Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Installation of Ethanol Plant from PSA Off Gases ex HGU 76 & 77 using Gas Fermentation Technology
(b)Name of the Company / Organisation INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX
(c)Registered Address PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,Panipat,Maharashtra-132140
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant PV Ramakrishna
(b)Designation (Owner/ Partner/ CEO) GM HS&E
(c)Address PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,PO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140,,Panipat,Haryana-132140
(d)Pin code 132140
(e)E-mail prpc_hse@indianoil.in
(f)STD Code. 180(f)Telephone No. 2522011
(g)Fax No. 25788833
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity4(a) Petroleum refining industry
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/73149/2018
(d)Master Proposal Number(Single Window) SW/109367/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. PR 42-128 Gram Panchayat Baholi, Refinery Road, Pa
(b)Pincode 132140
(c)Bounded Latitudes (North)
From
Degree 29.2834
Minutes
Second
From
Degree 29.2845
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.52197
Minutes
Second
From
Degree 76.52236
Minutes
Second
(e)Survey of India Topo Sheet No. H43Q15
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 242
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaPanipatPanipat
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/78/2018-IA-II(I)
(b)Date of Apply of TOR 28 Feb 2018
(c)Date of Issue of TOR / Standard ToR 03 May 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :23 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :27 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :0.5
Adjacent to existing Panipat Refinery
State :Haryana
District :Panipat
Tehsil :Panipat
Village :Baholi
95Infrastructure Development and Employment GenerationDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Ethanol Production Plant128 KL Per DayProcess Flow Diagram is given in EIA report
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Ethanol128OthersKL Per DayPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 598.2
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.982
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.05
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 517.72
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 517.72
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Off Gases containing Hydrogen and Carbon Mono Oxide517.72OthersKilo Tons per annumCaptivePipe Conveyor0.25 CaptiveCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2016 To 28 Feb 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube95.77795.6100
(2.)SO2Micro Gram per Meter Cube25.41824.580
(3.)NOxMicro Gram per Meter Cube44294380
(4.)PM2.5Micro Gram per Meter Cube58.347.757.660
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l4872575002000
(2.)pHNA8.677.4000
(3.)TSSmg/l0000
(4.)Chloridesmg/l65322501000
(5.)Heavy MetalsCoppermg/l000.051.5
(6.)Total Hardnessmg/l391189200600
(7.)Fluoridemg/l0.900.211.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l7424B
(2.)pHNA7.897.41B
(3.)BODmg/l219B
(4.)DOmg/l5.54.4B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))6444.675
(2.)Leq(Night)A-weighted decibels(dB(A))452770
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.587.9
(2.)P(Phosphorus)Milligram per Litre8.26.1
(3.)N(Nitrogen)Kilogram per hectare290.7146.4
(4.)K(Potassium)Kilogram per hectare220.7150.4
(5.)Electric ConductivityOthersmicro mohs per cm980129.5
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.27 To 26.20
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.96 To 28.40
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface36000.22Copy of Permission LettermodeOthersThru ChannelOthersThru ChannelAgreement no. 2999014 Mar 201873397.3
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Process Effluent2096120Effluent Treatment PlantDischarge into Surface Water Body209
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 209
(b)Total Discharged Water (Kilolitre per Day) 209
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Dry BiomassIndustrial Waste907Tons50RoadOthersAnimal and Bird Feed
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube95.760095.77100
(2.)NOxMicrogram per Meter Cube35.150035.1680
(3.)SO2Microgram per Meter Cube25.40025.4180
(4.)PM2.5Microgram per Meter Cube58.30058.3160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)No stack in the Proposed ProjectNA00PM100
(2.)No stack in the Proposed ProjectNA00SO20
(3.)No stack in the proposed projectNA00NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 12
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 5.92
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 5.92
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1.95
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 3.97
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 5.92
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.1Process Plant and Utilities
(2.)Green belt1.95Greenbelt Development
(3.)OthersBuilding,Parking,Roads0.87Roads,Parking,Building
Total (ha.) 5.92
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0Not Applicable
(2.)ESAsNot Applicable0Not Applicable
(3.)CorridorsNot Applicable0Not Applicable
(4.)ESZsNot Applicable0Not Applicable
(5.)Critically Polluted AreaNot Applicable0Not Applicable
(6.)NPANot Applicable0Not Applicable
(7.)Wildlife CorridorsNot Applicable0Not Applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsNot Applicable0Not applicable
(2.)ForestNot Applicable0Not applicable
(3.)Archaeological SitesNot Applicable0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Project inside existing area
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Munak Regulator On Western Yamuna Canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 2900
(b)Permanent Employment-During Operation 15
(c)Temporary Employment- During Construction 5
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 2925
32.
Green Belt in Ha:
(a)Total Area of Green Belt 1.95
(b)Percentage of Total Project Area 32.94
(c)No. of Plants to be Planted 500
(d)Funds Allocated for Plantation 1500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalAs the proposed project is for the betterment of the Environment and is an effort towards reduction of CO2 Emission in the atmosphere and in turn will have positive impact on the Environment in the Delhi and NCR.
(2.)SocialThe project will provide an opportunity to India to reduce its dependence on crude oil Imports. It will also reduce the impact of crude oil price volatility seen quite often in international markets. It will also help in reducing the subsidy burden of the Indian government since ethanol (produced locally from agricultural residue) displaces petrol from imported crude.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? Yes
(b)Details of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Section 33-A of Water Act,1974
(c)Uploaded Copy of Direction Issued Under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act Copy of Direction Issued
(d)Compliance status of the directions Complied
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET / EIA / 1619 / RA0048
(ii)Name of the EIA Consultant ABC Techno labs India Pvt Ltd
(iii)Address Corporate office: ABC TOWER No. 400 , 13th Street, SIDCO Industrial Estate- North Phase , Ambattur, Chennai – 600 098, Tamil Nadu, India
(iv)Mobile No. 9821572427
(v)Landline No. 0442625779
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 May 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPV Ramakrishna
DesignationGM HS&E
Name of Company (Applicant Name should not be given here)INDIAN OIL CORPORATION LIMITED. PANIPAT REFINERY & PETROCHEMICAL COMPLEX
AddressPO: PANIPAT REFINERY DISTT: PANIPAT PIN: 132140
Print