Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed new 60 KLPD molasses based distillery by Daya Sugar Limited
(b)Name of the Company / Organisation DAYA SUGAR A UNIT OF DAYA ENGINEERING WORKS (SLEEPER) LTD.
(c)Registered Address Daya Sugar Gagalheri,Saharanpur,Saharanpur,Uttar Pradesh-247667
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Aditya Kamboj
(b)Designation (Owner/ Partner/ CEO) OCCUPIER
(c)Address 2C-3247, Gill Colony, Saharanpur,,Saharanpur,Saharanpur,Uttar Pradesh-247001
(d)Pin code 247001
(e)E-mail dayaenggs@gmail.com
(f)STD Code. 312(f)Telephone No. 2785671
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity5(g) Distilleries
(b)Category A
(c)Proposal Number IA/UP/IND2/109103/2018
(d)Master Proposal Number(Single Window) SW/109097/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot no. 00027,00028, 00037
(b)Pincode 247001
(c)Bounded Latitudes (North)
From
Degree 29.58
Minutes
Second
From
Degree 29.96
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.39
Minutes
Second
From
Degree 77.57
Minutes
Second
(e)Survey of India Topo Sheet No. 53G/9,53G/13,53F/12,53F/16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 281
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/181//2018/-IA-II(I)
(b)Date of Apply of TOR 23 May 2018
(c)Date of Issue of TOR / Standard ToR 25 Jun 2018
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :24 Apr 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 May 2019
Distance of Public Hearing Venue from the Proposed Project :1
00027,00028, 00037 Village- Adharhedi Musapur, Tal-Sahranpur, Dist- Saharanpur, State- Uttar Pradesh
State :Uttar Pradesh
District :Saharanpur
Tehsil :Saharanpur
Village :Adharhedi Musapur
1501) Control air pollution preventive measures for proposed project activity, job opportunities to local people especially youth and implementation about road. 2) Traffic condition during transformatiDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Proposed 60 KLPD Molasses based distilleryDistillery unit
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Absolute Alcohol (AA)60Kilo Litre per DayRoad
(2.)Extra Neutral Alcohol (ENA)60Kilo Litre per DayRoad
(3.)Rectified spirit(RS)60Kilo Litre per DayRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 15 Dec 2017
(iv)Valid Upto 31 Dec 2018
(v)File No. 1027/UPPCB/SAHARANPUR(UPPCBRO)CTO/WATER
(vi)Application No. 86783
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 85.76
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.64
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 5.3
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 140
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 140
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulphuric Acid18.10Tons per AnnumLocal marketRoad5 Open MarketCopy of Linkage
(2.)Molasses252Tons Crushed per DayLocal marketRoad2 Open MarketCopy of Linkage
(3.)Nutrient12.07Tons per AnnumLocal marketRoad4 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube63.020.958.31100
(2.)NOxMicro Gram per Meter Cube22.19.618.3380
(3.)SO2Micro Gram per Meter Cube14.94.210.8780
(4.)PM2.5Micro Gram per Meter Cube39.322.834.5360
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l336165500500
(2.)Chloridesmg/l13.21.67250250
(3.)Fluoridemg/l0.30.111
(4.)Heavy MetalsCadmiummg/l000.0030.003
(5.)Heavy MetalsArsenicmg/l000.010.01
(6.)Heavy MetalsLeadmg/l000.010.01
(7.)OthersSpecific Conductance 25°CNA719383.300
(8.)OthersDissolved oxygenmg/l41214600
(9.)OthersMagnesium as Mgmg/l380.7639.03030
(10.)OthersNitrate as NO3mg/l004545
(11.)OthersPhosphate as PO4mg/l0000
(12.)pHNA8.557.336.58.5
(13.)OthersTotal Alkalinity as CaCO3mg/l35.199.31200200
(14.)OthersAmmonia as NH3mg/l4.83.80.50.5
(15.)TSSmg/l336165500500
(16.)OthersSulphate as SO4mg/l2.450.52200200
(17.)OthersNitrate as NO3mg/l004545
(18.)Total Hardnessmg/l61.4214.23200200
(19.)OthersColourNA5555
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersSpecific Conductance 25°COthersµmhos/cm1648567.9A
(2.)OthersTotal Dissolved Solidsmg/l864448A
(3.)OthersTotal Alkalinity as CaCO3mg/l843.6168.72A
(4.)OthersNitrate as NO3mg/l7.031.94A
(5.)BODmg/l88.5717.5A
(6.)CODmg/l264.6139.5A
(7.)OthersTotal Hardness as CaCO3mg/l485142A
(8.)OthersCalcium as Camg/l142.3230.71A
(9.)OthersMagnesium as Mgmg/l56.7715.89A
(10.)OthersChlorides As Clmg/l136.747.8A
(11.)OthersAmmonia as NH3mg/l00A
(12.)pHNA7.917.38A
(13.)OthersSulphate as SO4mg/l47.1527.0A
(14.)DOmg/l3.12.6A
(15.)OthersPhosphate as PO4mg/l0.090.02A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))54.754.775
(2.)Leq(Night)A-weighted decibels(dB(A))35.130.845
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.716.6
(2.)K(Potassium)Milligram per Kilogram109.313.8
(3.)Electric ConductivityOthersµmhos/cm198.5137.4
(4.)P(Phosphorus)Milligram per Kilogram109.313.8
(5.)N(Nitrogen)Milligram per Kilogram249.7968.12
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.76 To 21.08
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.13 To 22.30
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater104400.002Copy of Permission LetterPipelineTube WellCGWA/NOC/IND/ORIG/2018/400616 Aug 2018104400.00
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Wastewater1125500Condensate polishing UnitGreen Belt Renewal Plant,OthersWater sprinkling ans non portable domestic use640485
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1125
(b)Total Discharged Water (Kilolitre per Day) 485
(c)Total Reused Water (Kilolitre per Day) 640
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Press MudOthersPress Mud252Tons1RoadOthersPress Mud will be sold to the Manure farmer as
(2.)Fly ashFly AshYeast sludge22.4Tons1RoadOthersFly ash will be sent to brick manufacturing
(3.)Bottom ashBottom Ash24.3Tons1RoadOthersSold to farmer as a Manure
(4.)Spent oilIndustrial Waste0.01Kilolitre1RoadAuthorized Recyclers
(5.)Domestic wasteMunicipal Solid Waste1.3Tons1RoadOthersLocal waste collection system
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube63.10.0032.165.3100
(2.)Others(Specify)NANA1001.10
(3.)SO2Microgram per Meter Cube14.90.0021.516.680
(4.)NOxMicrogram per Meter Cube22.10.0031.0223.1380
(5.)PM2.5Microgram per Meter Cube39.30.0031.741.160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Boilerconcentrated spent wash and coal581.15SO21120 ppmv on 7% O2 dry
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1980
(b)Source Captive (Boiler 22.5 TPH)
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500 kVA X 2
(e)Stack Height (in m) 58
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 3.55
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3.55
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 11510
(b)Waste/Barren Land (ha.) 15180
(c)Grazing/ Community Land (ha.) 1640
(d)Surface Water Bodies (ha.) 610
(e)Settlements (ha.) 0
(f)Industrial (ha.) 2500
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31440
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersOther industrial activity21.71-
Total (ha.) 21.71
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNot applicable0Not applicable
(2.)WLSNot applicable0Not applicable
(3.)NPANot applicable0Not applicable
(4.)ESAsNot applicable0Not applicable
(5.)ESZsNot applicable0Not applicable
(6.)CorridorsNot applicable0Not applicable
(7.)Wildlife CorridorsNot applicable0Not applicable
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNot applicable0Not applicable
(2.)Defence InstallationsNot applicable0Not applicable
(3.)ForestNot applicable0Not applicable
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 3.55701
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 20
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 30
(d)Temporary Employment- During Operation 20
(e)No. of working days 300
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Total Area of Green Belt 13.47086
(b)Percentage of Total Project Area 379.46
(c)No. of Plants to be Planted 1500
(d)Funds Allocated for Plantation 900000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA0125
(ii)Name of the EIA Consultant M/s SMS Envocare Limited
(iii)Address M/s SMS Envocare Limited, Pentagaon P3, Magarpatta City, Hadapsar, Pune
(iv)Mobile No. 9011033523
(v)Landline No. 0206680111
(vi)Email Id nilesh.deshmukh@smsl.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 02 Jul 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per the Ministry's Notification dated 13/6/2019, the project/activity is covered under category B of item 5(g) of the schedule to the EIA Notification, 2006, read with subsequent amendments, and thus requires appraisal/approval at the State level. Please submit your proposal accordingly. 02 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAditya Kamboj
DesignationOCCUPIER
Name of Company (Applicant Name should not be given here)DAYA SUGAR A UNIT OF DAYA ENGINEERING WORKS (SLEEPER) LTD.
AddressDaya Sugar Gagalheri
Print