1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Installation of Ethanol Plant from PSA Off Gases ex HGU 76 & 77 using Gas Fermentation Technology | (b)Name of the Company / Organisation | INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX | (c)Registered Address | PO: PANIPAT REFINERY
DISTT: PANIPAT
PIN: 132140,PO: PANIPAT REFINERY
DISTT: PANIPAT
PIN: 132140,Panipat,Maharashtra-132140 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | PV Ramakrishna | (b)Designation (Owner/ Partner/ CEO) | GM HS&E | (c)Address | PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,,Panipat,Haryana-132140 | (d)Pin code | 132140 | (e)E-mail | prpc_hse@indianoil.in | (f)STD Code. | 180(f)Telephone No. | 2522011 | (g)Fax No. | 25788833 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 4(a) Petroleum refining industry
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/HR/IND2/73149/2018 | (d)Master Proposal Number(Single Window) | SW/109367/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | PR 42-128 Gram Panchayat Baholi, Refinery Road, Pa | (b)Pincode | 132140 | (c)Bounded Latitudes (North) | | From | | Degree | 29.2834 | Minutes | | Second | | From | | Degree | 29.2845 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 76.52197 | Minutes | | Second | | From | | Degree | 76.52236 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | H43Q15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 242 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Haryana | Panipat | Panipat | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | IA-J-11011/78/2018-IA-II(I) | (b)Date of Apply of TOR | 28 Feb 2018 | (c)Date of Issue of TOR / Standard ToR | 03 May 2018 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 27 Mar 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Adjacent to existing Panipat Refinery | State : | Haryana | District : | Panipat | Tehsil : | Panipat | Village : | Baholi |
| 95 | Infrastructure Development and Employment Generation | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Ethanol Production Plant | 128 KL Per Day | Process Flow Diagram is given in EIA report | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ethanol | 128 | Others | KL Per Day | Pipe Conveyor | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 598.2 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 5.982 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.05 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 517.72 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 517.72 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Off Gases containing Hydrogen and Carbon Mono Oxide | 517.72 | Others | Kilo Tons per annum | Captive | Pipe Conveyor | | 0.25 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 95.7 | 77 | 95.6 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 25.4 | 18 | 24.5 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 44 | 29 | 43 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 58.3 | 47.7 | 57.6 | 60 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 487 | 257 | 500 | 2000 | (2.) | pH | | | NA | | 8.67 | 7.40 | 0 | 0 | (3.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (4.) | Chlorides | | | mg/l | | 65 | 32 | 250 | 1000 | (5.) | Heavy Metals | | Copper | mg/l | | 0 | 0 | 0.05 | 1.5 | (6.) | Total Hardness | | | mg/l | | 391 | 189 | 200 | 600 | (7.) | Fluoride | | | mg/l | | 0.90 | 0.21 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 74 | 24 | B | (2.) | pH | | NA | | 7.89 | 7.41 | B | (3.) | BOD | | mg/l | | 21 | 9 | B | (4.) | DO | | mg/l | | 5.5 | 4.4 | B | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64 | 44.6 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45 | 27 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 9.58 | 7.9 | (2.) | P(Phosphorus) | Milligram per Litre | | 8.2 | 6.1 | (3.) | N(Nitrogen) | Kilogram per hectare | | 290.7 | 146.4 | (4.) | K(Potassium) | Kilogram per hectare | | 220.7 | 150.4 | (5.) | Electric Conductivity | Others | micro mohs per cm | 980 | 129.5 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.27 To 26.20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.96 To 28.40 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 3600 | 0.22 | Copy of Permission Letter | modeOthers | Thru Channel | Others | Thru Channel | Agreement no. 29990 | 14 Mar 2018 | 73397.3 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process Effluent | 209 | 6120 | Effluent Treatment Plant | Discharge into Surface Water Body | | | 209 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 209 | (b)Total Discharged Water (Kilolitre per Day) | 209 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Dry Biomass | Industrial Waste | | 907 | Tons | 50 | Road | | Others | Animal and Bird Feed | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 95.76 | 0 | 0 | 95.77 | 100 | (2.) | NOx | | Microgram per Meter Cube | 35.15 | 0 | 0 | 35.16 | 80 | (3.) | SO2 | | Microgram per Meter Cube | 25.4 | 0 | 0 | 25.41 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 58.3 | 0 | 0 | 58.31 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | No stack in the Proposed Project | NA | 0 | 0 | PM10 | | 0 | (2.) | No stack in the Proposed Project | NA | 0 | 0 | SO2 | | 0 | (3.) | No stack in the proposed project | NA | 0 | 0 | NOx | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 12 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | NA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 5.92 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 5.92 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1.95 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 3.97 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 5.92 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.1 | Process Plant and Utilities | (2.) | Green belt | | 1.95 | Greenbelt Development | (3.) | Others | Building,Parking,Roads | 0.87 | Roads,Parking,Building | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | Not Applicable | (2.) | ESAs | Not Applicable | 0 | Not Applicable | (3.) | Corridors | Not Applicable | 0 | Not Applicable | (4.) | ESZs | Not Applicable | 0 | Not Applicable | (5.) | Critically Polluted Area | Not Applicable | 0 | Not Applicable | (6.) | NPA | Not Applicable | 0 | Not Applicable | (7.) | Wildlife Corridors | Not Applicable | 0 | Not Applicable | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not Applicable | 0 | Not applicable | (2.) | Forest | | Not Applicable | 0 | Not applicable | (3.) | Archaeological Sites | | Not Applicable | 0 | Not applicable | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Project inside existing area | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Munak Regulator On Western Yamuna Canal | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 2900 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 5 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 300 | (f)Total Manpower | 2925 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1.95 | (b)Percentage of Total Project Area | 32.94 | (c)No. of Plants to be Planted | 500 | (d)Funds Allocated for Plantation | 1500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | As the proposed project is for the betterment of the Environment and is an effort towards reduction of CO2 Emission in the atmosphere and in turn will have positive impact on the Environment in the Delhi and NCR. | (2.) | Social | The project will provide an opportunity to India to reduce its
dependence on crude oil Imports. It will also reduce the impact of crude oil price volatility seen quite often in international markets. It will also help in reducing the subsidy burden of the Indian government since
ethanol (produced locally from agricultural residue) displaces petrol from imported crude. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | Yes | (b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Section 33-A of Water Act,1974 | (c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act | Copy of Direction Issued | (d)Compliance status of the directions | Complied | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET / EIA / 1619 / RA0048 | (ii)Name of the EIA Consultant | ABC Techno labs India Pvt Ltd | (iii)Address | Corporate office: ABC TOWER No. 400 , 13th Street, SIDCO Industrial Estate- North Phase , Ambattur, Chennai – 600 098, Tamil Nadu, India | (iv)Mobile No. | 9821572427 | (v)Landline No. | 0442625779 | (vi)Email Id | mumbai@abctechnolab.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 25 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | PV Ramakrishna | Designation | GM HS&E | Name of Company (Applicant Name should not be given here) | INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX | Address | PO: PANIPAT REFINERY
DISTT: PANIPAT
PIN: 132140 |
|