1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Animesh Ispat Private Limited | (b)Name of the Company / Organisation | MAHENDRA STRIPS PRIVATE LIMITED | (c)Registered Address | A Block, 2nd Floor, Maruti Business Park, Raipur,,Raipur,Chhattisgarh-492001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Manoj Agrawal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | A-Block, 2nd Floor, Maruti Business Park, GE Road, Raipur, Chhattisgarh,,Raipur,Raipur,Chhattisgarh-492001 | (d)Pin code | 492001 | (e)E-mail | csmanish@mahendragroup.net | (f)STD Code. | 771(f)Telephone No. | 4065800 | (g)Fax No. | 4065666 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/IND/107824/2017 | (d)Master Proposal Number(Single Window) | SW/107822/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 574, 575, 577, 578, 579, 580, 581, 582, 583 & 583/ | (b)Pincode | 493332 | (c)Bounded Latitudes (North) | | From | | Degree | 21.74703889 | Minutes | | Second | | From | | Degree | 21.75069444 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 82.17666667 | Minutes | | Second | | From | | Degree | 82.17833333 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64 K-2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 240 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.5 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/420/2017-IA.II(I) | (c)Date of Issue of TOR | 19 Sep 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 22 Jul 2019 | (c)Date of Issue of EC | 29 Jan 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 04 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 1.34 |
| Ground of High School, Khajuri Village | State : | Chhattisgarh | District : | Balodabazar | Tehsil : | Baloda Bazar | Village : | Khajuri |
| 100 | Pollution, Socio economic activities, Employment etc. | Others | Additional Collectorate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | 464/RO/Tech/CECB/2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 1 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Induction Furnace | 0 | 180000 | 180000 | Tons per Annum(TPA) | | Road,Rail | | (2.) | Rolling Mill | 0 | 175000 | 175000 | Tons per Annum(TPA) | | Road,Rail | | (3.) | Power Plant FBC | 0 | 10 | 10 | Mega Watt(MW) | | Others | through power cables | (4.) | Sponge Iron | 0 | 105000 | 105000 | Tons per Annum(TPA) | | Road,Rail | | (5.) | Power Plant WHRB | 0 | 10 | 10 | Mega Watt(MW) | | Others | through power cables | (6.) | Power Plant Biomass based | 10 | 0 | 10 | Mega Watt(MW) | | Others | through power cables | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | WHRB based Power Plant | 0 | 10 MW | 10 MW | | (2.) | Biomass based Power Plant | 10 | 0 | 10 MW | existing plant obtained consent prior to 2006 | (3.) | Induction Furnace | 0 | 4 x 15 T | 4 x 15 T | | (4.) | FBC based Power Plant | 0 | 10 MW | 10 MW | | (5.) | Rolling Mill | 0 | 1 x 500 TPD | 1 x 500 TPD | | (6.) | DRI Kilns | 0 | 1 x 350 TPD | 1 x 350 TPD | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Mar 2018 | (iv)Valid Upto | 31 Dec 2019 | (v)File No. | 6805/TS/CECB/2018 | (vi)Application No. | 526432 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 160 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 160 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 30 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 168000 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 168000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Iron ore | 168000 | Tons per Annum | | Barbil, Orissa NMDC, Chhattisgarh | Road,Rail | | 500 | MoU | | Copy of Linkage | (2.) | Imported Coal | 151460 | Tons per Annum | | Indonesia / South Africa / Australia | Road,Rail | | 600 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 35.2 | 19.2 | 35.2 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 58.2 | 33.6 | 58.2 | 100 | (3.) | SO2 | | Micro Gram per Meter Cube | 12.3 | 7.6 | 12.3 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 11.8 | 7.4 | 11.8 | 100 | (5.) | Others | CO | Micro Gram per Meter Cube | 650 | 350 | 650 | 2000 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.6 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 1.3 | 0.9 | 1.0 | 1.5 | (3.) | Total Hardness | | | mg/l | | 255 | 145 | 300 | 600 | (4.) | TDS | | | mg/l | | 435 | 274 | 500 | 2000 | (5.) | Chlorides | | | mg/l | | 225 | 132 | 250 | 1000 | (6.) | Fluoride | | | mg/l | | 0.49 | 0.31 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 2.9 | 1.5 | A | (2.) | DO | | mg/l | | 6.2 | 4.1 | A | (3.) | Others | Sulphates | mg/l | | 121 | 85 | A | (4.) | COD | | mg/l | | 6.2 | 3.5 | A | (5.) | pH | | NA | | 7.7 | 7.2 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 60 | 31 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 65 | 40 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | | | 7.5 | 7.1 | (2.) | K(Potassium) | Kilogram per hectare | | 101 | 58 | (3.) | N(Nitrogen) | Kilogram per hectare | | 222 | 114 | (4.) | P(Phosphorus) | Kilogram per hectare | | 37 | 22 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 193 | 136 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 18.5 To 4.0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.0 To 9.1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 640 | 3.5 | Copy of Permission Letter | Pipeline | | Intake Well | | 2372/State/2018/Kasdol | 27 Jun 2018 | 767 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | From Power Plant | 76 | 76 | ETP | Reuse within the Plant & Recycling,Others | Greenbelt development | 76 | 0 | (2.) | Sanitary waste water | 8 | 8 | Septic Tank | Others | Septic Tank | 8 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 84 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 84 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Slag from SiMn | Industrial Waste | | 37.5 | Tons | 50 | Road | | Others | given to road constr. | (2.) | Slag from FeMn | Industrial Waste | | 30 | Tons | 100 | Road | | Others | reused in SiMn manf. | (3.) | Ash from Power | Fly Ash | | 84 | Tons | 100 | Road | | Others | given to Cement plant & brick manf. | (4.) | Kiln Accretion Slag | Industrial Waste | | 4.0 | Tons | 50 | Road | | Others | given to road constr. & Brick manf. | (5.) | SMS slag | Industrial Waste | | 60 | Tons | 100 | Road | | Others | given to road constr. & Brick manf. | (6.) | Mill Scales | Industrial Waste | | 30 | Tons | 0 | Road | | Others | reused in SMS | (7.) | Dolochar | Industrial Waste | | 105 | Tons | 0 | Road | | Others | resued in FBC Power Plant | (8.) | Ash from DRI | Fly Ash | | 63 | Tons | 100 | Road | | Others | given to cement plant | (9.) | Wet scrapper sludge | Industrial Waste | | 16 | Tons | 50 | Road | | Others | given to road constr. & Brick manf. | (10.) | Slag from FeSi | Industrial Waste | | 0.8 | Tons | 100 | Road | | Others | given to cast iron foundaries | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 35.2 | 1300 | 2.1 | 37.4 | 60 | (2.) | PM10 | | Microgram per Meter Cube | 58.2 | 1300 | 4.2 | 62.5 | 100 | (3.) | SO2 | | Microgram per Meter Cube | 12.3 | 1300 | 13.2 | 25.6 | 80 | (4.) | NOx | | Microgram per Meter Cube | 11.8 | 1300 | 16.2 | 28.1 | 80 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 650 | 1300 | 3.8 | 653.9 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Induction Furnace | Electricity | 30 | 1.0 | PM10 | | 0.5 (per flue) | (2.) | FBC Power Plant | Coal | 63 | 1.5 | PM10 | | 0.6 | (3.) | Induction Furnace | Electricity | 30 | 1.0 | NOx | | 1.0 (per flue) | (4.) | DRI Kiln | Coal | 84 | 2.4 | PM10 | | 2.45 | (5.) | Rolling Mill | Producer Gas | 56 | 1.0 | PM10 | | 0.6 | (6.) | Rolling Mill | Producer Gas | 56 | 1.0 | NOx | | 1.8 | (7.) | FBC Power Plant | Coal | 63 | 1.5 | NOx | | 2.05 | (8.) | Rolling Mill | Producer Gas | 56 | 1.0 | SO2 | | 27.1 | (9.) | Ferro Alloys | Electricity | 30 | 1.2 | PM10 | | 0.6 | (10.) | Ferro Alloys | Electricity | 30 | 1.2 | NOx | | 6.0 | (11.) | FBC Power Plant | Coal | 63 | 1.5 | SO2 | | 41.7 | (12.) | DRI Kiln | Coal | 84 | 2.4 | SO2 | | 105.3 | (13.) | DRI Kiln | Coal | 84 | 2.4 | NOx | | 9.8 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 30000 | (b)Source | Captiver Power Plant | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 500 | (e)Stack Height (in m) | 7 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.949 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.949 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22859.2 | (b)Waste/Barren Land (ha.) | 1004.8 | (c)Grazing/ Community Land (ha.) | 2323.6 | (d)Surface Water Bodies (ha.) | 2355 | (e)Settlements (ha.) | 910.6 | (f)Industrial (ha.) | 376.8 | (g)Forest (ha.) | 1224.6 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Mining area | 345.4 | Total (ha.) | 31399.999999999996 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 4.000 | | (2.) | Green belt | | 3.319 | | (3.) | Water Reservoir | | 0.202 | | (4.) | Built Up Area | | 1.821 | Storage areas | (5.) | Others | Misc. area | 0.607 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | Nil within 10 Km. radius | (2.) | Corridors | NA | 0 | Nil within 10 Km. radius | (3.) | WLS | NA | 0 | Nil within 10 Km. radius | (4.) | NPA | NA | 0 | Nil within 10 Km. radius | (5.) | ESAs | NA | 0 | Nil within 10 Km. radius | (6.) | ESZs | NA | 0 | Nil within 10 Km. radius | (7.) | Wildlife Corridors | NA | 0 | Nil within 10 Km. radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Sonbarsa RF | 3.1 | Reserve Forest | (2.) | Defence Installations | | NA | 0 | Nil within 10 Km. radius | (3.) | Archaeological Sites | | NA | 0 | Nil within 10 Km. radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 9.949 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | total land is in possession | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Shivnath river | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 2.5 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 80 | (c)Temporary Employment- During Construction | 500 | (d)Temporary Employment- During Operation | 120 | (e)No. of working days | 300 | (f)Total Manpower | 700 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 3.319 | 0 | 3.319 | (2.) | Percentage of Total Project Area | 33.3 | 0 | 33.3 | (3.) | No. of Plants | 5000 | 0 | 5000 | (4.) | Funds Allocated | 0 | 0 | 0 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Once the proposed activity is commissioned, the socio-economic status of the local people will improve and there by infrastructure facilities like communication systems will improve. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1619/ RA 026 | (ii)Name of the EIA Consultant | Pioneer Enviro Laboratories & Consultants Pvt. Ltd | (iii)Address | 6-3-652,7-3, Dhruvatara Apartments, Erramanzil, Somajiguda, Hyderabad | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402311427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | i. Authenticated English translation of the PH proceedings shall be furnished.
ii. Storage location for raw material, complete legends etc. may be depicted in the layout plan. | 18 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 22 Jul 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Respected Sir,
We are operating 10.0 MW Biomass based power plant at Village: Khajuri, Tehsil: Baloda Bazaar, District: Baloda Bazaar, Chhattisgarh. As a part of expansion, it is proposed to establish 1 x 350 TPD DRI Kiln to manufacture 1,05,000 TPA of Sponge Iron, 4 x 15 T Induction Furnaces to manufacture 1,80,000 TPA of MS Billets, 1 x 500 TPD of Rolling Mill to manufacture 1,75,000 TPA of Structural Steel / Rolled product, 10 MW of WHRB based Power Plant, 10 MW FBC based Power Plant & 1 x 9 MVA Submerged Electric Arc Furnace to manufacture SiMn – 14,400 TPA OR FeMn – 14,400 TPA OR FeSi – 7,000 TPA by forward Integration in the existing 10 MW Biomass based power plant in the existing plant premises.
Final EIA report incorporating Public Hearing proceeding along with management compliance to the issues raised during the public hearing vide referred above.
Subsequently, proposal was considered in the 9th meeting of the Re-constituted EAC (Industry-I) held during 30-31st July, 2019. After deliberation, committee deferred the proposal for obtaining the comments / views from the District Magistrate on the proceedings of the Public Hearing for further consideration and taking appropriate view on the proposal.
Accordingly, comments / views from District Magistrate on the proceeding of the Public Hearing have been obtained. Kindly refer to Annexure – 1 for the same.
In this regard, we request your goodselves to kindly process our application and place our proposal before the Hon`ble Expert Appraisal Committee (EAC) for issue of Environmental Clearance at the earliest. | 16 Nov 2019 | 2. | NA | Proposal deferred for want of additional information | 16 Aug 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Manoj Agrawal | Designation | Director | Name of Company (Applicant Name should not be given here) | MAHENDRA STRIPS PRIVATE LIMITED | Address | A Block, 2nd Floor, Maruti Business Park, Raipur |
|