Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Animesh Ispat Private Limited
(b)Name of the Company / Organisation MAHENDRA STRIPS PRIVATE LIMITED
(c)Registered Address A Block, 2nd Floor, Maruti Business Park, Raipur,,Raipur,Chhattisgarh-492001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Manoj Agrawal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address A Block, 2nd Floor, Maruti Business Park Raipur,,Raipur,Raipur,Chhattisgarh-492001
(d)Pin code 492001
(e)E-mail csmanish@mahendragroup.net
(f)STD Code. 771(f)Telephone No. 4065800
(g)Fax No. 4065666
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/IND/107824/2017
(d)Master Proposal Number(Single Window) SW/107822/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 1
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 574, 575, 577, 578, 579, 580, 581, 582, 583 & 583/
(b)Pincode 493332
(c)Bounded Latitudes (North)
From
Degree 21.74703889
Minutes
Second
From
Degree 21.75069444
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 82.17666667
Minutes
Second
From
Degree 82.17833333
Minutes
Second
(e)Survey of India Topo Sheet No. 64 K-2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 240
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/420/2017-IA.II(I)
(c)Date of Issue of TOR 19 Sep 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 22 Jul 2019
(c)Date of Issue of EC 29 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :05 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :04 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :1.34
Ground of High School, Khajuri Village
State :Chhattisgarh
District :Balodabazar
Tehsil :Baloda Bazar
Village :Khajuri
100Pollution, Socio economic activities, Employment etc.OthersAdditional Collectorate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. 464/RO/Tech/CECB/2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit May 1 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Induction Furnace0180000180000Tons per Annum(TPA)Road,Rail
(2.)Rolling Mill0175000175000Tons per Annum(TPA)Road,Rail
(3.)Power Plant FBC01010Mega Watt(MW)Othersthrough power cables
(4.)Sponge Iron0105000105000Tons per Annum(TPA)Road,Rail
(5.)Power Plant WHRB01010Mega Watt(MW)Othersthrough power cables
(6.)Power Plant Biomass based10010Mega Watt(MW)Othersthrough power cables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)WHRB based Power Plant010 MW10 MW
(2.)Biomass based Power Plant10010 MWexisting plant obtained consent prior to 2006
(3.)Induction Furnace04 x 15 T4 x 15 T
(4.)FBC based Power Plant010 MW10 MW
(5.)Rolling Mill01 x 500 TPD1 x 500 TPD
(6.)DRI Kilns01 x 350 TPD1 x 350 TPD
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 Mar 2018
(iv)Valid Upto 31 Dec 2019
(v)File No. 6805/TS/CECB/2018
(vi)Application No. 526432
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 160
(b) Funds Allocated for Environment Management (Capital) (in Crores) 160
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 30
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 168000
(b)Existing quantity of raw material/fuel 0
(c)Total quantity of raw material/fuel 168000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Iron ore168000Tons per AnnumBarbil, Orissa NMDC, ChhattisgarhRoad,Rail500 MoUCopy of Linkage
(2.)Imported Coal151460Tons per AnnumIndonesia / South Africa / AustraliaRoad,Rail600 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 31 Dec 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube35.219.235.260
(2.)PM10Micro Gram per Meter Cube58.233.658.2100
(3.)SO2Micro Gram per Meter Cube12.37.612.380
(4.)NOxMicro Gram per Meter Cube11.87.411.8100
(5.)OthersCOMicro Gram per Meter Cube6503506502000
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.67.16.58.5
(2.)TSSmg/l1.30.91.01.5
(3.)Total Hardnessmg/l255145300600
(4.)TDSmg/l4352745002000
(5.)Chloridesmg/l2251322501000
(6.)Fluoridemg/l0.490.311.01.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.91.5A
(2.)DOmg/l6.24.1A
(3.)OthersSulphatesmg/l12185A
(4.)CODmg/l6.23.5A
(5.)pHNA7.77.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))603170
(2.)Leq(Day)A-weighted decibels(dB(A))654075
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.57.1
(2.)K(Potassium)Kilogram per hectare10158
(3.)N(Nitrogen)Kilogram per hectare222114
(4.)P(Phosphorus)Kilogram per hectare3722
(5.)Electric ConductivityMillisiemens per Centimetre193136
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 18.5 To 4.0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.0 To 9.1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface6403.5Copy of Permission LetterPipelineIntake Well2372/State/2018/Kasdol27 Jun 2018767
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)From Power Plant7676ETPReuse within the Plant & Recycling,OthersGreenbelt development760
(2.)Sanitary waste water88Septic TankOthersSeptic Tank80
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 84
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 84
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Slag from SiMnIndustrial Waste37.5Tons50RoadOthersgiven to road constr.
(2.)Slag from FeMnIndustrial Waste30Tons100RoadOthersreused in SiMn manf.
(3.)Ash from PowerFly Ash84Tons100RoadOthersgiven to Cement plant & brick manf.
(4.)Kiln Accretion SlagIndustrial Waste4.0Tons50RoadOthersgiven to road constr. & Brick manf.
(5.)SMS slagIndustrial Waste60Tons100RoadOthersgiven to road constr. & Brick manf.
(6.)Mill ScalesIndustrial Waste30Tons0RoadOthersreused in SMS
(7.)DolocharIndustrial Waste105Tons0RoadOthersresued in FBC Power Plant
(8.)Ash from DRIFly Ash63Tons100RoadOthersgiven to cement plant
(9.)Wet scrapper sludgeIndustrial Waste16Tons50RoadOthersgiven to road constr. & Brick manf.
(10.)Slag from FeSiIndustrial Waste0.8Tons100RoadOthersgiven to cast iron foundaries
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube35.213002.137.460
(2.)PM10Microgram per Meter Cube58.213004.262.5100
(3.)SO2Microgram per Meter Cube12.3130013.225.680
(4.)NOxMicrogram per Meter Cube11.8130016.228.180
(5.)Others(Specify)COMicrogram per Meter Cube65013003.8653.92000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Induction FurnaceElectricity301.0PM100.5 (per flue)
(2.)FBC Power PlantCoal631.5PM100.6
(3.)Induction FurnaceElectricity301.0NOx1.0 (per flue)
(4.)DRI KilnCoal842.4PM102.45
(5.)Rolling MillProducer Gas561.0PM100.6
(6.)Rolling MillProducer Gas561.0NOx1.8
(7.)FBC Power PlantCoal631.5NOx2.05
(8.)Rolling MillProducer Gas561.0SO227.1
(9.)Ferro AlloysElectricity301.2PM100.6
(10.)Ferro AlloysElectricity301.2NOx6.0
(11.)FBC Power PlantCoal631.5SO241.7
(12.)DRI KilnCoal842.4SO2105.3
(13.)DRI KilnCoal842.4NOx9.8
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 30000
(b)Source Captiver Power Plant
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 500
(e)Stack Height (in m) 7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 9.949
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 9.949
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22859.2
(b)Waste/Barren Land (ha.) 1004.8
(c)Grazing/ Community Land (ha.) 2323.6
(d)Surface Water Bodies (ha.) 2355
(e)Settlements (ha.) 910.6
(f)Industrial (ha.) 376.8
(g)Forest (ha.) 1224.6
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Mining area 345.4
    Total (ha.) 31399.999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.000
(2.)Green belt3.319
(3.)Water Reservoir0.202
(4.)Built Up Area1.821Storage areas
(5.)OthersMisc. area0.607
Total (ha.) 9.949
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0Nil within 10 Km. radius
(2.)CorridorsNA0Nil within 10 Km. radius
(3.)WLSNA0Nil within 10 Km. radius
(4.)NPANA0Nil within 10 Km. radius
(5.)ESAsNA0Nil within 10 Km. radius
(6.)ESZsNA0Nil within 10 Km. radius
(7.)Wildlife CorridorsNA0Nil within 10 Km. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestSonbarsa RF3.1Reserve Forest
(2.)Defence InstallationsNA0Nil within 10 Km. radius
(3.)Archaeological SitesNA0Nil within 10 Km. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 9.949
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land is in possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Shivnath river
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 2.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 80
(c)Temporary Employment- During Construction 500
(d)Temporary Employment- During Operation 120
(e)No. of working days 300
(f)Total Manpower 700
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.31903.319
(2.)Percentage of Total Project Area33.3033.3
(3.)No. of Plants500005000
(4.)Funds Allocated000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialOnce the proposed activity is commissioned, the socio-economic status of the local people will improve and there by infrastructure facilities like communication systems will improve.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA Consultant Pioneer Enviro Laboratories & Consultants Pvt. Ltd
(iii)Address 6-3-652,7-3, Dhruvatara Apartments, Erramanzil, Somajiguda, Hyderabad
(iv)Mobile No. 9440677333
(v)Landline No. 0402311427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAi. Authenticated English translation of the PH proceedings shall be furnished. ii. Storage location for raw material, complete legends etc. may be depicted in the layout plan. 18 Jun 2019
2.NAThe correction have been made as per the instruction received 22 Jul 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterRespected Sir, We are operating 10.0 MW Biomass based power plant at Village: Khajuri, Tehsil: Baloda Bazaar, District: Baloda Bazaar, Chhattisgarh. As a part of expansion, it is proposed to establish 1 x 350 TPD DRI Kiln to manufacture 1,05,000 TPA of Sponge Iron, 4 x 15 T Induction Furnaces to manufacture 1,80,000 TPA of MS Billets, 1 x 500 TPD of Rolling Mill to manufacture 1,75,000 TPA of Structural Steel / Rolled product, 10 MW of WHRB based Power Plant, 10 MW FBC based Power Plant & 1 x 9 MVA Submerged Electric Arc Furnace to manufacture SiMn – 14,400 TPA OR FeMn – 14,400 TPA OR FeSi – 7,000 TPA by forward Integration in the existing 10 MW Biomass based power plant in the existing plant premises. Final EIA report incorporating Public Hearing proceeding along with management compliance to the issues raised during the public hearing vide referred above. Subsequently, proposal was considered in the 9th meeting of the Re-constituted EAC (Industry-I) held during 30-31st July, 2019. After deliberation, committee deferred the proposal for obtaining the comments / views from the District Magistrate on the proceedings of the Public Hearing for further consideration and taking appropriate view on the proposal. Accordingly, comments / views from District Magistrate on the proceeding of the Public Hearing have been obtained. Kindly refer to Annexure – 1 for the same. In this regard, we request your goodselves to kindly process our application and place our proposal before the Hon`ble Expert Appraisal Committee (EAC) for issue of Environmental Clearance at the earliest. 16 Nov 2019
2.NA

Proposal deferred for want of additional information

16 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantManoj Agrawal
DesignationDirector
Name of Company (Applicant Name should not be given here)MAHENDRA STRIPS PRIVATE LIMITED
AddressA Block, 2nd Floor, Maruti Business Park, Raipur