Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Banda Major Irrigation Project
(b)Name of the Company / Organisation Madhya Pradesh Water Resources Department
(c)Registered Address O/o Chief Engineer Dhasan Ken Basin Water Resources Deptt. Opposite Forest Office Gate Tili Road Sagar,,Sagar,Madhya Pradesh-470001
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vinod Kumar Sharma
(b)Designation (Owner/ Partner/ CEO) EE
(c)Address O/o Chief Engineer Dhasan Ken Basin WRD Sagar,,Sagar,Sagar,Madhya Pradesh-470001
(d)Pin code 470001
(e)E-mail trivedichik1979@gmail.com
(f)STD Code. 7582(f)Telephone No. 236085
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity1(c) River Valley projects
(b)Category A
(c)Proposal Number IA/MP/RIV/73548/2018
(d)Master Proposal Number(Single Window) SW/108465/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Uldan
(b)Pincode 470001
(c)Bounded Latitudes (North)
From
Degree 23.86
Minutes
Second
From
Degree 24.32
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78.62
Minutes
Second
From
Degree 79.39
Minutes
Second
(e)Survey of India Topo Sheet No. 54 L 16
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 460
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshSagarBanda
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/08/2018-IA.I(R)
(b)Date of Apply of TOR 17 Mar 2018
(c)Date of Issue of TOR / Standard ToR 19 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :31 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :2
Community Hall Mahadev Ghata Mela Premises
State :Madhya Pradesh
District :Sagar
Tehsil :Banda
Village :Uldan
100Related to rate of compensation, Rehabilitation and Resettlement Policy, Employment Opportunities, Compensation for trees, well etc.OthersAdditional District Magistrate
(2.)
Date of Advertisement :31 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :2
Krishi Upaj Mandi Premises
State :Madhya Pradesh
District :Chhatarpur
Tehsil :Chhatarpur
Village :Bakswaha
150Related to rate of compensation, Rehabilitation and Resettlement Policy, Employment Opportunities, Compensation for trees, well etc.OthersCEO Zila Panchayat
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)NANA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)800000HectaresPipe Conveyor
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2610.5354
(b) Funds Allocated for Environment Management (Capital) (in Crores) 35667.855
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1305.27
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1735.27
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Muck22.33Cubic Meter per DayMuck ExacavationRoad.5 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 10 Jan 2018 To 30 Jan 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube56.128.252.99100
(2.)NOxMicro Gram per Meter Cube8.43.77.7180
(3.)PM2.5Micro Gram per Meter Cube25.511.224.5160
(4.)SO2Micro Gram per Meter Cube10.44.19.5480
    14.2.     No. of Ground Water monitoring locations : 15
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l242133200600
(2.)TSSmg/l0000
(3.)Chloridesmg/l165.476.22501000
(4.)TDSmg/l18902305002000
(5.)pHNA8.467.016.58.5
(6.)Fluoridemg/l0011.5
    14.3.     No. of Surface Water monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.57.18A
(2.)DOmg/l8.36.4A
(3.)CODmg/l8.91.1A
(4.)BODmg/l2.90.1A
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))56.151.565
(2.)Leq(Night)A-weighted decibels(dB(A))42.740.655
    14.5.     No. of Soil Sample Monitored locations : 15
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityOthersµS/cm630412
(2.)pH8.27.3
(3.)P(Phosphorus)Kilogram per hectare34.023.2
(4.)K(Potassium)Kilogram per hectare98.072.0
(5.)N(Nitrogen)Kilogram per hectare199152
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24.0 To 4.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 15.0 To 5.0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface69142.460Copy of Permission LetterPipelineWeirNA01 Jan 201969142.46
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000Reuse within the Plant & Recycling0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MuckOthersExcavated soil2233000Kilolitre0.5RoadOthersspread in low lying areas
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube25.50.50025.660
(2.)NOxMicrogram per Meter Cube8.40.5008.4380
(3.)SO2Microgram per Meter Cube10.40.50010.4380
(4.)PM10Microgram per Meter Cube28.20.50028.21100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)NANA00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 28230
(b)Source transmission line
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 505.50
(b)Private Land (ha.) 3645.13
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 548.45
(e)Other Land (ha.) 0
    Total Land (ha.) 4699.08
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 112834.37
(b)Waste/Barren Land (ha.) 2178.11
(c)Grazing/ Community Land (ha.) 0.00
(d)Surface Water Bodies (ha.) 1624.84
(e)Settlements (ha.) 2292.74
(f)Industrial (ha.) 0.00
(g)Forest (ha.) 30045.36
(h)Mangroves (ha.) 0.00
(i)Marine Area (ha.) 0.00
(j)Others (ha.) : Scrub Land 25157.17
    Total (ha.) 174132.58999999997
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Water Reservoir468.419
(2.)OthersSpill Channel2.40
(3.)Main Plant10.611
(4.)Built Up Area24.07Road and Power line
Total (ha.) 505.5
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNoradehi58No protected area within 10 Km
(2.)Wildlife CorridorsNA00
(3.)ESAsNA00
(4.)Critically Polluted AreaNA00
(5.)NPANA00
(6.)ESZsNA00
(7.)CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00
(2.)Archaeological SitesNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 4699.08
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 28
(b)No. of Households 7610
(c)No. of PDFs (Project Displaced Families) 2845
(d)No. of PAFs (Project Affected Families) 2845
(e)Funds Allocated for R&R(in INR) (in Lacs) 24500000
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area 70
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 100
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 350
(d)Temporary Employment- During Operation 100
(e)No. of working days 22
(f)Total Manpower 570
32.
Green Belt in Ha:
(a)Total Area of Green Belt 35
(b)Percentage of Total Project Area 0.74
(c)No. of Plants to be Planted 17500
(d)Funds Allocated for Plantation 4500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project will bring water to 80,000 ha command area covering 318 villages, which are presently water scarce and cannot irrigate their land efficiently due to shortage of water. The project will bring direct environment and social benefits, which in turn will bring prosperity to the area and increase spending power of farmers, bringing economic benefits to the region. Direct benefits include public health infrastructure, awareness and training programs for farmers, etc.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Dhasan
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam237104699.08115177800008000080000
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)75 %00NA
(2.)90 %00NA
(3.)50 %00NA
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 2233000
(c) Utilized for Construction (in cubic meter)1071000
(d) No. of Muck Disposal sites150
(e) Total Muck Disposal Area (in hectare)150
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 13
(c) Name of the umbrella Fish Species (Scientific Name)0
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Non-Lean Non-Monsoon5.64100
(2.)Monsoon53444
(3.)Lean5.64100
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA075
(ii)Name of the EIA Consultant R S ENVIROLINK TECHNOLOGIES PVT LTD
(iii)Address 402, BESTECH CHAMBERS COMMERCIAL PLAZA, B BLOCK SUSHANT LOK PHASE I
(iv)Mobile No. 9810136853
(v)Landline No. 0124429538
(vi)Email Id ravi@rstechnologies.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 15 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterStage I FC enclosed 03 Jan 2022
2.NAPlease submit the Stage - I FC for further processing in the Ministry. 20 Dec 2021
3. ADS Reply LetterAdditional details sought are enclosed. 09 Aug 2019
4.NA

Deferred

06 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVinod Kumar Sharma
DesignationEE
Name of Company (Applicant Name should not be given here)Madhya Pradesh Water Resources Department
AddressO/o Chief Engineer Dhasan Ken Basin Water Resources Deptt. Opposite Forest Office Gate Tili Road Sagar