Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Development Of Greenfield ‘Jewar International Airport’ Phase I & II, Gautam Budhh Nagar, Uttar Pradesh
(b)Name of the Company / Organisation DIRECTORATE OF CIVIL AVIATION, GOVT. OF UP
(c)Registered Address Directorate of Civil Aviation, Goverment of Uttar Pradesh,Sachivalaya , Lucknow, Uttar Pradesh,,Lucknow,Uttar Pradesh-226009
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Surya Pal Gangwar
(b)Designation (Owner/ Partner/ CEO) Directorandspecialsecretary
(c)Address Directorate of Civil aviation, Goverment of Uttar Pradesh, Lucknow Airport, Lucknow,,Lucknow,Lucknow,Uttar Pradesh-226009
(d)Pin code 226009
(e)E-mail jewarairport01@gmail.com
(f)STD Code. 522(f)Telephone No. 2436504
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(a) Air ports
Minor Activity
(b)Category A
(c)Proposal Number IA/UP/MIS/74694/2018
(d)Master Proposal Number(Single Window) SW/108124/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Attached as Annexure 2.1 in Final EIA Report
(b)Pincode 203135
(c)Bounded Latitudes (North)
From
Degree 28.156
Minutes
Second
From
Degree 28.185
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 77.57
Minutes
Second
From
Degree 77.64
Minutes
Second
(e)Survey of India Topo Sheet No. 53H/8,53H/11 and 53H/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 200
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.9
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Uttar Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Uttar PradeshGautam Buddha NagarGautam Buddha Nagar
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-31/2018-IA-III
(c)Date of Apply of TOR 20 Apr 2018
(d)Date of Issue of TOR / Standard ToR 12 Jun 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :26 Oct 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :26 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0.2
Primary School, Vill Kishorepur, Jewar
State :Uttar Pradesh
District :Gautam Buddha Nagar
Tehsil :Jewar
Village :Kishorepur
83R&R compensation, Concern about Noise and Air pollutionOthersAdditional District Megistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)AirportPassenger- 68493, Aircrafts-711
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Airport1OthersNumberRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7291
(b) Funds Allocated for Environment Management (Capital) (in Crores) 106.65
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 18.78
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 17.91
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 21000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 21000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)ATF21000Kilo Litre per Daynearby marketRoad2 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 11
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)OthersCOMili Gram per Meter Cube10.40.92
(2.)PM10Micro Gram per Meter Cube281173270.6100
(3.)PM2.5Micro Gram per Meter Cube19383164.960
(4.)SO2Micro Gram per Meter Cube2582480
(5.)NOxMicro Gram per Meter Cube44204380
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l3042942501000
(2.)pHNA7.77.66.58.5
(3.)OthersSulphatemg/l8271200400
(4.)Total Hardnessmg/l405388200600
(5.)TSSmg/l0000
(6.)Fluoridemg/l0.30.1911.5
(7.)TDSmg/l119011205002000
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l125D
(2.)CODmg/l4622D
(3.)pHNA7.97.6D
(4.)DOmg/l6.55.8D
(5.)OthersTotal ColiformOthersMPN/100ml170000026000D
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))44.84155
(2.)Leq(Day)A-weighted decibels(dB(A))54.941.865
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Kilogram per hectare1072956
(2.)N(Nitrogen)Kilogram per hectare641585.5
(3.)P(Phosphorus)Kilogram per hectare5429.33
(4.)pH7.967.48
(5.)Electric ConductivityOthersmicrosiemens per Centimeter510488
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.4 To 3.35
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 13.35 To 2
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface3040.80.2Copy of Permission LetterPipelineOthersFrom Jewar Distributary Canalby Client29 May 20193040.8
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage9889.912000MBBR TechnologyReuse within the Plant & Recycling9889.9
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 9889.9
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 9889.9
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste7501.77Tons0.1RoadOthersMunicipality Dump
(2.)Horticulture wasteOthersHorticulture Waste486.91Tons0RoadOthersOrganic Converter
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube31.50474505.5180
(2.)SO2Microgram per Meter Cube2206284.180
(3.)Others(Specify)COMicrogram per Meter Cube0.80739739.92000
(4.)PM10NA0000.0010
(5.)PM2.5NA0000.0010
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetsLow Sulphur content Diesel300.55NOx2.87
(2.)DG SetsLow Sulphur content Diesel300.55OthersCO0.82
(3.)DG SetsLow Sulphur content Diesel300.55SO20.5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100000
(b)Source State Authority UPPTCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 6No. DG set of 2000 KVA each
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 1239.1416
(c)Government Land (ha.) 94.8584
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 1334
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1254.48
(b)Waste/Barren Land (ha.) 6.01
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 3.85
(e)Settlements (ha.) 38.6
(f)Industrial (ha.) 3.06
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open scrub 28
    Total (ha.) 1333.9999999999998
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area38.6
(2.)Water Reservoir3.85
(3.)OthersRoads and open areas1291.55
Total (ha.) 1334
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNA0NA
(2.)ESAsNA0NA
(3.)NPANA0NA
(4.)CorridorsNA0NA
(5.)Critically Polluted AreaNA0NA
(6.)ESZsNA0NA
(7.)Wildlife CorridorsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestKarauli khadar PF3.8NW direction
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
(4.)OthersForest2 forest land near Jewar Khader4SW direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 6721
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1067.2
(b)Land yet to be acquired(Ha) 266.8
(c)Status of Land acquisition if not acquired -
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 7
(b)No. of Households 4930
(c)No. of PDFs (Project Displaced Families) 3627
(d)No. of PAFs (Project Affected Families) 8971
(e)Funds Allocated for R&R(in INR) (in Lacs) 4021
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Blackbuck, Sarus Crane and Pea Fowl
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 25 lakhs per annum
(iii)Period of Implementation During Operation Phase
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Pathwaya Nala, Bajauta, Karoli minor and Kishorpur minor
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Pathwaya Nala, running north-south at east end needs diversion for the development of airport. One major distributaries; Bajauta, on the western side close to the south-west corner of the land would b
(ii)Details of Study Conducted -
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Yamuna River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 125
(b)Permanent Employment-During Operation 29000
(c)Temporary Employment- During Construction 1100
(d)Temporary Employment- During Operation 900
(e)No. of working days 365
(f)Total Manpower 31125
32.
Green Belt in Ha:
(a)Total Area of Green Belt 133.4
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 220110
(d)Funds Allocated for Plantation 24000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEasy access to the fastest way of transportation will reduce the travel time of travel and will reduce the load on the already near saturated IGI Airport. Also, the regular movement of the traveller will help in employment generation indirectly as lots of community facilities like Hotels, Markets will also be developed as per requirement. Overall it will help in economic development of the area, in turn quality of life people residing in the project region.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 0
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 0
(d)Total plot area (sqm) 0
(e)Total built up area (sqm) 0
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 1
(b)Capacity 240000
(c)No. of Recharge Pits 1
(d)Capacity 240000
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 3522 ECS
5.
Energy Saving Measures:
(a)Source/Mode -
(b)Percentage 0
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area The wastewater generation during site development
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? Yes
(b)Name of the Court High Courts
(c)Name of the Sub Court Allahabad
(d)Case No. WPIL/51312/2017
(e)Orders/Directions of the court ,if any and its relevance with the proposed project -
(f)Case Details One litigation against the project is pending in c
(g)Uploaded Court Order Copy of Court Order
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0058
(ii)Name of the EIA Consultant Greencindia Consulting Private Limited
(iii)Address 608-611, Shopprix Mall, Sector-5, Vaishali, National Capital Region, Ghaziabad- 201010 (U.P.)
(iv)Mobile No. 9891906015
(v)Landline No. 0120429653
(vi)Email Id information@greencindia.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 27 Oct 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
      Essential Detail Sought : NIL
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS Reply 04 Jan 2020
2.NA

Kindly see the final Minutes of the 42nd EAC (Infra-2) metting held during 10-12 July, 2019

26 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSurya Pal Gangwar
DesignationDirectorandspecialsecretary
Name of Company (Applicant Name should not be given here)DIRECTORATE OF CIVIL AVIATION, GOVT. OF UP
AddressDirectorate of Civil Aviation, Goverment of Uttar Pradesh,Sachivalaya , Lucknow, Uttar Pradesh