Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Sanozen Pharma Pvt. Ltd
(b)Name of the Company / Organisation SANOZEN PHARMA PRIVATE LIMITED
(c)Registered Address D.No: 14-65, Doyens Township, Serilingampally, Hyderabad-500019,,Hyderabad,Telangana-500019
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant JSANJEEVA REDDY
(b)Designation (Owner/ Partner/ CEO) MANAGINGDIRECTOR
(c)Address Plot No. 170,171 and 172, Phase-II, IDA Pashamylaram,,Patancheru,Medak,Telangana-502307
(d)Pin code 502307
(e)E-mail sanozenpharma@gmail.com
(f)STD Code. 40(f)Telephone No. 23060702
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category B1
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/TG/IND2/108915/2019
(d)Master Proposal Number(Single Window) SW/108912/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 170, 171 & 172
(b)Pincode 502307
(c)Bounded Latitudes (North)
From
Degree 17
Minutes
Second
From
Degree 17
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78
Minutes
Second
From
Degree 78
Minutes
Second
(e)Survey of India Topo Sheet No. 56K2, K3, K6, K7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 551
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 10
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Telangana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraSolapurMoholChincholi
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/126/2019-IA-II(I)
(b)Date of Apply of TOR 18 Apr 2019
(c)Date of Issue of TOR / Standard ToR 24 May 2019
(d)Date of Apply of EC 27 May 2019
(e)Date of Issue of EC 31 May 2019
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since the plant site is located in Notified IDA, P
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Chennai
(iii)Letter No. 1
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 31 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Amifostine05050OthersKg/MonthRoad
(2.)Anastrozole0100100OthersKg/MonthRoad
(3.)Docetaxel02525OthersKg/MonthRoad
(4.)Imatinib Mesylate0350350OthersKg/MonthRoad
(5.)Lapatinib Ditosylate Monohydrate0100100OthersKg/MonthRoad
(6.)Ledipasvir0150150OthersKg/MonthRoad
(7.)Letrozole05050OthersKg/MonthRoad
(8.)lomustine01515OthersKg/MonthRoad
(9.)Melphalan05050OthersKg/MonthRoad
(10.)Oxaliplatin04040OthersKg/MonthRoad
(11.)Paclitaxel01515OthersKg/MonthRoad
(12.)Ponatinib0200200OthersKg/MonthRoad
(13.)Cisplatin02020OthersKg/MonthRoad
(14.)Nilotinib Hydrochloride Hydrate0150150OthersKg/MonthRoad
(15.)Sorafenib Tosylate0200200OthersKg/MonthRoad
(16.)Bendamustine Hydrochloride02525OthersKg/MonthRoad
(17.)Methotrexate07575OthersKg/MonthRoad
(18.)Raltegravir050005000OthersKg/MonthRoad
(19.)Chlorambucil05050OthersKg/MonthRoad
(20.)Erlotinib0250250OthersKg/MonthRoad
(21.)Citalopram Hydrobromide050005000OthersKg/MonthRoad
(22.)Gefitinib0500500OthersKg/MonthRoad
(23.)Sofosbuvir0500500OthersKg/MonthRoad
(24.)Verapamil Hydrochloride050005000OthersKg/MonthRoad
(25.)Dapoxetine Hydrochloride0120120OthersKg/MonthRoad
(26.)Zoledronic0100100OthersKg/MonthRoad
(27.)Bortezomib055OthersKg/MonthRoad
(28.)Procarbazine02020OthersKg/MonthRoad
(29.)Dacarbazine02525OthersKg/MonthRoad
(30.)Dasatinib Monohydrate0200200OthersKg/MonthRoad
(31.)Pazopanib Hydrochloride0200200OthersKg/MonthRoad
(32.)Premetrexed Disodium0150150OthersKg/MonthRoad
(33.)Regorafenib0100100OthersKg/MonthRoad
(34.)Telmisartan050005000OthersKg/MonthRoad
(35.)Temozolomide05050OthersKg/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Cooling Tower-2 x 300 TR2 x 300 TR
(2.)Coal Fired Boiler1 TPH & 2 TPHContinued1 TPH & 2 TPH
(3.)D.G. Set65 KVA & 125 KVA500 KVA500 KVA65 KVA & 125 KVA are dropped
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 26 Sep 2017
(iv)Valid Upto 31 Aug 2022
(v)File No. TSPCB/ZO/RCP/PASHA/79/CFO/2017-1601
(vi)Application No. 1
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 18
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.70
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.16
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 106
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 106
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dimethyl amino propyl chloride hydrochloride311.67Otherskg/dayfrom within the countryRoad10 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2019 To 31 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube63.051.262.8100
(2.)NOxMicro Gram per Meter Cube21.418.821.480
(3.)PM2.5Micro Gram per Meter Cube25.220.525.160
(4.)SO2Micro Gram per Meter Cube14.011.414.080
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersNA8.037.016.58.5
(2.)TDSmg/l18593535002000
(3.)TSSmg/l0000
(4.)Total Hardnessmg/l468170200600
(5.)Chloridesmg/l62163.52501000
(6.)Fluoridemg/l0011.5
(7.)Heavy MetalsNANA0000
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l4016E
(2.)DOmg/l7.05.2E
(3.)pHNA8.286.99E
(4.)BODmg/l9.54.5E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))5535.770
(2.)Leq(Day)A-weighted decibels(dB(A))62.943.175
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.056.87
(2.)N(Nitrogen)Milligram per Kilogram21.3510.48
(3.)P(Phosphorus)Milligram per Kilogram11.310.2
(4.)K(Potassium)Milligram per Kilogram11471.6
(5.)Electric ConductivityOthersµ mhos1849211
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 21 To 3.85
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.98 To 22.65
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersIDA Water supply78.480.2 Not Appliacble PipelineOthersIDA Water supply006 May 201978.48
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)HTDS LTDS24.3930ZLD SystemOthersReuse within the plant and Recycling24.390
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 24.39
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 24.39
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Spent CarbonHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.033Tons10RoadOthersSent to Cement Industries
(2.)Solvent Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.288Tons10RoadOthersSent to Cement Industries
(3.)Organic distillate from MEE StripperHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.350Tons10RoadOthersSent to Cement Industries
(4.)Inorganic Solid wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.022Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.020Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(6.)MEE SaltsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.528Tons10RoadTreatment, Storage and Disposal Facility(TSDF)
(7.)Used oilsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.1Kilolitre10RoadAuthorized Recyclers
(8.)Organic Solid WasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1.734Tons10RoadOthersSent to Cement Industries
(9.)Ash from boilerFly Ash3.675Tons10RoadOthersSent to Brick Manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube62.80.10.463.2100
(2.)SO2Microgram per Meter Cube140.1115.0180
(3.)NOxMicrogram per Meter Cube21.40.11.222.680
(4.)PM2.5Microgram per Meter Cube25.10.10.125.2160
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)1 TPH BoilerCoal Fired300.4SO20.19
(2.)2 TPH BoilerCoal Fired300.4SO20.59
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 900
(b)Source TSSPDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 500 KVA
(e)Stack Height (in m) 10
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.622
    Total Land (ha.) 0.622
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17113.8
(b)Waste/Barren Land (ha.) 7316.2
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2260
(e)Settlements (ha.) 4073
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 637
    Total (ha.) 31400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.622
Total (ha.) 0.622
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaPatancheru Industrial Area9.5NA
(2.)WLSNA0NA
(3.)NPANA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)ESAsNA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Archaeological SitesNA0NA
(3.)Defence InstallationsOrdnance Factory5.5NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.622
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Isnapur tank
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 0.2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 50
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt00.240.24
(2.)Percentage of Total Project Area039.7239.72
(3.)No. of Plants0361361
(4.)Funds Allocated0200000200000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1821/RA 0100
(ii)Name of the EIA Consultant Rightsource Industrial Solutions Pvt. Ltd.
(iii)Address Plot No: 203, H.No:5-36/203, Prashanthi Nagar, IDA, Kukatpally, Hyderabad – 500072
(iv)Mobile No. 9885560011
(v)Landline No. 0402307060
(vi)Email Id eiaemp@rightsource.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 25 Feb 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe project/activity is covered under category B of item 5(f) of the schedule to the EIA Notification, 2006, and requires appraisal/approval at State level by the concerned SEAC/SEIAA. Please submit your proposal accordingly. 27 Jul 2019
2.NAThe correction have been made as per the instruction received 30 Jul 2019
3.NAPlease see our observations dated 27/7/2019 for the needful. 03 Aug 2019
4.NAThe correction have been made as per the instruction received 20 Aug 2019
5.NAAs per your submissions, the proposal is covered under category B and presently SEIAA is existing in the state of Telangana. Therefore, you are requested to make application to the SEIAA 27 Sep 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantJSANJEEVA REDDY
DesignationMANAGINGDIRECTOR
Name of Company (Applicant Name should not be given here)SANOZEN PHARMA PRIVATE LIMITED
AddressD.No: 14-65, Doyens Township, Serilingampally, Hyderabad-500019