S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Expansion of Sugarcane crushing capacity from 9000 TCD to 15000TCD, Distillery capacity from 60 KLPD to 90 KLPD (Rectified Spirit/ENA/Ethanol) and establishment of 21 + 5 MW Co-generation pow
(b)Name of the Company / Organisation SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED
(c)Registered Address Shree Datta SSSK Limited,A/p Dattanagar, Tal. Shirol, Dist. Kolhapur, Maharashtra,Kolhapur,Maharashtra-416120
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Mahadev Vitthal Patil
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Shree Datta SSSK Limited,A/p. Dattanagar, Tal. Shirol, Dist. Kolhapur, Maharashtra 416120,,Kolhapur,Maharashtra-416120
(d)Pin code 416120
(e)E-mail vishwajitshinde1@gmail.com
(f)STD Code. 2322(f)Telephone No. 236551
(g)Fax No. 02322236600
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
5(j) Sugar Industry
Minor Activity1(d) Thermal Power Plants
(b)Category A
(c)Proposal Number IA/MH/IND2/108142/2019
(d)Master Proposal Number(Single Window) SW/108141/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Agar bagh- 343 to 352, 354, 361 shirol- 251, 252,
(b)Pincode 416120
(c)Bounded Latitudes (North)
From
Degree 16.75
Minutes
Second
From
Degree 16.76
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 74.58
Minutes
Second
From
Degree 74.585
Minutes
Second
(e)Survey of India Topo Sheet No. E43U10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 542
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 4
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. NA
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jun 15 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Industrial Alcohol603090Kilo Litre per Day(KLD)Road
(2.)Cogeneration Power02626Mega Watt(MW)Road
(3.)Sugar337502475058500OthersMT/MRoad
(4.)Ethanol306090Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery Unit60 KLPD30 KLPD90 KLPDNone
(2.)Sugar Unit9000600015000Tons Crushing per Day (TCD)
(3.)Co-generation Power Plant0 MW21 + 5 MW26 MW21 MW based on Bagasse fired boiler and 5 MW from Incinerator boiler
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Mar 2019
(iv)Valid Upto 31 Aug 2019
(v)File No. Format-1.0/BO/CAC-CELL/UAN No. 0000051668/R/CAC-19
(vi)Application No. 0000051668 and 0000035202
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 270.23
(b) Funds Allocated for Environment Management (Capital) (in Crores) 35.50
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.03
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.04
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 15000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 15000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Molasses as raw material for distillery99642.86Tons per AnnumOwnRoad,Pipe Conveyor0 CaptiveCopy of Linkage
(2.)Coal14256Tons per AnnumLocalRoad50 Open MarketCopy of Linkage
(3.)Bagasse3313200Tons per AnnumownRoad0 CaptiveCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 15 To 8
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface408.273Copy of Permission LetterPipelineJack WellKOPAV(U)/Sinchan-5/8768/201830 Oct 20181179.17
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sugar and Co-generation Effluent9001000primary treatment as an anaerobic filter and for secondary treatment MBBR media shall be installed in the existing aeration tank, Sludge drying bed followed by clarifier followed by sand and Activated charcoal filterOthersOn land for irrigation0900
(2.)Spraypond Overflow15001500Primary and secondary treatmentOthersOn land for irrigation01500
(3.)Spentwash from 60 KLPD Distillery160200MEE followed by Incineration boilerOthersZero Liquid Discharge1600
(4.)Spentwash from 30 KLPD Distillery80100MEE followed by CompostingOthersZero Liquid Discharge800
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2640
(b)Total Discharged Water (Kilolitre per Day) 2400
(c)Total Reused Water (Kilolitre per Day) 240
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Incinerator boiler ashIndustrial Waste6415Tons0RoadOthersTreated in composting
(2.)Bagasse fired boiler ashIndustrial Waste4700Tons0RoadOthersSold to brick Manufacturers
(3.)PressmudIndustrial Waste108750Tons0RoadOthersTreated in composting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube762.40.0276.021100
(2.)PM2.5Microgram per Meter Cube482.40.0248.02160
(3.)NOxMicrogram per Meter Cube402.50.3940.39180
(4.)SO2Microgram per Meter Cube182.50.2218.22180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Co-generation StackBagasse704PM101.627
(2.)Incinerator BoilrConc. Spentwash and Coal704SO27.14
(3.)Co-generation StackBagasse704SO26.486
(4.)Co-generation StackBagasse704NOx6.054
(5.)Incinerator BoilerConc. Spentwash and Coal704PM101.575
(6.)Incinerator boilerConc. Spentwash and Coal704NOx6.663
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 18700
(b)Source Captive
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1*500 KVA
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 85.46
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 85.46
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 20637.27
(b)Waste/Barren Land (ha.) 570.83
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 341.19
(e)Settlements (ha.) 2229.57
(f)Industrial (ha.) 2101
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Un-irrigated agriculture 5520.14
    Total (ha.) 31400
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt29.64
(2.)Water Reservoir1.5Water storage and rainwater harvesting
(3.)Desalination Plant13ETP and composting
(4.)Safety Zone6.23Vacant Land
(5.)Quarry Area12.98Internal Roads and Parking
(6.)Built Up Area22.11Sugar co-generation and distillery plant
Total (ha.) 85.46
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANot Applicable0No NPAs within 10 Km radius of the factory site
(2.)Wildlife CorridorsNot Applicable0No wildlife corridors within 10 Km radius of the factory site
(3.)Critically Polluted AreaNot Applicable0No critically polluted area within 10 Km radius of the factory site
(4.)ESAsNot Applicable0No ESAs within 10 Km radius of the factory site
(5.)WLSNot Applicable0No WLS within 10 Km radius of the factory site
(6.)CorridorsNot Applicable0No corridors within 10 Km radius of the factory site
(7.)ESZsNot Applicable0No ESZs within 10 Km radius of the factory site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0No forest area within 10 Km radius of the factory site
(2.)Defence InstallationsNot Applicable0No Defence installations within 10 Km radius of the factory site
(3.)Archaeological SitesNot Applicable0No Archaeological Sites within 10 Km radius of the factory site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Panchaganga River
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Krishna River
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 6
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 100
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt29.64029.64
(2.)Percentage of Total Project Area33033
(3.)No. of Plants44500200046500
(4.)Funds Allocated500000010000006000000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalThe blending of ethanol in petrol would considerably reduce the consumption of crude oils.
(2.)SocialThe promoters of the industry have social and cultural concerns and the development of the socio-cultural activities would certainly gather momentum in this backward region of the Kolhapur District
(3.)FinancialThe industry now proposes to expand its sugar as well as distillery units to timely crush sugarcane available in command area and also to utilize additional Molasses to manufacture Ethanol which have high monetary values. This would help the economy of the industry as well as create additional employment opportunities for local people. Besides, the self-employment opportunities such as Transportation, Communication, and Restaurants could also grow in the region
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/1619/RA0057
(ii)Name of the EIA Consultant Dr. Subbarao’s Environment Center, Sangli
(iii)Address 'ARUNDHATI' BUNGALOW, OPP. SAHAYOGNAGAR,, M.S.E.B. ROAD, VISHRAMBAG, SANGLI
(iv)Mobile No. 9372109522
(v)Landline No. 0233230185
(vi)Email Id bssubbarao@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 11 Dec 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per the Ministry's Notification dated 13/6/2019, the project/activity requires appraisal/approval at the State level by the concerned SEAC/SEIAA. Please submit your proposal accordingly. 15 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantMahadev Vitthal Patil
DesignationMD
Name of Company (Applicant Name should not be given here)SHREE DATTA SHETKARI SAHAKARI SAKHAR KARKHANA LIMITED
AddressShree Datta SSSK Limited
Print