1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mining of heavy mineral sand in Alappad , Panmana and Ayaneivelikulangara villages in Kollam District for an area of 180 Ha in NK Block IV EE of IREL(INDIA) Limited, Chavara
(b)Name of the Company / Organisation INDIAN RARE EARTHS LIMITED
(c)Registered Address CHAVARA KOLLAM,,Kollam,Kerala-691583
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant S SURYAKUMAR
(b)Designation (Owner/ Partner/ CEO) CGM
(c)Address IREL (INDIA) LIMITED CHAVARA KOLLAM,,,Kollam,Kerala-691583
(d)Pin code 691583
(e)E-mail cgm-ch@irel.co.in
(f)STD Code. 476(f)Telephone No. 2680701
(g)Fax No. 04762680141
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
Minor Activity1(a) Mining of minerals
(b)Category A
(c)Proposal Number IA/KL/MIN/109526/2008
(d)Master Proposal Number(Single Window) SW/109520/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 253 to 259,267,268,269,278,279,290,291,292,293,294
(b)Pincode 690547
(c)Bounded Latitudes (North)
From
Degree 9.015547
Minutes
Second
From
Degree 9.034388
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.50831
Minutes
Second
From
Degree 76.52144
Minutes
Second
(e)Survey of India Topo Sheet No. 58C/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Kerala
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)AssamTinsukiaDoom DoomaDoom Dooma
(2.)HaryanaPanchkulaPanchkulaRattewali
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/227/2015-IA.II(M)
(c)Date of Issue of TOR 29 Sep 2008
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 29 Jun 2019
(c)Date of Issue of EC 30 Jul 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :12 May 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :22 May 2018
Distance of Public Hearing Venue from the Proposed Project :9
FKM Auditorium, Karunagapally,
State :Kerala
District :Kollam
Tehsil :Karunagappally
Village :Panmana
365There is no mention about environment impact in the public hearing. The environment impact study should be clarified. Salt intrusion in Vellanathuruthu as a result of mining has adverseOthersADM
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. EP/12.1/2010-11/26/Kerala
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 23 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)ROM237150750000987150Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)1111
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception Copy of Consent to Operate
(iii)Date of Issue 13 Feb 2019
(iv)Valid Upto 31 Oct 2021
(v)File No. PCB/HO/KLM/ICO/15/08(2)
(vi)Application No. 5559670
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 10
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.46
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.1
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.13
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 750000
(b)Existing quantity of raw material/fuel 237150
(c)Total quantity of raw material/fuel 987150
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)RoM750000Tons per AnnumNARoad2 OthersCONTRACTCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Feb 2017 To 31 May 2017
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube663663100
(2.)NOxMicro Gram per Meter Cube103380
(3.)PM2.5Micro Gram per Meter Cube20101060
(4.)SO2Micro Gram per Meter Cube103380
    14.2.     No. of Ground Water monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l10.7.3100500
(2.)pHNA7.866.556.58.5
(3.)TDSmg/l115330500200
(4.)Fluoridemg/l.5.21.01.5
(5.)Total Hardnessmg/l702140200600
(6.)Chloridesmg/l7057.415.92501000
(7.)Otherstotal ALKALINITYmg/l35612200600
(8.)Heavy MetalsLEADmg/l0.30.010.050.05
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.687.68E
(2.)CODmg/l700500E
(3.)pHmg/l7.387.38E
(4.)BODmg/l500400E
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))745475
(2.)Leq(Night)A-weighted decibels(dB(A))655070
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.55.9
(2.)P(Phosphorus)Percent0.710.32
(3.)N(Nitrogen)Percent0.70.09
(4.)Electric ConductivityMillisiemens per Centimetre64
(5.)K(Potassium)Percent0.710.32
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.2 To 1.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.4 To 1.7
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersArtificial pond, water will be recirculated1776.1Copy of Permission LetterPipelineOthersPUMPSNA16 Nov 20180
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)NA00NAOthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OthersOthersNA0Tons0OthersNAOthersNA
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube70.121080
(2.)NOxMicrogram per Meter Cube70.121080
(3.)PM10Microgram per Meter Cube530.11064100
(4.)PM2.5Microgram per Meter Cube330.1104460
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NA000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 450
(b)Source KSEBL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NIL
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 113.79
(c)Government Land (ha.) 48
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 18.21
    Total Land (ha.) 180
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 47.975
(e)Settlements (ha.) 122.295
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 2.73
(i)Marine Area (ha.) 0
(j)Others (ha.) : Plant & area under sea 7
    Total (ha.) 180
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area118.025
(2.)Built Up Area2
(3.)Water Reservoir47.975Canal
(4.)OthersMined, refilled and area under sea12
Total (ha.) 180
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsnil0nil
(2.)ESZsnil0nil
(3.)Corridorsnil0nil
(4.)WLSnil0nil
(5.)Critically Polluted AreaNil0Nil
(6.)NPAnil0nil
(7.)Wildlife Corridorsnil0nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological Sitesnil0nil
(2.)Defence Installationsnil0nil
(3.)Forestnil0nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 1200
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 18.21
(b)Land yet to be acquired(Ha) 113.79
(c)Status of Land acquisition if not acquired in progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 3
(b)No. of Households 753
(c)No. of PDFs (Project Displaced Families) 753
(d)No. of PAFs (Project Affected Families) 753
(e)Funds Allocated for R&R(in INR) (in Lacs) 48906
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area TS Canal & Vattakayal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Arabian Sea
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 9
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 241
(e)No. of working days 300
(f)Total Manpower 250
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt05.825.82
(2.)Percentage of Total Project Area03.233.23
(3.)No. of Plants050005000
(4.)Funds Allocated050000005000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThe Monazite and Zircon minerals produced by IREL are used for strategic applications by Department of Atomic Energy in the Nuclear Energy Programmes.
(2.)EnvironmentalMonazite radio active mineral will be mined out.
(3.)SocialCreate temporary job opportunities to local people.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 5
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)IlmeniteMajor
(2.)RutileMajor
(3.)SillimaniteMajor
(4.)ZirconMajor
(5.)MonaziteMajor
(6.)LeucoxeneMajor
2.
Mine Capacity in ROM (Run of Mine) 750000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. AMD/MRG/IREL-Chavara/MMP/180
(b)Date of Approval 15 Nov 2018
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department Atomic
(e)Approved Mining Lease Area 180
(f)Approved Capacity 750000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 6.025
(b)Mineable Reserves (Million Ton) 6.025
(c)Extractable Reserves(Million Ton) 4.82
(d)Percent(%) of Extraction 80
(e)Grade of Coal /Ore /Mineral 17.62
(f)Stripping Ratio 0 : 8
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) 0
(i)Mining Method Opencast
(j)Life of Mine (Years) 7
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 180
(b)Whether obtained Letter of Intent (LOI) from the state government ? Yes
(i)Copy of Letter of Intent Copy of Letter of Intent
(ii)Date of issue of LOI 08 Jun 2007
(iii)Validity of LOI 20
(iv)Reference No. of LOI G.O.(Rt) .No. 746/07/ID
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 180
(iii)Validity of the lease deed From : 10 Aug 2011 To : 09 Aug 2031
(iv)Date of Execution of Mining Lese 07 Jun 2011
(v)Reference Number G.O.(Rt) .No. 746/07/ID
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Validity continues
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 0
(b)Depth (in meter) 0
(c)Volume (in Million Cubic meter) 0
12.
Details of Quarry:
(a)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 0
13.
Details of Transportation:
(a)In Pit/Underground to Surface Pumping
(b)Surface to Siding/Loading nil
(c)Transportation / Conveyor Details Through tippers
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)FOREST LAND000
(2.)GRAZING LAND000
(3.)SETTLEMENTS122.2956395.866518.155
(4.)OTHERS(Specify)Plant area and area under sea and mangrooves9.7310837.99510847.725
(5.)WASTE LAND000
(6.)AGRICULTURE LAND000
(7.)SURFACE WATER BODIES47.975648.395696.37
TOTAL18017882.2518062.25
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXTERNAL OB DUMPS0000
(2.)ROADS001818
(3.)GREEN BELT5.82005.82
(4.)Otherwaterbody including area under sea052.975052.975
(5.)VIRGIN AREA0000
(6.)TOP SOIL STORAGE0000
(7.)INTERNAL OB DUMPS0000
(8.)EXCAVATION/QUARRY98.4750098.475
(9.)BUILT UP AREA (COLONY/OFFICE)0000
TOTAL104.29552.975180175.27
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 122.295
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 80
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 104.295
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan no
Total Area Excavated (in hectare) 7
Total Area Backfilled after Excavation (in hectare) 4.2
Total Area Reclaimed (in hectare) 0.25
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)20111223715023715023715000
(2.)201718237150237150237150231703.920
(3.)20121323715023715023715000
(4.)20141523715023715023715000
(5.)20151623715023715023715000
(6.)201617237150237150237150237148.850
(7.)20131423715023715023715000
(8.)201819237150750000750000229245.150
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/RA075/243
(ii)Name of the EIA Consultant CSIR-NIIST
(iii)Address CSIR – National Institute for Interdisciplinary Science and Technology (NIIST) Council of Scientific & Industrial Research (CSIR), Ministry of Science and Technology, Govt of India . Industrial Estate
(iv)Mobile No. 9447206472
(v)Landline No. 0471251537
(vi)Email Id ansari@niist.res.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 30 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterAs per MoEF letter F. no. J-11015/227/2015-IA-II-M dated 14.10.2019 the details are uploaded 02 Mar 2020
2. ADS Reply LetterAs per MoEF letter F. no. J-11015/227/2015-IA-II-M dated 14.10.2019 the details are uploaded 02 Mar 2020
3.NA

deferred

21 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantS SURYAKUMAR
DesignationCGM
Name of Company (Applicant Name should not be given here)INDIAN RARE EARTHS LIMITED
AddressCHAVARA KOLLAM
Print