Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Acrylics/ Oxo Alcohol Project, Creation of necessary facility for origination of Koyali – Ahmednagar – Sholapur pipeline (KAHSPL) & installation of Tank Truck Loading facility (TTL) for linea
(b)Name of the Company / Organisation Indian Oil Corporation Limited (IOCL)
(c)Registered Address Gujarat Refinery, PO Jawaharnagar,,Vadodara,Vadodara,Gujarat-391320
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Soumitra Ray Choudhuri
(b)Designation (Owner/ Partner/ CEO) Deputy General Manager
(c)Address DGM(HSE), Room no 206, I floor, Technical Building, Gujarat Refinery,PO Jawaharnagar, Vadodara,,Vadodara,Gujarat-391320
(d)Pin code 391320
(e)E-mail makwanabb@indianoil.in
(f)STD Code. 265(f)Telephone No. 2237371
(g)Fax No. 02652233300
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
5(c) Petro-chemical complexes (industries based on processing of
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/109376/2017
(d)Master Proposal Number(Single Window) SW/109362/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 771 to 795
(b)Pincode 391320
(c)Bounded Latitudes (North)
From
Degree 22.389931
Minutes
Second
From
Degree 22.402710
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.199593
Minutes
Second
From
Degree 73.211250
Minutes
Second
(e)Survey of India Topo Sheet No. 46F/3, 46F/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 38
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number F.No.J-11011/370/2016-IA.II(I)
(c)Date of Issue of TOR 02 Jan 2018
(f)Previous TOR Letter NA
(b)Date of Apply of EC 14 Aug 2019
(c)Date of Issue of EC 05 Mar 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :30 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :1.35
Mandawat Farm
State :Gujarat
District :Vadodara
Tehsil :Savli
Village :Dumad
70Safety aspectDistrict Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhopal
(iii)Letter No. 5-8-2001(ENV)/776
(iv)Status of Compliance Partially Complied
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 31 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ms, Ethanol, SKO, HSD, DHPP-A and Biodiesel74194074194OthersKLRoad,OthersPipeline
(2.)HSD, MS, ATF, PCK, SKO, LMW and HMW0275000275000OthersKLRoad,OthersPipeline
(3.)Mounded bullets (6 Nos)8351.6408351.64OthersMTRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Boiler, (1Working +1 Standby)060 TPH60 TPH-
(2.)Nitrogen 900 NM3/Hr0240 KLPH240 KLPH-
(3.)DG Set (Stand by)01No x 1500 kVA1No x 1500 kVA-
(4.)Cooling water system010716 KLPH10716 KLPH-
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 03 Sep 2014
(iv)Valid Upto 02 Sep 2019
(v)File No. AWH-65930
(vi)Application No. AWH-65930
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 4554
(b) Funds Allocated for Environment Management (Capital) (in Crores) 85.185
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1551
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.79
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 9
(b)Existing quantity of raw material/fuel 7
(c)Total quantity of raw material/fuel 16
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)diesel300OthersLitre/hrRefineryRoad,Otherspipeline11 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Nov 2017 To 31 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube51.815.351.260
(2.)SO2Micro Gram per Meter Cube17.47.417.280
(3.)NOxMicro Gram per Meter Cube44.914.444.980
(4.)PM10Micro Gram per Meter Cube92.448.292.3100
    14.2.     No. of Ground Water monitoring locations : 08
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l19336255002000
(2.)Total Hardnessmg/l2908.6184.8200600
(3.)Chloridesmg/l6121052501000
(4.)Fluoridemg/l1.140.5111.5
(5.)pHNA8.146.916.58.5
(6.)TSSmg/l11100100
(7.)Heavy MetalsZincmg/l1.0100.012515
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.626.58A
(2.)DOmg/l6.95.3B
(3.)BODmg/l2.81B
(4.)CODmg/l244D
    14.4.     No. of Ambient Noise monitoring locations : 08
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))65.256.175
(2.)Leq(Night)A-weighted decibels(dB(A))52.844.170
    14.5.     No. of Soil Sample Monitored locations : 08
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare14242
(2.)P(Phosphorus)Kilogram per hectare63.315.7
(3.)K(Potassium)Kilogram per hectare19762
(4.)Electric ConductivityOthersµS/cm245104
(5.)pH8.227.25
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 50
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 25 To 50
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface1363225Copy of Permission LetterPipelineOpen WellWater letter10 Jan 2019163660
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage and Effluent30004560Combined ETPReuse within the Plant & Recycling,OthersRo and MEE Permeate2880120
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3000
(b)Total Discharged Water (Kilolitre per Day) 120
(c)Total Reused Water (Kilolitre per Day) 2880
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)OrganicMunicipal Solid Waste1.96Tons1.5RoadOthersComposting
(2.)InorganicMunicipal Solid Waste2.93Tons12RoadAuthorized Recyclers
(3.)Tank bottom SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)43.5Tons12RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube92.411.494100
(2.)PM2.5Microgram per Meter Cube51.811.4453.360
(3.)SO2Microgram per Meter Cube41.514.1945.780
(4.)NOxMicrogram per Meter Cube44.917.6552.680
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)CCU Stack-602.03PM1030
(2.)HP Flare stack-600.8PM1030
(3.)DG set 1500 kVAHSD120.3PM1030
(4.)250 kVAHSD3.160.15PM1070
(5.)Boiler 1 x 60 TPHLNG302.38PM100.59
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 27000
(b)Source GETCO
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 x 1500
(e)Stack Height (in m) 12
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 175.634
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 175.634
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22885
(b)Waste/Barren Land (ha.) 3203
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 1252.5
(e)Settlements (ha.) 7132
(f)Industrial (ha.) 2553.5
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Nil 0
    Total (ha.) 37026
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant175.634
Total (ha.) 175.634
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNil0Nil
(2.)WLSNil0Nil
(3.)NPANil0Nil
(4.)CorridorsNil0Nil
(5.)Wildlife CorridorsNil0Nil
(6.)ESZsNil0Nil
(7.)ESAsNil0Nil
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNil0Nil
(2.)Archaeological SitesNil0Nil
(3.)Defence InstallationsNil0Nil
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 00
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Vishwamitri River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.1
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 847
(c)Temporary Employment- During Construction 1700
(d)Temporary Employment- During Operation 0
(e)No. of working days 365
(f)Total Manpower 2547
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt13.354644.920158.274699999999996
(2.)Percentage of Total Project Area7.625.57633.176
(3.)No. of Plants130006825081250
(4.)Funds Allocated1800000900000010800000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialCheaper the fuel cost
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0083
(ii)Name of the EIA Consultant Hubert Enviro care Systems Pvt Ltd
(iii)Address Hubert Enviro Care Systems (P) Ltd. A-21, (Behind Lions Club School) III Phase, Thiru Vi Ka Industrial Estate. Guindy, Chennai - 600 032.
(iv)Mobile No. 9884390811
(v)Landline No. 0444363555
(vi)Email Id moses@hecs.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 13 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAIn view of the Ministry's Notification dated 13/6/2019, the proposal needs to be examined for applicability of the EIA Notification, 2006 and requirement of prior EC to different components proposed under the project, and restructured accordingly. 03 Aug 2019
2.NAThe correction have been made as per the instruction received 14 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSoumitra Ray Choudhuri
DesignationDeputy General Manager
Name of Company (Applicant Name should not be given here)Indian Oil Corporation Limited (IOCL)
AddressGujarat Refinery, PO Jawaharnagar,
Print