Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Environmental Clearance for Proposed Construction of 4 x 500 MT Capacity LPG Bottling Plant at Plot No E-1/7, Chavane Village, Rasayani, Patalganga, Panvel, District: Raigad, Maharashtra
(b)Name of the Company / Organisation HPCL RASAYANI
(c)Registered Address Hindustan Bhavan, HPCL, 8 SV Marg, Ballard Estate, Mumbai,,Raigad,Maharashtra-400001
(d)Legal Status of the Company Central PSU
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Venu Madhav
(b)Designation (Owner/ Partner/ CEO) Manager
(c)Address Hindustan Bhavan, 8 SV Marg, Ballard Estate, Mumbai,,Mumbai,Mumbai City,Maharashtra-400001
(d)Pin code 400001
(e)E-mail venumadhav@hpcl.in
(f)STD Code. 22(f)Telephone No. 22637072
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity6(b)Isolated storage & handling of hazardous chemicals (As per threshold planning
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/107647/2019
(d)Master Proposal Number(Single Window) SW/107638/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Plot No E-1/7, Chavane Village, Rasayani, Patalga
(b)Pincode 410220
(c)Bounded Latitudes (North)
From
Degree 18.51019
Minutes
Second
From
Degree 18.511878
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.94513
Minutes
Second
From
Degree 73.9579
Minutes
Second
(e)Survey of India Topo Sheet No. E43H1, E43H5
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 12
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/218/2018-IA-II(I)
(b)Date of Apply of TOR 21 Feb 2019
(c)Date of Issue of TOR / Standard ToR 28 Mar 2019
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason The project is located in Maharashtra Industrial
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)LPG Storage facility180 TMTPA180 TMTPA
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)LPG Storage2000OthersMetric toneOthersPipeline /road
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 Jun 2019
(iv)Valid Upto 10 Jun 2019
(v)File No. NA
(vi)Application No. No CTO obtained as this is new Project
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 249.26
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.315
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.73
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.11
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 00
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)LPG00Tons per AnnumNot applicableRoad00 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2018 To 31 Dec 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 10
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube31.414.730.960
(2.)NOxMicro Gram per Meter Cube16.38.311.980
(3.)PM10Micro Gram per Meter Cube57.131.757.1100
(4.)SO2Micro Gram per Meter Cube7.65580
    14.2.     No. of Ground Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TSSmg/l2112
(2.)TDSmg/l4251965002000
(3.)Chloridesmg/l18432250100
(4.)Fluoridemg/l0.850.131.01.5
(5.)Heavy MetalsZincmg/l0.100.05515
(6.)pHNA7.616.616.58.5
(7.)Total Hardnessmg/l192116200600
    14.3.     No. of Surface Water monitoring locations : 4
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l7.76.9C
(2.)CODmg/l143.6C
(3.)pHNA8.057.97C
(4.)BODmg/l2.62.3C
    14.4.     No. of Ambient Noise monitoring locations : 10
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))47.942.275
(2.)Leq(Day)A-weighted decibels(dB(A))51.14270
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH8.217.23
(2.)K(Potassium)Kilogram per hectare402248
(3.)N(Nitrogen)Kilogram per hectare610326
(4.)Electric ConductivityMillisiemens per Centimetre1.410.063
(5.)P(Phosphorus)Kilogram per hectare51.116.6
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 3.93 To 3.93
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 2.77 To 2.77
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersFrom MIDC350Copy of Permission LetterPipelineOthersPipeline16/528/20190523/63438331 May 201935
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Domestic waste water4.84.8Septic tankGreen Belt Renewal Plant4.8
(2.)Effluent1730ETPReuse within the Plant & Recycling17
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 21.8
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 21.8
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Municipal solid wasteMunicipal Solid Waste21000Tons0RoadOthersdisposed as minicipal solid waste rule2000
(2.)Municipal solid wasteOthersconstruction phase3000Tons0RoadOthersdisposed as minicipal solid waste rule2000
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube31.40.82.07433.4880
(2.)PM10Microgram per Meter Cube57.10.82.07459.18100
(3.)NOxMicrogram per Meter Cube16.30.84.020.480
(4.)SO2Microgram per Meter Cube7.60.81.108.7180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG set 600 KVADiesel90.2PM100.0073 g/s
(2.)DG Set 600 KVADiesel90.2OthersCO0.043 g/s
(3.)DG set 250 KVADiesel80.2NOx0.15 g/s
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 100
(b)Source Maharashtra State Electricity Distribution Co. Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 600 KVA, 1 x 250 KVA
(e)Stack Height (in m) 9
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 13.99
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 13.99
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 13.99
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 13.99
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant4.04
(2.)Green belt5.01
(3.)OthersPaved area + open area4.94
Total (ha.) 13.99
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNIL0Nil within 10 km radius of study area
(2.)ESAsNIL0Nil within 10 km radius of study area
(3.)CorridorsNIL0Nil within 10 km radius of study area
(4.)Wildlife CorridorsNIL0Nil within 10 km radius of study area
(5.)NPANIL0Nil within 10 km radius of study area
(6.)WLSKarnala Bird Sanctuary1.5Karnala Bird Sanctuary (ESZ) at a distance of 1.5 KM (aerial) from the project site
(7.)ESZsKarnala Bird Sanctuary1.5Karnala Bird Sanctuary (ESZ) at a distance of 1.5 KM (aerial) from the project site
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forestnil0none in 10 km radius
(2.)Archaeological Sitesnil0none in 10 km radius
(3.)Defence Installationsnil0none in 10 km radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 2.02
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Only for approach road
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area one seasonal water stream is flowing in core area. THere is no diversion required.
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 140
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 140
32.
Green Belt in Ha:
(a)Total Area of Green Belt 5.01
(b)Percentage of Total Project Area 35.81
(c)No. of Plants to be Planted 54
(d)Funds Allocated for Plantation 100000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialThis proposed installation will generate direct and indirect employment opportunities mainly during the operation phase. Local semi-skilled and unskilled labourers will get direct employment in operation phase. This is a moderate positive impact of the proposed project.
(2.)SocialThe LPG bottling plant will create opportunities for direct and indirect employment in the area. The LPG bottling plant will initiate local economic growth and thereby the potential to enhance quality of life of the local communities. Local population are benefited due to availability of clean fuel and availability of clean fuel will be enhanced after proposed construction of LPG Bottling Plant.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0048
(ii)Name of the EIA Consultant ABC TECHNO LABS INDIA PRIVATE LIMITED
(iii)Address ABC Tower,400, 13th street, SIDCO Industrial estate, North Phase, ambattur, chennai - 600098
(iv)Mobile No. 9444260000
(v)Landline No. 0442625779
(vi)Email Id mumbai@abctechnolab.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 15 Nov 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease see the Ministry's Notification dated 13/6/2019 for omission of item 6(b) from the domain of the EIA Notification, 2006. 14 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVenu Madhav
DesignationManager
Name of Company (Applicant Name should not be given here)HPCL RASAYANI
AddressHindustan Bhavan, HPCL, 8 SV Marg, Ballard Estate, Mumbai
Print