Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed Hotel
(b)Name of the Company / Organisation BREEZE CONSTRUCTION PVT. LTD.
(c)Registered Address DLF Center, Sansad Marg, New Delhi-110001,,New Delhi,Delhi-110001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kamal Sadana
(b)Designation (Owner/ Partner/ CEO) GeneralManager
(c)Address DLF Center, Sansad Marg, New Delhi-110001,,Connaught Place,New Delhi,Delhi-110001
(d)Pin code 110001
(e)E-mail ksadana26@gmail.com
(f)STD Code. 11(f)Telephone No. 42102213
(g)Fax No. 42102030
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity8(a) Building and Construction projects
Minor Activity8(a) Building and Construction projects
(b)Category B2
   Reason for Applying at Ministry SEIAA
(c)Proposal Number IA/DL/MIS/107764/2019
(d)Master Proposal Number(Single Window) SW/107761/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No.1 B-4
(b)Pincode 110085
(c)Bounded Latitudes (North)
From
Degree 3178421.62
Minutes
Second
From
Degree 3178510.78
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 706358.98
Minutes
Second
From
Degree 706455.15
Minutes
Second
(e)Survey of India Topo Sheet No. 53 H/02
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 221
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.96
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Delhi
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application No
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Since it is a Building/Construction project (item
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)No. of Rooms in Hotel200
(2.)No. of Banquets2
(3.)No. of Blocks1
(4.)No. of Service Apartments120
(5.)No. of FloorsG+10
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Total built up area46370.6OtherssqmOthersNA
(2.)Total Plot Area5024.91OtherssqmOthersNA
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 01 May 2019
(iv)Valid Upto 01 Jun 2019
(v)File No. 0
(vi)Application No. 0
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 170
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.16
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.55
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.045
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)000OthersNA0OthersNA0 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 May 2019 To 07 May 2019
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 2
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube210.3188.1206.6100
(2.)PM2.5Micro Gram per Meter Cube122.4108.6118.660
(3.)SO2Micro Gram per Meter Cube8.46.78.180
(4.)NOxMicro Gram per Meter Cube36.131.835.480
    14.2.     No. of Ground Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Chloridesmg/l3030250250
(2.)TSSmg/l0011
(3.)Total Hardnessmg/l280280200200
(4.)Fluoridemg/l0.120.1211
(5.)TDSmg/l17301730500500
(6.)Heavy Metalsleadmg/l0.010.010.010.01
(7.)pHNA7.87.88.58.5
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.088.08D
(2.)CODmg/l480480D
(3.)BODmg/l2828D
(4.)DOmg/l3.53.5D
    14.4.     No. of Ambient Noise monitoring locations : 1
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))49.949.955
(2.)Leq(Day)A-weighted decibels(dB(A))58.258.265
    14.5.     No. of Soil Sample Monitored locations : 1
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram67.467.4
(2.)Electric ConductivityOthersMicrosiemens per centimeter129.4129.4
(3.)pH7.867.86
(4.)P(Phosphorus)Milligram per Kilogram15.115.1
(5.)K(Potassium)Milligram per Kilogram5.95.9
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.4 To 53.17
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.69 To 54.02
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersDelhi Jal Board2060.1Copy of Permission LetterPipelineOthersDelhi Jal Board0001 May 2019206
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)domestic and others252350STPReuse within the Plant & Recycling,Green Belt Renewal Plant,Otherslosses of 25 kLD22725
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 252
(b)Total Discharged Water (Kilolitre per Day) 25
(c)Total Reused Water (Kilolitre per Day) 227
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Biodegradable WasteMunicipal Solid Waste214Tons0.1Road,OthersOrganic Waste ConverterOthersOrganic Waste Converter
(2.)Non Biodegradable WasteMunicipal Solid Waste72Tons10RoadAuthorized Recyclers
(3.)E wasteE Waste0.036Tons10RoadAuthorized Recyclers
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.504Tons10RoadAuthorized Recyclers
(5.)Plastic WastePlastic Waste72Tons10RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube120.50.80.192120.69360
(2.)SO2Microgram per Meter Cube8.250.80.1928.44380
(3.)PM10Microgram per Meter Cube208.350.80.242208.592100
(4.)NOxMicrogram per Meter Cube35.750.80.72736.47880
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)3x 2000Low Sulphur Diesel52.70.65PM100.034
(2.)3x 2000Low Sulphur Diesel52.70.65NOx0.228
(3.)3x 2000Low Sulphur Diesel52.70.65SO20.12
(4.)3X 2000Low Sulphur Diesel52.70.65OthersPM 2.50.013
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4444.44
(b)Source BSES
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 3x 2000
(e)Stack Height (in m) 52.7
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.50249
    Total Land (ha.) 0.50249
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : total plot area 0.50249
    Total (ha.) 0.50249
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersPlot Area0.50249
Total (ha.) 0.50249
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANone0NA
(2.)ESAsNone0NA
(3.)Wildlife CorridorsNone0NA
(4.)CorridorsNone0NA
(5.)WLSNone0NA
(6.)Critically Polluted AreaWazirpur Critically Polluted Area5.06SE direction of project site
(7.)ESZsNone0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesSalimgarh Fort14.20SE direction of project site
(2.)Defence InstallationsNone0NA
(3.)ForestNorthern Ridge Reserve Forest10.40SE direction of project site
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.50249
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Japanese Park Lake
(ii)Direction of Water Bodies in Buffer Area North East
(iii)Distance of Water Bodies in Buffer Area 0.43
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 750
(d)Temporary Employment- During Operation 287
(e)No. of working days 365
(f)Total Manpower 1037
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.050249
(b)Percentage of Total Project Area 10.00
(c)No. of Plants to be Planted 63
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment will be generated.
(2.)FinancialRevenue will be generated
(3.)Environmental502.49 sqm (10% of plot area) will be developed as green area which will reduce the pollution load in the area.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 70
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 1
(d)Total plot area (sqm) 5024.91
(e)Total built up area (sqm) 46370.6
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 1
(d)Capacity 118
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 266
5.
Energy Saving Measures:
(a)Source/Mode Solar & LED
(b)Percentage 1
(c)Quantity 44.44
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area There will be no extraction of ground water
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Rev. 76, 6th May 2019, Serial No. 119
(ii)Name of the EIA Consultant Perfact Enviro Solutions Pvt. Ltd
(iii)Address 5th Floor, NN Mall , Mangalam Palace, Sector-3, Rohini, New Delhi
(iv)Mobile No. 9818362330
(v)Landline No. 0114928136
(vi)Email Id info@perfactgroup.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 21 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NASince, the project was earlier granted environmental clearance for the development of Hotel vide letter no. 21- 1218/2007-IA.III dated 16.04.2008 for plot area of 5024.9 m2 and built up area of 29884.21 m2, Kindly submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for consideration of the proposal. 24 Jun 2019
2.NAThe correction have been made as per the instruction received 02 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKamal Sadana
DesignationGeneralManager
Name of Company (Applicant Name should not be given here)BREEZE CONSTRUCTION PVT. LTD.
AddressDLF Center, Sansad Marg, New Delhi-110001