1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Adasa UG to OC | (b)Name of the Company / Organisation | Western Coalfields Limited | (c)Registered Address | Coal Estate Civil lines, Nagpur-440001,Coal Estate Civil lines, Nagpur-440001,Nagpur,Maharashtra-440001 | (d)Legal Status of the Company | Central PSU | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Kaushik Chakraborty | (b)Designation (Owner/ Partner/ CEO) | G.M (MINING)/ ENVIRONMENT. | (c)Address | NIL | (d)Pin code | 440001 | (e)E-mail | gmenvironment.wcl@coalindia.in | (f)STD Code. | 712(f)Telephone No. | 2510151 | (g)Fax No. | 2510151 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | 2(b) Mineral beneficiation
| (b)Category | A | (c)Proposal Number | IA/MH/CMIN/108663/2019 | (d)Master Proposal Number(Single Window) | SW/108657/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Latitudes : 21° 19' 29'' N to 21° 21' 4'' N Longit | (b)Pincode | 441107 | (c)Bounded Latitudes (North) | | From | | Degree | 21.32472222 | Minutes | | Second | | From | | Degree | 21.35111111 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78.94111111 | Minutes | | Second | | From | | Degree | 78.97944444 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 55 K/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 313.75 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.1 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/387/2015.IA-II(M) | (c)Date of Issue of TOR | 19 Jun 2019 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 19 Sep 2019 | (c)Date of Issue of EC | 03 Feb 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 06 Feb 2019 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Mine manager Office, Adasa UG Mine, Kotodi Village, PO – Patkhakhedi, Tahsil-Saoner, Nagpur | State : | Maharashtra | District : | Nagpur | Tehsil : | Savner | Village : | Kotodi |
| 200 | Employement, Health Facility, Compensation against land, etc | Others | ADM | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 3-6/2012(ENV) | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Sep 16 2016 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal | 0.50 | 1.35 | 1.85 | Others | Million tonnes per annum | Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal Mine | Underground mine | Opencast mine | Opencast mine | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 08 Jun 2017 | (iv)Valid Upto | 31 Jan 2021 | (v)File No. | BO/JD(APC)/UAN NO. 2082/CC-1706000437 DATED 08.06. | (vi)Application No. | UAN NO. MPCB-CONSENT-2082 dated 29.03.2016 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 333.4393 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 22.0919 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.33 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.11 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1.35 | (b)Existing quantity of raw material/fuel | 0.50 | (c)Total quantity of raw material/fuel | 1.85 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Diesel | 656757 | Others | Litre | IOC | Road | | 10 | Fuel Supply Agreement | | Copy of Linkage | (2.) | Explosives | 4718667 | Others | Kg/year | CIL approved vendors | Road | | 10 | Fuel Supply Agreement | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2016 To 31 Dec 2016 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 71 | 46 | 70.5 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 15.2 | 11.5 | 15.2 | 80 | (3.) | Others | Nil | NA | 0 | 0 | 0 | 0 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 45 | 25 | 44.5 | 60 | (5.) | NOx | | Micro Gram per Meter Cube | 25.3 | 14.2 | 25.2 | 80 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.3 | 7.1 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 470 | 460 | 500 | 2000 | (3.) | Total Hardness | | | Others | mg/L as CaCo3 | 270 | 260 | 75 | 200 | (4.) | Heavy Metals | | Zinc | Others | Zn | 0.3 | 0.25 | 5.0 | 15 | (5.) | Others | Sulphate | | Others | SO4 | 60 | 55 | 200 | 400 | (6.) | TSS | | | mg/l | | 18 | 16 | 0 | 0 | (7.) | Fluoride | | | Others | as F | 0.5 | 0.3 | 1.0 | 1.5 | (8.) | Chlorides | | | Others | as Cl | 25 | 20 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | NA | 7.7 | 7.6 | C | (2.) | DO | | Others | NA | 6.8 | 6.4 | C | (3.) | BOD | | mg/l | | 2.8 | 2.0 | C | (4.) | COD | | mg/l | | 6.5 | 6.4 | C | (5.) | Others | Chlorides | mg/l | | 70 | 65 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.7 | 50.1 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 46.2 | 45.2 | 45 | |
14.5. No. of Soil Sample Monitored locations : 3 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 320.1 | 315.5 | (2.) | P(Phosphorus) | Kilogram per hectare | | 22.3 | 20.1 | (3.) | K(Potassium) | Kilogram per hectare | | 155.2 | 148.7 | (4.) | pH | | | 6.6 | 6.2 | (5.) | Electric Conductivity | Others | m-mhos/cm at 20 degree celcius | 0.65 | 0.62 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14.55 To 8.20 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 14.35 To 7 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | 21-4/812/MH/MIN/2017 (Application under process)) | (f)Date of Issue | 27 Feb 2017 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine water | 3640 | 0 | Copy of Permission Letter | Pipeline | | Others | Mine water | 21-4/812/MH/MIN/2017 (Application under process)) | 27 Feb 2017 | 3640 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Mine discharge | 9735.0 | 9735.0 | Sedimentation | Discharge into Surface Water Body,Reuse within the Plant & Recycling | | 3640 | 6095 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 9735 | (b)Total Discharged Water (Kilolitre per Day) | 6095 | (c)Total Reused Water (Kilolitre per Day) | 3640 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Over Burden | Others | Over burden qantity in Million cubic meter | 11.60 | Tons | 0.8 | Others | Internal Haul roads | Others | Internal backfilling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 44.5 | 1.9 | 1.08 | 45.59 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | (3.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 0 | (4.) | PM10 | | Microgram per Meter Cube | 57.6 | 1.8 | 31.49 | 89.56 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Not Applicable | Not Applicable | 0 | 0 | NOx | | 0 | (2.) | Not Applicable | Not applicable | 0 | 0 | PM10 | | 0 | (3.) | Not applicable | Not applicable | 0 | 0 | SO2 | | 0 | (4.) | Not Applicable | Not applicable | 0 | 0 | Others | NA | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1444 | (b)Source | MSEDCL | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 534.49 | (c)Government Land (ha.) | 29.92 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 30.0 | Total Land (ha.) | 594.41 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 534.49 | (b)Waste/Barren Land (ha.) | 29.92 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : land for Rehabilation of villages | 30.0 | Total (ha.) | 594.41 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 287.58 | | (2.) | OB Dump Area | | 85.0 | External OB Dump area | (3.) | Main Plant | | 12.0 | Infrastructure | (4.) | Others | Embankment | 24.0 | | (5.) | Safety Zone | | 152.83 | Area needed for rationalization and blasting zone | (6.) | Township | | 3.0 | Roads | (7.) | Built Up Area | | 30.0 | land for Rehabilation of villages | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not Applicable | 0 | Not falls in Critically Polluted areas | (2.) | Corridors | Not Applicable | 0 | Nil | (3.) | WLS | Not Applicable | 0 | Nil | (4.) | Wildlife Corridors | Not Applicable | 0 | Nil | (5.) | ESAs | Not Applicable | 0 | Nil | (6.) | NPA | Not Applicable | 0 | Nil | (7.) | ESZs | Not Applicable | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Not Applicable | 0 | Nil | (2.) | Defence Installations | | Not Applicable | 0 | Nil | (3.) | Forest | | Not Applicable | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 12.66 | (b)Land yet to be acquired(Ha) | 581.75 | (c)Status of Land acquisition if not acquired | under progress | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 2 | (b)No. of Households | 474 | (c)No. of PDFs (Project Displaced Families) | 474 | (d)No. of PAFs (Project Affected Families) | 797 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 9433 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | In the dip side (south side) of Adasa block property, a seasonal nalla is passing through coal bearing area, which is required to be diverted to release coal. Provision of Rs 10.71 crore has been made for diversion of seasonal nalla passing through Adasa block along dipside quarry boundary of proposed Adasa UG to OC. | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | In the dip side (south side) of Adasa block property, a seasonal nalla is passing through coal bearing area, which is required to be diverted to release coal. Provision of Rs 10.71 crore has been made | (ii)Details of Study Conducted | Yet to be conducted. CDO Nasik has been requested | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Chandrabhaga Nadi (Seasonal nallah) Kolar River Kanhan River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 1.50 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 155 | (b)Permanent Employment-During Operation | 155 | (c)Temporary Employment- During Construction | 70 | (d)Temporary Employment- During Operation | 70 | (e)No. of working days | 330 | (f)Total Manpower | 450 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1.0 | 360.03 | 361.03 | (2.) | No. of Plants | 2500 | 900080 | 902580 | (3.) | Percentage of Total Project Area | 0.27 | 99.73 | 100 | (4.) | Funds Allocated | 0 | 2.33 | 2.33 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The project will lead to development of roads, ancillary industries, Improvement in social & living standards by providing opportunities of direct & indirect employment to local community | (2.) | Environmental | Conservation of coal. Also it will lead to positive environmental impacts like green cover, mine water utilization , etc. | (3.) | Financial | A substantial percentage of population is dependent on mining industry directly or indirectly. Because of this mining project some of the local population may take direct employment but a substantial impact will be on creation of indirect job opportunities and employment. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Coal | Major | (2.) | Coal | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1.85 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | WCL/BD/SECTT/BM-306/2018/731 | (b)Date of Approval | 24 Nov 2018 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | WCL Board | (e)Approved Mining Lease Area | 594.41 | (f)Approved Capacity | 1.85 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 29.46 | (b)Mineable Reserves (Million Ton) | 23.61 | (c)Extractable Reserves(Million Ton) | 22.06 | (d)Percent(%) of Extraction | 93.35 | (e)Grade of Coal /Ore /Mineral | G8 | (f)Stripping Ratio | 1 : 6.64 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | Not applicable as it is opencast mine | (h)Average Gradient(Degree) | 1 in 6.5 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 18 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | Yes | (c)No. of crushers | 2 | |
|
6.1. Details of crusher: |
---|
S. No. | Crusher ID | Capacity (in PH) | Remarks |
---|
(1.) | 1 | 1200 | | (2.) | 2 | 600 | | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | Yes | (b)No. of seams | 5 | (c)Thickness of seams to be worked on | 7.42 | (d)Maximum Thickness of Seams (metres) | 7.42 | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 594.41 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | Land acquired as per CBA, 1957 | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 21.50 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 21.50 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of 139.55 (hectare) at a Depth of 114 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 287.58 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | Dumper | (b)Surface to Siding/Loading | tipper | (c)Transportation / Conveyor Details | Road transportation, Rail | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | OTHERS(Specify) | Government land | 29.92 | 0 | 29.92 | (2.) | SETTLEMENTS | | 0 | 0 | 0 | (3.) | GRAZING LAND | | 0 | 0 | 0 | (4.) | WASTE LAND | | 0 | 0 | 0 | (5.) | FOREST LAND | | 0 | 0 | 0 | (6.) | AGRICULTURE LAND | | 534.49 | 0 | 534.49 | (7.) | SURFACE WATER BODIES | | 0 | 0 | 0 | |
TOTAL | 564.41 | 0 | 564.41 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 0 | 0 | 0 | | 0 | (2.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | BUILT UP AREA (COLONY/OFFICE) | | 1 | 0 | 8 | | 9 | (4.) | EXCAVATION/QUARRY | | 148.03 | 139.55 | 0 | | 287.58 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | ROADS | | 1 | 0 | 2 | | 3 | (7.) | VIRGIN AREA | | 120 | 0 | 35.83 | | 155.83 | (8.) | EXTERNAL OB DUMPS | | 85.0 | 0 | 0 | | 85 | (9.) | Other | Embankment | 6 | 0 | 18 | | 24 | |
TOTAL | 361.03 | 139.55 | 63.83 | 0 | 564.41 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 85.0 | (b)Internal Dump(in hectare) | 148.03 | (c)Quarry(in hectare) | 287.58 | (d)Safety Zone(in hectare) | 152.083 | (e)Final Void of 139.55 (hectare) at a Depth of 114 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 66 | (h)Total afforestation plant (in hectare) | 361.03 | |
|
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 2012 | 0.5 | 0.5 | 0.5 | 0.318 | 0 | (2.) | 2013 | 0.5 | 0.5 | 0.5 | 0.324 | 0 | (3.) | 2015 | 0.5 | 0.5 | 0.5 | 0.304 | 0 | (4.) | 2011 | 0.50 | 0.50 | 0.50 | 0.291 | 0 | (5.) | 2014 | 0.5 | 0.5 | 0.5 | 0.319 | 0 | (6.) | 2017 | 0.5 | 0.5 | 0.5 | 0.139 | 0 | (7.) | 2018 | 0.50 | 0.50 | 0.50 | 0.096 | 0 | (8.) | 2009 | 0.5 | 0.5 | 0.5 | 0.286 | 0 | (9.) | 2010 | 0.50 | 0.50 | 0.50 | 0.287 | 0 | (10.) | 2016 | 0.5 | 0.5 | 0.5 | 0.244 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/RA 0092 | (ii)Name of the EIA Consultant | CMPDI | (iii)Address | Gondwana Place, Kanke Road, Ranchi-834031 | (iv)Mobile No. | 6512231850 | (v)Landline No. | 0651223185 | (vi)Email Id | Gmenv.cmpdi@coalindia.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 01 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Present CTO dated 8/6/2017 is for production capacity of 0.21 MTPA (UG) in an area of 1554.36 ha. Please inform about the CTO for UG capacity of 0.5 MTPA against EC dated 15/7/2009 granted by the Ministry. | 11 Aug 2019 | 2. | NA | The correction have been made as per the instruction received | 13 Aug 2019 | 3. | NA | You are requested to submit the following information
1. The green belt plan submitted in the form-2 is not proper. You are requested to submit the green belt plan showing the complete details
2. Kindly refer to the page no. (ii) of the EMP report, it was mentioned that the ATR of the public hearing is given at annexure-VIII. But there is no such annexure attached. Therefore, you are requested to provide time bound action plan for the issues raised during the public consultation along with the budgetary provisions
3. May kindly refer to the Chapter-7, the details regarding public consultation is not complete. Integration of the of the issues raised in the public consultation in the EMP.
4. Signatures of the participants attended during the public hearing
5. Mining plan approval for the proposed capacity i.e. 1.675 MTPA in place of the 1.5 MTPA submitted with the application
6. Action taken report on the non-compliance and partial compliance reported in the certified compliance report dated 22.11.2016
7. May kindly refer to the chapter-8, the project benefits provided is generic in nature. You are requested to provide social and environmental benefits by the project inter alia including fund provision for CER along with the proposed activities based on the issues raised during the PH in complaince with the Ministry's OM dated 1st May 2018. | 18 Sep 2019 | 4. | NA | The correction have been made as per the instruction received | 19 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Please find attached herewith, the detailed compliance report against the 49th EAC meeting's directives held on 22.10.2019. This is submitted for your kind perusal. | 19 Nov 2019 | 2. | NA | ok | 11 Nov 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Kaushik Chakraborty | Designation | G.M (MINING)/ ENVIRONMENT. | Name of Company (Applicant Name should not be given here) | Western Coalfields Limited | Address | Coal Estate Civil lines, Nagpur-440001 |
|