1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Industrial Model Township, Kharkhoda, Sonepat, Haryana | (b)Name of the Company / Organisation | HARYANA STATE INDUSTRIES AND INFRASTRUCTURE DEVELOPMENT CORPORATION HSIIDC | (c)Registered Address | HSIIDC, Plot No C-13-14, Sector-6, panchkula, haryana,,Panchkula,Haryana-134109 | (d)Legal Status of the Company | State PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | HSIIDC Haryana | (b)Designation (Owner/ Partner/ CEO) | GM | (c)Address | HSIIDC, Kharkhoda, SOnepat, Haryana,,Kharkhoda,Sonipat,Haryana-131001 | (d)Pin code | 131001 | (e)E-mail | infosmiakundli@gmail.com | (f)STD Code. | 130(f)Telephone No. | 2370586 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| Minor Activity | 7(c) Industrial estates/ parks/ complexes/ areas, export processing Zones
| (b)Category | A | (c)Proposal Number | IA/HR/NCP/62795/2017 | (d)Master Proposal Number(Single Window) | SW/108752/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Kharkhoda | (b)Pincode | 131402 | (c)Bounded Latitudes (North) | | From | | Degree | 284935.92 | Minutes | | Second | | From | | Degree | 285003.98 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 765442.38 | Minutes | | Second | | From | | Degree | 765812.05 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53D13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 222 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 4 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Haryana | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Haryana | Sonipat | Kharkhoda | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 21-237/2017-IA.III | (c)Date of Apply of TOR | 09 Jun 2017 | (d)Date of Issue of TOR / Standard ToR | 23 Aug 2017 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 08 Mar 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Kharkhoda | State : | Haryana | District : | Sonipat | Tehsil : | Kharkhoda | Village : | Kharkhoda |
| 31 | Basic issues related to employment and social development | Deputy Commissioner | | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Industrial Model Township Kharkhoda | 1301.95 hectare | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | 1301.95 | 1301.95 | Hectares | | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4000 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.46 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 80 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.46 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Coarse Sand | 0 | Tons per Annum | | Nearby Area | Road | | 10 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 255.9 | 133.3 | 253.6 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 14.1 | 7.2 | 14 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 47 | 24.3 | 45.9 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 129.7 | 64.7 | 128.5 | 60 | |
14.2. No. of Ground Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 2181 | 1260 | 500 | 2000 | (2.) | Total Hardness | | | mg/l | | 810 | 450 | 200 | 600 | (3.) | Fluoride | | | mg/l | | 1.2 | 0.7 | 1 | 1.5 | (4.) | TSS | | | mg/l | | 2181 | 1260 | 500 | 2000 | (5.) | Heavy Metals | | Zinc | mg/l | | 1 | 0.6 | 5 | 15 | (6.) | Chlorides | | | mg/l | | 562 | 330 | 250 | 1000 | (7.) | pH | | | NA | | 8.12 | 7.09 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 4.1 | 2.8 | A | (2.) | pH | | NA | | 7.92 | 7.02 | A | (3.) | COD | | mg/l | | 16 | 10 | A | (4.) | DO | | mg/l | | 7 | 5.4 | A | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63.4 | 48.3 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.7 | 39.1 | 65 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 10.3 | 7.1 | (2.) | K(Potassium) | Milliequivalents per 100 Gram | | 0.45 | 0.28 | (3.) | Electric Conductivity | Millisiemens per Centimetre | | 16.4 | 13.4 | (4.) | N(Nitrogen) | Percent | | 39.9 | 33.5 | (5.) | pH | | | 8.16 | 7.56 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.57 To 24.84 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.64 To 22.46 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 87275 | 5.2 | Copy of Permission Letter | Canal | | Others | Canal | 1170-73/Const | 14 Jun 2011 | 66150 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Waste Water From Site | 63900 | 63900 | CETP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 63900 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 63900 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 63900 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Industrial Waste | Domestic Waste | 131 | Tons | 0 | Road | | Others | TSDF, Authorised Recycler | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 255.9 | 0.7 | 0.22 | 256.13 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 129.7 | 0.7 | 0.22 | 129.93 | 60 | (3.) | NOx | | Microgram per Meter Cube | 51.2 | 0.7 | 6.5 | 57.8 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 14.1 | 0.7 | 0.8 | 15.0 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 30 | 0.332 | PM10 | | 0.0375 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 500 | (b)Source | State Electricity Board | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1890 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 1301.95 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 1301.95 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 41900.74 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 255.74 | (e)Settlements (ha.) | 3396.04 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 232.8 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Open Land, Open Scrub, Vegetation | 2363.18 | Total (ha.) | 48148.5 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Industrial Model Township | 1301.95 | Hectare | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Nil | 0 | Nil | (2.) | ESZs | Nil | 0 | Nil | (3.) | Corridors | Nil | 0 | Nil | (4.) | Wildlife Corridors | Nil | 0 | Nil | (5.) | ESAs | Nil | 0 | Nil | (6.) | WLS | Nil | 0 | Nil | (7.) | NPA | Nil | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Nil | 0 | Nil | (2.) | Defence Installations | | Nil | 0 | Nil | (3.) | Forest | | Sultanpur Dabas | 8 | Reserve Forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1301.95 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Aquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 10 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 5100 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 50000 | (c)Temporary Employment- During Construction | 600 | (d)Temporary Employment- During Operation | 49400 | (e)No. of working days | 365 | (f)Total Manpower | 100000 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 433.62 | (b)Percentage of Total Project Area | 33.31 | (c)No. of Plants to be Planted | 202400 | (d)Funds Allocated for Plantation | 20240000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 100 | (b)Total No. of Flats to be Build | 1379 | (c)No. of Buildings | 3109 | (d)Total plot area (sqm) | 13019506 | (e)Total built up area (sqm) | 4449721 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 32 | (d)Capacity | 3200 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 5947 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LED CFL SOLAR | (b)Percentage | 2 | (c)Quantity | 10 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
(1.) | Category B as per EIA Notification | 2614 | B | (2.) | Category A as per EIA Notification | 475 | A | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0064 | (ii)Name of the EIA Consultant | Grass Roots Research and Creation India Pvt. Ltd. | (iii)Address | F-375, Sector-3, Noida | (iv)Mobile No. | 9811554031 | (v)Landline No. | 0120404463 | (vi)Email Id | eia@grc-india.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 04 Dec 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Copy of documents in support of the competence/authority is not submitted.
Please submit the copy of documents in support of the competence/ authority | 12 Jul 2019 | 2. | NA | The correction have been made as per the instruction received | 16 Jul 2019 | 3. | NA | 1) In Form 2 application at SI. NO. 20 and SI. No. 22(1) units of land not mentioned
2) In Form -2 application at Serial No. 27 R&R details like No of house, PDF, PAF are mentioned Zero and fund allocated for R&R whether it is Lakhs/Crore please clarify.
3) As per the ToR Condition Green belt should be 33%, but in Form2 application it was mentioned 15.55 % please clarify.
4) No Declaration from EIA consultant organization about who prepared EIA/EMP report and experts involved in preparation with their signature are not available in EIA/EMP report. Please submit the report with above declaration with signature.
5) ToR conditions wise compliance document also not find in EIA/EMP report | 18 Jul 2019 | 4. | NA | The correction have been made as per the instruction received | 31 Jul 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS REPLY IMT KHARKHODA | 20 Jul 2020 | 2. | NA | Please submit following information as per Minutes of 237th EAC meeting held on 29.06.2020:
(i) The proponent is required to submit a detailed scheme for utilization of treated effluent and sewage as well for achieving zero discharge into drain leading to river Yamuna.
(ii) Revised layout plan to be submitted by excluding Rampur village within the project boundaries. | 13 Jul 2020 | 3. | ADS Reply Letter | Reply of ADS by MS | 09 Jun 2020 | 4. | NA |
|
|