1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | MARINE SYNDICATE PVT.LTD. | (b)Name of the Company / Organisation | MARINE SYNDICATE LTD | (c)Registered Address | Neelshri Thiba palace Read
Ratnagiri i,,Ratnagiri,Maharashtra-415612 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dilip Bhatkar | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Marine Syndicate Pvt. Ltd.
Neelshri Thiba palace Road
Ratnagiri,,Ratnagiri,Ratnagiri,Maharashtra-415612 | (d)Pin code | 415612 | (e)E-mail | marinesyndicate1@gmail.com | (f)STD Code. | 2352(f)Telephone No. | 223814 | (g)Fax No. | 270232 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(b) All ship breaking yards including ship breaking units
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/MIS/27767/2015 | (d)Master Proposal Number(Single Window) | SW/108078/2019 | (e)EAC concerned (for category A Projects only) | INFRA-1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | S. No. 41 & 42, H. No. 18 & 19/1 | (b)Pincode | 415613 | (c)Bounded Latitudes (North) | | From | | Degree | 17.290526 | Minutes | | Second | | From | | Degree | 73.276691 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 17.289443 | Minutes | | Second | | From | | Degree | 73.279753 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43N3 E43N7 E43N4 E43N8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 49 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 15 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Ratnagiri | Guhagar | | (2.) | Sikkim | Mangan | Mangan | salim pakyel | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 11-17/2015-IA-III | (c)Date of Apply of TOR | 20 May 2015 | (d)Date of Issue of TOR / Standard ToR | 12 Nov 2015 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 05 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 9.5 |
| Lokshikshan Mandal Abloli, Sabhagruh,Gonbarewadi, Khodade | State : | Maharashtra | District : | Ratnagiri | Tehsil : | Guhagar | Village : | Katale |
| 150 | During the Public hearing all the people were in favor of the project. But some of the issues discussed by the by the local people related to the proposed activity such as Employment should be given t | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Ship breaking Facility | - | 10-15 Ships breaking per year | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Ship Barges breaking | 15 | Others | No | Others | SEA | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2.43 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.66 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.048 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.35 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 00 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | NA | 00 | Others | Not Applicable | -- | Others | Sea | 0 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2016 To 31 Dec 2016 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 27.8 | 20.2 | 27.3 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 62.2 | 44.2 | 61.1 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 10.6 | 8.1 | 10.2 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 15.6 | 11.9 | 15.5 | 80 | (5.) | Others | CO | Micro Gram per Meter Cube | 0.3 | 0.1 | 0.3 | 0.4 | |
14.2. No. of Ground Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.38 | 7.24 | 8.5 | 8.5 | (2.) | TDS | | | mg/l | | 234 | 222 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 198 | 185 | 200 | 600 | (4.) | Others | Total Coliform | | Others | MPN/100ml | 0 | 0 | 0 | 0 | (5.) | Fluoride | | | mg/l | | 0.0002 | 0.0001 | 1.0 | 1.5 | (6.) | Chlorides | | | mg/l | | 74.6 | 60.8 | 250 | 1000 | (7.) | TSS | | | mg/l | | 8 | 5 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 10.2 | 9.4 | B | (2.) | pH | | NA | | 8.8 | 8.5 | B | (3.) | BOD | | mg/l | | 2.8 | 2.4 | B | (4.) | DO | | mg/l | | 5.8 | 4.2 | B | |
14.4. No. of Ambient Noise monitoring locations : 5 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 53.6 | 40.3 | 55 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 42.6 | 37.1 | 45 | |
14.5. No. of Soil Sample Monitored locations : 2 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Milligram per Kilogram | | 23.4 | 9.0 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 2400 | 1600 | (3.) | K(Potassium) | Milligram per Kilogram | | 768 | 681 | (4.) | pH | | | 8.04 | 7.11 | (5.) | N(Nitrogen) | Milligram per Kilogram | | 176 | 124 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 30 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 12 To 6 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | well water +Tanker water | 10 | 5 | Not Appliacble | Pipeline | | Open Well | | NA | 22 May 2019 | 10 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | ETP (for Bilge and slop water) | 8 | 10 | Equalisation tank + Primary settling tank + Aerobic Treatment (SAFF or FAB media and fine bubble diffuser membranes)+ Final Settling Tank + Disinfection+ Multi grade Sand Filter & Activated Carbon Filter | Reuse within the Plant & Recycling | | 8 | | (2.) | STP (for Domestic sewage) | 4.3 | 10 | Phytorid technology | Reuse within the Plant & Recycling | | 4.3 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 12.3 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 12.3 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Municipal Solid Waste | Municipal Solid Waste | | 32.49 | Tons | 00 | Others | Within Premises | Others | Vermicomposting | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 00 | 00 | 00 | 001 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 62.2 | 2 | 1.5 | 63.8 | 100 | (3.) | NOx | | Microgram per Meter Cube | 00 | 00 | 00 | 0001 | 80 | (4.) | PM2.5 | | Microgram per Meter Cube | 00 | 00 | 000 | 0001 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | HSD 42 Lit/hr | 1 | 0.1 | SO2 | | 0.62 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 200 | (b)Source | MSEB | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 250kVA | (e)Stack Height (in m) | 4.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 00 | (b)Private Land (ha.) | 2.9 | (c)Government Land (ha.) | 00 | (d)Revenue Land (ha.) | 00 | (e)Other Land (ha.) | 00 | Total Land (ha.) | 2.9 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 11271 | (b)Waste/Barren Land (ha.) | 10859 | (c)Grazing/ Community Land (ha.) | 00 | (d)Surface Water Bodies (ha.) | 6194 | (e)Settlements (ha.) | 1886 | (f)Industrial (ha.) | 00 | (g)Forest (ha.) | 675 | (h)Mangroves (ha.) | 15.73 | (i)Marine Area (ha.) | 48 | (j)Others (ha.) : Fallow Land | 1131 | Total (ha.) | 32079.73 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.9 | No | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | No | 00 | NA | (2.) | ESAs | No | 00 | NA | (3.) | Critically Polluted Area | No | 00 | NA | (4.) | NPA | No | 00 | NA | (5.) | Corridors | No | 00 | NA | (6.) | ESZs | No | 00 | NA | (7.) | Wildlife Corridors | No | 00 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | No | 00 | NA | (2.) | Defence Installations | | No | 00 | NA | (3.) | Archaeological Sites | | No | 00 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2.9 | (b)Land yet to be acquired(Ha) | 00 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 00 | (b)No. of Households | 00 | (c)No. of PDFs (Project Displaced Families) | 00 | (d)No. of PAFs (Project Affected Families) | 00 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 00 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | 3 birds species and 1 butterfly species recorded in study area | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kalzondi reservoir | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 9.4 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 15 | (b)Permanent Employment-During Operation | 65 | (c)Temporary Employment- During Construction | 00 | (d)Temporary Employment- During Operation | 00 | (e)No. of working days | 150 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 1 | (b)Percentage of Total Project Area | 34.48 | (c)No. of Plants to be Planted | 350 | (d)Funds Allocated for Plantation | 350000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IB | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | There are no mangroves at the project site | (d)Area of Mangroves Land (hectare) | 0 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | Included in EIA Report | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 01 Oct 2016 | (iv)Period of Study To (EIA Terrestrial) | 31 Dec 2016 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | Included in EIA | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 01 Oct 2016 | (iv)Period of Study to (EIA Marine) | 24 Dec 2016 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | Included in EIA Report | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | Institute of Remote Sensing, Chennai | (ii)Please Specify with salient features | It is a new project of ship breaking facility by M | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IB | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | Site is abutting to HTL | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | Site is abutting to HTL | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | No | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | NA | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | NA | |
|
35. Sector Specific Details For INFRA-1 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 6 | (b)Total No. of Flats to be Build | 00 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 29030 | (e)Total built up area (sqm) | 400 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 1 | (b)Capacity | 15 | (c)No. of Recharge Pits | 00 | (d)Capacity | 00 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 2W: 16 Nos., 4W: 8 Nos, Truck: 3 nos | |
|
5. | Energy Saving Measures: | (a)Source/Mode | LEDs, Energy efficient pumps, motors etc. | (b)Percentage | 10 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/17/00427 dt 09.10.2017 | (ii)Name of the EIA Consultant | Mahabal Enviro Engineers Pvt. Ltd. | (iii)Address | Plot No.F7, Road No.21, Wagle MIDC area, Near Ashida Electronics, Thane West 400604, Maharashtra | (iv)Mobile No. | 9323058368 | (v)Landline No. | 0222171638 | (vi)Email Id | dap_24@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-1 | (ix)Validity of Accreditation | 08 Oct 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per ToR letter dated 12.11.2015 para 7 of the letter, consultants involved in preparation of EIA/EMP report after accreditation with Quality Council of India/National Accreditation Board of Education and Training (QCI/NABET) would need to include a certificate in this regard in the EIA/EMP reports prepared by them and data provided by, other Organization(s)/Laboratories including their status of approvals etc. vide notification of the MoEF dated 19.07.2013. However, no details regarding consultant has been given in Form-2. Kindly submit the same.
Also clarify that whether the project is new or expansion. As per information submitted in Form-2 project is fresh while CER plan has been submitted for brown field project. In case project is expansion, Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board is required to be submit. | 09 Sep 2019 | 2. | NA | The correction have been made as per the instruction received | 11 Sep 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | MCZMA Recommendation letter is attached | 14 Oct 2020 | 2. | NA | In this context, it is to submit that the proposal was sent to CRZ Section of this Ministry to seek their comments prior to appraisal for grant of composite EC and CRZ Clearance. The CRZ section has returned the proposal with remarks that ‘Recommendation Letter from Maharashtra CZMA is required, which is a prerequisite as per the CRZ Notification’.
It is requested to provide copy of recommendation letter of Maharashtra CZMA. | 12 Jun 2020 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Dilip Bhatkar | Designation | Director | Name of Company (Applicant Name should not be given here) | MARINE SYNDICATE LTD | Address | Neelshri Thiba palace Read
Ratnagiri |
|