Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Limestone Mine (ML Area: 582.962 ha) with Limestone Production Capacity of 3.9 Million TPA and waste/ topsoil 225000 CuM per annum (Maximum) with installation of Crusher of 1000 TPH Capacity
(b)Name of the Company / Organisation ACC LTD
(c)Registered Address ACC LTD JAMUL CEMENT WORKS JAMUL VILLAGE PO JAMUL CEMENT WORKS ,,Durg,Chhattisgarh-490024
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant VINAY SARAN KAPUR
(b)Designation (Owner/ Partner/ CEO) GM ENVIRONMENT
(c)Address ACC LIMITED JAMUL CEMENT WORKS JAMUL VILLAGE PO JAMUL CEMENT WORKS,,Durg,Durg,Chhattisgarh-490024
(d)Pin code 490024
(e)E-mail anilkumar.sahu.ext@adani.com
(f)STD Code. 788(f)Telephone No. 2286427
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(a) Mining of minerals
2(b) Mineral beneficiation
Minor Activity2(b) Mineral beneficiation
(b)Category A
(c)Proposal Number IA/CG/MIN/109258/2018
(d)Master Proposal Number(Single Window) SW/109256/2019
(e)EAC concerned (for category A Projects only) Non-Coal Mining
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khasra Map is enclosed
(b)Pincode 490024
(c)Bounded Latitudes (North)
From
Degree 214530.50
Minutes
Second
From
Degree 215408.67
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 821402.99
Minutes
Second
From
Degree 822138.95
Minutes
Second
(e)Survey of India Topo Sheet No. Core zone - 64 K/5 & Buffer zone - 64 K/1, 64 K/2,
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 263
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.25
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-11015/45/2018-IA.II (M)
(b)Date of Apply of TOR 28 Apr 2018
(c)Date of Issue of TOR / Standard ToR 17 Jul 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :02 May 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :07 Jun 2019
Distance of Public Hearing Venue from the Proposed Project :1.3
Play ground near village Bohardih adarsh aanganbadi house no. 1 gram panchayat Bohardih, Tehsil Masturi, District Bilaspur, Chhattisgarh
State :Chhattisgarh
District :Bilaspur
Tehsil :Masturi
Village :Bidiyadih, Bhurkunda, Godadih & Bohardih
600Regarding Employment Generation, Women Empowerment, Infrastructure Development, Skill Development, Health Education, Water Facility etc.OthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hydraulic backhoe with rock breaker013.0 CuM Backhoe/60T class machine
(2.)Hydraulic Drill02115/152 mm dia
(3.)Dozer01-
(4.)Water tanker0120 KL
(5.)Mobile Service Van01-
(6.)Hydraulic shovel013.0 CuM
(7.)Dumper0760 T
(8.)Tipper0615 T
(9.)Pay loader015.0 CuM Bucket
(10.)Pickup Van01-
(11.)Mobile Crusher (s)-1000 TPH
(12.)Hydraulic shovel035.0 CuM
(13.)Hydraulic shovel035.0 CuM
(14.)Hydraulic shovel035.0 CuM
(15.)Hydraulic shovel035.0 CuM
(16.)Explosive Van0110 Tonne
(17.)Diesel tanker013 KL
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Lime stone3900000Tons per AnnumRoad,Conveyor Belt
(2.)Waste/Top Soil225000OthersCubic Meter per AnnumOthersThrough haul road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 125
(b) Funds Allocated for Environment Management (Capital) (in Crores) 12.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.5
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 640100
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 640100
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD6500OthersKLBilaspurRoad45 Open MarketCopy of Linkage
(2.)EXPLOSIVE633600OthersKilogramBilaspurRoad45 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 12
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube87.653.886.92100
(2.)SO2Micro Gram per Meter Cube14.06.213.8480
(3.)NOxMicro Gram per Meter Cube22.211.821.9980
(4.)PM2.5Micro Gram per Meter Cube42.323.741.9260
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSNA0.00.00.00.0
(2.)pHOthersothers8.097.296.58.5
(3.)Fluoridemg/l0.850.401.01.5
(4.)TDSmg/l598.0231.05002000
(5.)Chloridesmg/l308.7726.132501000
(6.)Total Hardnessmg/l535.50117.30200600
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHOthersothers7.757.39D
(2.)DOmg/l5.604.70D
(3.)BODmg/l9.104.30D
(4.)CODmg/l24.3014.20D
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.340.9I 70-75, C 55-65, R 45-55, S 40-50
(2.)Leq(Day)A-weighted decibels(dB(A))54.551.4I 70-75, C 55-65, R 45-55, S 40-50
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Kilogram per hectare32.1412.36
(2.)pHOthersOthers7.787.02
(3.)Electric ConductivityOthersms/cm0.440.11
(4.)N(Nitrogen)Kilogram per hectare348.17198.65
(5.)K(Potassium)Kilogram per hectare391.49205.14
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 04.5 To 11.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 03.9 To 15.0
(c)Whether Ground Water Intersection will be there ? Yes
(d)Upload Copy of Central Ground Water Authority Letter Copy of Central Ground Water Authority Letter
(e)Letter No. 21-4/2596/CT/MIN/2019
(f)Date of Issue 26 Jun 2019
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface3300.25Copy of Permission LetterPipelineOthersLilager River6208/F 4-231/S-2/31/OJapra/1312 Sep 20185267
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Drinking & sanitation55Soak Pit via septic tankOthersSoak pit via septic tank05
(2.)workshop effluent9.020Oil water separatorOthersOil and water separator90
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 14
(b)Total Discharged Water (Kilolitre per Day) 5
(c)Total Reused Water (Kilolitre per Day) 9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)SoilOthersMine waste90000Tons0OthersDumpers/TippersOthersUsed for backfilling/Bund
(2.)Over BurdenOthersMine waste360000Tons0OthersDumpers/TippersOthersUsed for backfilling/Bund
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube42.301.1243.4360
(2.)SO2Microgram per Meter Cube14.001.3915.4080
(3.)NOxMicrogram per Meter Cube17.601.5819.1980
(4.)PM10Microgram per Meter Cube87.604.3491.95100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Crusher (s)-301.1PM1036.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2500
(b)Source Chhattisgarh State Power Distribution& Proposed Ca
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) NA
(e)Stack Height (in m) .
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 505.167
(c)Government Land (ha.) 77.795
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 582.962
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 505.167
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : grass land 77.795
    Total (ha.) 582.962
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Quarry Area360backfilled-54 ha and 306 water reservoir
(2.)Green belt73Lease periphery-73 ha and Non Mineralized 30 ha
(3.)Built Up Area13Road and Builtup area
(4.)OthersVirgin area136.962
Total (ha.) 582.962
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone.No NPA within 10 km of mine site
(2.)ESZsNone.No ESZs within 10 km of mine site
(3.)CorridorsNone.No Corridors within 10 km of mine site
(4.)Wildlife CorridorsNone.No wILDLIFE Corridors within 10 km of mine site
(5.)Critically Polluted AreaNone.No CPA within 10 km of mine site
(6.)WLSNone.No WLS within 10 km of mine site
(7.)ESAsNone.No ESAs within 10 km of mine site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone.None
(2.)Archaeological SitesNone.no
(3.)Defence InstallationsNone.No
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) .
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 82.247
(b)Land yet to be acquired(Ha) 422.92
(c)Status of Land acquisition if not acquired In progress
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 4
(b)No. of Households 1478
(c)No. of PDFs (Project Displaced Families) 10
(d)No. of PAFs (Project Affected Families) 722
(e)Funds Allocated for R&R(in INR) (in Lacs) 273.985
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Proposed and existing canal
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Lilager River, Seonath River and nalah
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.25
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 56
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 56
32.
Green Belt in Ha:
(a)Total Area of Green Belt 127
(b)Percentage of Total Project Area 21.79
(c)No. of Plants to be Planted 317500
(d)Funds Allocated for Plantation 50800000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialProposed project will result in growth of the surrounding areas by increased direct and indirect employment opportunities in the region including ancillary development and supporting infrastructure. Beside this, Royalty and other taxes would be additional benefit and it will be utilized by local administration for the development of socio-economic infrastructure and well being of the local population. The various activities proposed through CER (Corporate Environment Responsibility) would help i
(2.)EnvironmentalAt the conceptual stage, out of the total mining lease area (i.e. 582.962 ha), total mined-out area will be 360 ha; out of which, 54 ha will be backfilled and remaining 306 ha will be developed as water reservoir. Water stored in these reservoirs will also help in ground water recharge and agriculture. At the end of the life of mine total 127 ha (54 ha on backfilled area, 43 ha around lease periphery and 30 ha on non-mineralized area) area will be covered under greenbelt and plantation.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Non-Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)LimestoneMajor
(2.)LimestoneMajor
2.
Mine Capacity in ROM (Run of Mine) 3900000
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. BLS/LST/MPLN-1187/2019
(b)Date of Approval 04 Feb 2019
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department IBM
(e)Approved Mining Lease Area 582.962
(f)Approved Capacity 3900000
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) 182.74
(b)Mineable Reserves (Million Ton) 145.11
(c)Extractable Reserves(Million Ton) 145.11
(d)Percent(%) of Extraction 100
(e)Grade of Coal /Ore /Mineral cement grade
(f)Stripping Ratio 1 : 0.1
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) na
(h)Average Gradient(Degree) 45
(i)Mining Method Opencast
(j)Life of Mine (Years) 40
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area Yes
(c)No. of crushers 1
     6.1.    Details of crusher:
S. No.Crusher ID Capacity (in PH)Remarks
(1.)11000
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 582.962
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof Lease granted
(c)Whether Lease Deed Executed ? Yes
(i)Copy of Executed Lease deed valid as on Date Copy of Executed Lease deed
(ii)Provide area in Hectare as per executed lease deed (initial) document 582.962
(iii)Validity of the lease deed From : 21 Oct 2009 To : 20 Oct 2059
(iv)Date of Execution of Mining Lese 21 Oct 2009
(v)Reference Number nil
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof Lease valid till 2059
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps 0
(ii)Total Area (in Hectare) 0
(iii)Height (in meter) 0
(iv)Quantity (in Million Cubic meter) 0
(v)No. of year back fill up 0
(b) Details of Internal Dumps:
(i)No. of Internal Dumps 1
(ii)Total Area (in Hectare) 54
(iii)Height (in meter) 17
(iv)Quantity (in Million Cubic meter) 918
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 1.8
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 1.8
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare) 360
(b)Depth (in meter) 18
(c)Volume (in Million Cubic meter) 55.08
12.
Details of Quarry:
(a)Final Void of 306 (hectare) at a Depth of 18 meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha) 582.962
13.
Details of Transportation:
(a)In Pit/Underground to Surface From working face to crusher hopper will be transp
(b)Surface to Siding/Loading Loading will be done by Dumpers
(c)Transportation / Conveyor Details Crushed limestone will be supplied to the proposed
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)AGRICULTURE LAND505.1670505.167
(2.)FOREST LAND000
(3.)GRAZING LAND000
(4.)SETTLEMENTS000
(5.)OTHERS(Specify)Grass land77.795077.795
(6.)SURFACE WATER BODIES000
(7.)WASTE LAND000
TOTAL582.9620582.962
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)ROADS001010
(2.)BUILT UP AREA (COLONY/OFFICE)003.03
(3.)GREEN BELT730073
(4.)VIRGIN AREA00136.962136.962
(5.)EXCAVATION/QUARRY543060360
(6.)EXTERNAL OB DUMPS0000
(7.)INTERNAL OB DUMPS0000
(8.)TOP SOIL STORAGE0000
TOTAL127306149.9620582.962
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 360
(d)Safety Zone(in hectare) 43
(e)Final Void of 54 (hectare) at a Depth of 18 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 2500
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 13.0
(h)Total afforestation plant (in hectare) 127
17.
Status of progressive Mining Closure Plan:
Details Not Applicable
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Chhattisgarh
(d)Case No. 1090 of 2014
(e)Orders/Directions of the court ,if any and its relevance with the proposed project • In view of the above, the writ petition is dispo
(f)Case Details ? High Court of Chhattisgarh at Bilaspur under Wri
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant JM EnviroNet Pvt Ltd
(iii)Address J.M EnviroNet Pvt. Ltd., 202-A, ABW Tower, M.G. Road, Near IFFCO Chowk,, Gurugram - 122 001 (Haryana)
(iv)Mobile No. 9730254462
(v)Landline No. 0124414192
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Non-Coal Mining
(ix)Validity of Accreditation 02 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterWe are herewith submitting ADS Reply 30 Sep 2019
2.NA

The proposal was placed in before the EAC and PP made presented about the project, findings of their study and EMP. Based on the deliberation by EAC and presentation made by PP, the Committee deferred the proposal and asked the PP to submit the following information for further consideration and assessment.