Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Silvano Industries LLP
(b)Name of the Company / Organisation SILVANO INDUSTRIES LLP
(c)Registered Address Survey No.: 403 paiki 2, 403 paiki 3 paiki, Village: Nava Sadulka, Haripar- Kerala Road, Taluka & District: Morbi,,Morbi,Gujarat-363642
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bharatbhai Vaghajibhai Panchotia
(b)Designation (Owner/ Partner/ CEO) partner
(c)Address Survey No. 403 paiki 2, 403 paiki 3 paiki, village Nava Sadulka, Taluka Morbi, District Morbi,,Morbi,Morbi,Gujarat-363642
(d)Pin code 363642
(e)E-mail silvanoindustriesllp2018@gmail.com
(f)STD Code. 79(f)Telephone No. 27450694
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/89821/2018
(d)Master Proposal Number(Single Window) SW/109646/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No.: 403 paiki 2, 403 paiki 3 paiki,
(b)Pincode 363642
(c)Bounded Latitudes (North)
From
Degree 70.8336
Minutes
Second
From
Degree 70.83384
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 22.92925
Minutes
Second
From
Degree 22.92965
Minutes
Second
(e)Survey of India Topo Sheet No. F42E16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 79
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4.79
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)GujaratMorbiMorbi
(2.)AssamTinsukiaDoom DoomaDoom Dooma
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/420/2018-IA-II(I)
(b)Date of Apply of TOR 27 Dec 2018
(c)Date of Issue of TOR / Standard ToR 04 Feb 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :0
Survey No.: 403 paiki 2, 403 paiki 3 paiki, Village: Nava Sadulka, Haripar – Kerala Road, Taluka: Morbi, District: Morbi, Gujarat -363642
State :Gujarat
District :Morbi
Tehsil :Morbi
Village :Nava Sadulka
97Most of welcoming the proposed project.OthersAdditional District Magistrate & Additional District Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Electric PanelFor Electric Panel
(2.)Boiler RoomTo place Boiler
(3.)Storage AreaLiquid raw material Storage Area
(4.)Packing and storage AreaFor Packaging and Product Storage Area
(5.)Office AreaFor Office Work
(6.)S.H.WFor Solid/ Hazardous Waste Storage
(7.)Water Storage/ OH Tank /RO PlantFor Water Storage
(8.)Cooling TowerCooling Tower
(9.)Main PlantManufacturing Area
(10.)Storage AreaSolid raw material Storage Area
(11.)Labor QuartersLabor Quarters
(12.)E.T.P.For Effluent Treatment
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ceramic Binders1500OthersMT/MonthRoad,Rail
(2.)Wood type Adhesives1875OthersMT/MonthRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2.8
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.25
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.056
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.065
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1365.22
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1365.22
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Acrylic acid72OthersMT/Monthlocal traders/suppliersRoad,Rail10 Open MarketCopy of Linkage
(2.)Caustic Flakes48OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(3.)Sodium bisulphite1.2OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(4.)Vinyl acetate monomer862.5OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(5.)Sodium Bicarbonate1.8OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(6.)Octanol9.1OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(7.)Di Butyl Pthalate24.5OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(8.)Formalin3.7OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(9.)Acrylamide Solution188OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(10.)Potassium per sulphate2.6OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(11.)N,N' Methylenebisacrylamide0.5OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(12.)Sodium Hypophosphite1.2OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(13.)Polyazo Azim0.12OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(14.)Poly Vinyl Alcohol150OthersMT/Monthlocal draders/suppliersRoad10 Open MarketCopy of Linkage
(15.)HSD Fuel3.53OthersMT/Daylocal draders/suppliersRoad,Rail10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 13 Oct 2018 To 03 Jan 2019
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube80.2342.1079.9100
(2.)NOxMicro Gram per Meter Cube29.588.3729.4080
(3.)SO2Micro Gram per Meter Cube18.676.2118.4980
(4.)PM2.5Micro Gram per Meter Cube52.9926.0052.7660
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)OthersECOthersmicro sm/ cm140653590000
(2.)TDSmg/l956424420002000
(3.)OthersTSmg/l96842560000
(4.)TSSmg/l48204120000
(5.)OthersSulphatemg/l398.14.5400400
(6.)OthersBicarbonatemg/l9006600600
(7.)Othersoronmg/l1111
(8.)OthersNitratemg/l7.62.14545
(9.)OthersCoppormg/l0.020.021.51.5
(10.)OthersCODmg/l40780000
(11.)OthersFecal ColiformOthersMPN/100ml220000
(12.)OthersIronmg/l0.20.20.30.3
(13.)OthersSodiummg/l199180000
(14.)OthersBODmg/l1222..30000
(15.)pHNA8.266.786.58.5
(16.)OthersECOthersmicro sm/ cm140653590000
(17.)OthersDOmg/l5.94.40000
(18.)Chloridesmg/l2595.555.810001000
(19.)OthersMg Hardnessmg/l240500000
(20.)OthersMagnesiummg/l678.718.3100100
(21.)OthersAlkalinitymg/l9006600600
(22.)Fluoridemg/l2.980.21.51.5
(23.)OthersPotassiummg/l8750000
(24.)OthersTotal ColiformOthersMPN/ 100 ml220000
(25.)OthersResidual Chloridemg/l15.92.211
(26.)OthersCa Hardnessmg/l1287200000
(27.)OthersColourOthersHazen551515
(28.)OthersCalciummg/l300.67.9200200
(29.)OthersOdourNA00000000
(30.)OthersNitritemg/l1.110000
(31.)OthersTurbidityOthersNTU6.71.855
(32.)Total Hardnessmg/l4080100600600
(33.)OthersPhospharousmg/l1.34111
(34.)OthersTempratureOthersDegree Celcius25.924.30000
(35.)OthersCarbonatemg/l5555
(36.)OthersPhosphatemg/l4.0210000
(37.)OthersPhenolmg/l0.0210.010.0020.002
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l4.82.9E
(2.)BODmg/l101.712E
(3.)CODmg/l33940E
(4.)pHNA8.667.89C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))47.940.845
(2.)Leq(Day)A-weighted decibels(dB(A))64.853.855
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.717.91
(2.)N(Nitrogen)Percent17.210.58
(3.)K(Potassium)Milligram per Kilogram4.990.98
(4.)Electric ConductivityMillisiemens per Centimetre10872.62
(5.)P(Phosphorus)Milligram per Kilogram7.741.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.65 To 2.36
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.38 To 3.51
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater154.350.1Copy of Permission LetterPipelineTube Well21-4/4860/GJ/IND/201909 Mar 2019154.35
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic3.53.5Septic tank followed by Soak pit systemOthersSoak pit3.50.0
(2.)Industrialq9.09.0ETP + Evaporator + CondenerReuse within the Plant & Recycling9.0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 12.5
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 12.5
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)ETp Slude + Evaporation residueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)60Tons51.165RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Discarded Bags and DrumsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.8Tons10RoadAuthorized Recyclers
(3.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Tons0.0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube80.230.00.0002580.24100
(2.)SO2Microgram per Meter Cube18.678.660.0818.880
(3.)NOxMicrogram per Meter Cube29.58000.000229.680
(4.)PM2.5Microgram per Meter Cube80.230.00.0002580.24100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Steam boilerHSD111SO20.2042 g/s
(2.)Steam boilerHSD111NOx0.0028 g/s
(3.)Steam boilerHSD111PM100.00204 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100
(b)Source PGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 125 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0.0
(b)Private Land (ha.) 1.7806
(c)Government Land (ha.) 0.0
(d)Revenue Land (ha.) 0.0
(e)Other Land (ha.) 0.0
    Total Land (ha.) 1.7806
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 29512
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1262
(e)Settlements (ha.) 451
(f)Industrial (ha.) 88
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Transportation 104
    Total (ha.) 31417
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.5875
(2.)Built Up Area0.5954
(3.)OthersOpen area0.5977
Total (ha.) 1.7806
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)WLSNA00NA
(3.)ESZsNA00NA
(4.)CorridorsNA00NA
(5.)Wildlife CorridorsNA00NA
(6.)NPANA00NA
(7.)ESAsNA00NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00NA
(2.)ForestNA00NA
(3.)Defence InstallationsNA00NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1.7806
(b)Land yet to be acquired(Ha) 0.0
(c)Status of Land acquisition if not acquired 0.0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species peacock
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 1 lac
(iii)Period of Implementation 5 year
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area macchu river
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 4.7
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 10
(c)Temporary Employment- During Construction 20
(d)Temporary Employment- During Operation 0
(e)No. of working days 25
(f)Total Manpower 30
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.5875
(b)Percentage of Total Project Area 32.99
(c)No. of Plants to be Planted 450
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialIncrease employment in surrounding villages due o proposed project.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA0033
(ii)Name of the EIA Consultant T R Associates
(iii)Address A-401, S. G. Business Hub,, Between Sola Bhagwat and Gota Overbridge,
(iv)Mobile No. 9825371099
(v)Landline No. 0792745069
(vi)Email Id adm.trassociates@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 17 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - In view of NABET accreditation valid till 17/3/2019, present status of assessment process for the EIA consultant. - No public hearing proceedings details available against column 7.1 of Form-2 for EC. - Permission from the concerned regulatory authority for ground water withdrawal of 154.35 cum/day. 03 Aug 2019
2.NAThe correction have been made as per the instruction received 05 Aug 2019
3.NAPlease provide present status of our earlier observations dated 3/8/2019. Public hearing details are yet to be uploaded against column 7.1 of Form-2. 05 Sep 2019
4.NAThe correction have been made as per the instruction received 06 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBharatbhai Vaghajibhai Panchotia
Designationpartner
Name of Company (Applicant Name should not be given here)SILVANO INDUSTRIES LLP
AddressSurvey No.: 403 paiki 2, 403 paiki 3 paiki, Village: Nava Sadulka, Haripar- Kerala Road, Taluka & District: Morbi
Print