) | 201415 | 15.00 | 15.00 | 15.00 | 13.66 | 0.00 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA0092 dated 28.05.2018 | (ii)Name of the EIA Consultant | CMPDIL | (iii)Address | CMPDIL, Gondwana Place, Kanke Road, Ranchi, Jharkhand- 834031 | (iv)Mobile No. | 9425176928 | (v)Landline No. | 0780527781 | (vi)Email Id | rdri6.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Please inform status of ToR and public hearing for the proposed expansion project.
- In case of CPA/SPA, Hon'ble NGT, vide order dated 10/7/2019 in OA No.1038/2018, has directed for no further industrial activities or expansion to be allowed with regard to red and orange category units. | 11 Aug 2019 | 2. | NA | The correction have been made as per the instruction received | 28 Aug 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Additional details were sought on 14.10.2019, against the proposal no. IA/ MP/ CMIN/ 109926/ 2019 dated 13.07.2019, for further consideration of the proposal. Point wise reply of queries of ADS, along with all required documents, is hereby submitted in the attached pdf. | 03 Nov 2019 | 2. | NA | The EAC, therefore, after deliberations,
desired the following details for further consideration of the proposal. ยท