1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Revised Master Plan Development of Dhamra Port in Bhadrak District, Odisha | (b)Name of the Company / Organisation | The Dhamra Port Company Limited | (c)Registered Address | NIL | (d)Legal Status of the Company | NIL | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | | (b)Designation (Owner/ Partner/ CEO) | AGM | (c)Address | NIL | (d)Pin code | 380009 | (e)E-mail | environment.dhamra@adani.com | (f)STD Code. | (f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/OR/MIS/107539/2009 | (d)Master Proposal Number(Single Window) | SW/107536/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Complete details are provided in Appendix C of EIA | (b)Pincode | 756171 | (c)Bounded Latitudes (North) | | From | | Degree | 230015.59 | Minutes | | Second | | From | | Degree | 2325859.88 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 491327.78 | Minutes | | Second | | From | | Degree | 527708.27 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F45U13 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 3.5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 1.6 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Orissa | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 11-104/2009-IA-III | (c)Date of Issue of TOR | 18 Dec 2009 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 24 Jun 2019 | (c)Date of Issue of EC | 15 Nov 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 11 Apr 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.5 |
| Kanak Prasad Village, Chandbali Tehsil in Bhadrak district | State : | Orissa | District : | Bhadrak | Tehsil : | Chandabali | Village : | Kanak Prasad |
| 800 | Displacement, land looser, environment pollution, roads, electricity, drinking water, dry fish ground, employment, drainage | District Magistrate | | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 101-740/EPE/463 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 12 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | multipurpose liquid gas cryogenic cargo | 99.6 | 69.9 | 169.5 | Others | MMTPA | Road,Rail,Conveyor Belt,Others | pipeline, water way etc. | (2.) | multipurpose liquid gas cryogenic cargo | 99.6 | 214.4 | 314 | Others | MMTPA | Road,Rail,Conveyor Belt,Others | pipeline, water way etc. | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Quay length | 3693 | 8057 | 11750 | RMP 30 year (2013.4 Ha.) | (2.) | Quay length | 3693 | 2339 | 6032 | RMP 5 year (2013.4 ha) | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 13 Sep 2017 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 12090 | (vi)Application No. | 1635147 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 48933 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1264.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 61.16 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 69.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 4800 | (b)Existing quantity of raw material/fuel | 200 | (c)Total quantity of raw material/fuel | 5000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 5000 | Others | LPH | Approved Supplier | Road,Rail,Pipe Conveyor,Others | pipeline and water ways etc | 3 | Linkage | | Copy of Linkage | (2.) | Cargo | 314 | Others | MMTPA | exporter and importers | Road,Rail,Conveyor Belt,Others | water ways, pipeline etc. | 1000 | Others | export and import | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 15 Sep 2017 To 27 Feb 2018 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 65.7 | 24.5 | 65.4 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 43.9 | 13.9 | 43.85 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 16.5 | 4 | 16.5 | 80 | (4.) | NOx | | Micro Gram per Meter Cube | 23.8 | 8.5 | 23.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.04 | 7.65 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 595.1 | 384.7 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 206 | 140 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 0.87 | 0.32 | 1 | 1.5 | (5.) | Others | Nitrates | | mg/l | | 19.4 | 9.9 | 45 | 45 | (6.) | TSS | | | mg/l | | 28 | 10 | 0 | 0 | (7.) | Chlorides | | | mg/l | | 88.9 | 27.4 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.07 | 7.82 | C | (2.) | DO | | mg/l | | 6.8 | 6.2 | C | (3.) | BOD | | mg/l | | 2.8 | 2.2 | C | (4.) | COD | | mg/l | | 150 | 110 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 64.7 | 62.2 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 52.6 | 50.8 | 70 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | K(Potassium) | Milliequivalents per 100 Gram | | 155 | 86 | (2.) | Electric Conductivity | Others | µMhos/cm | 7961 | 188 | (3.) | pH | | | 8.75 | 7.3 | (4.) | N(Nitrogen) | Milliequivalents per 100 Gram | | 342 | 274 | (5.) | P(Phosphorus) | Milliequivalents per 100 Gram | | 94 | 60 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.92 To 7.2 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.14 To 4.01 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Sea | | 2880000 | 0.5 | Not Appliacble | Pipeline | | Others | submerged | 01 2017 18 | 19 May 2017 | 0 | (2.) | Others | River Mathai Tidal influence | 100000 | 7.3 | Copy of Permission Letter | Pipeline | | Intake Well | | 01 2017 18 | 19 May 2017 | 5015.48 | |
|
15.1. | (a)Whether Desalination is proposed | Yes | (b)Desalination Capacity (KLD) | 40000 | (c)Quantity of Brine (KLD) | 60000 | (d)Mode of Disposal of Brine | in to the sea through pipeline | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage | 2000 | 2000 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | Operational requirments | 2000 | 0 | (2.) | Effluent | 5000 | 5000 | ETP | Discharge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 5000 | 0 | (3.) | Desalination Plant | 60000 | 60000 | nil | Others | pipeline | 0 | 60000 | (4.) | LNG/LPG Terminal | 2880000 | 0 | mil | Others | pipeline | 0 | 2880000 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2947000 | (b)Total Discharged Water (Kilolitre per Day) | 2940000 | (c)Total Reused Water (Kilolitre per Day) | 7000 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | MSW | Municipal Solid Waste | | 14.4 | Tons | 0 | Road | | Others | Organic Waste Converter and Authorized Collector | (2.) | HW | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.4 | Tons | 150 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 65.7 | 0.9 | 11.06 | 76.77 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 43.9 | 0.9 | 4.42 | 48.33 | 60 | (3.) | NOx | | Microgram per Meter Cube | 23.8 | 3.8 | 22.8 | 46.61 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 16.5 | 0.9 | 6.39 | 33.89 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | LPG Boiler | HSD | 38 | 0.4 | SO2 | | 7.64 | (2.) | ships | MDO/HSD | 18 | 0.8 | Others | PM2.5 | 0.29 | (3.) | ships | MDO/HSD | 18 | 0.8 | SO2 | | 3.57 | (4.) | ships | MDO/HSD | 18 | 0.8 | NOx | | 5.58 | (5.) | LPG Boiler | HSD | 38 | 0.4 | NOx | | 5.2 | (6.) | ships | MDO/HSD | 18 | 0.8 | PM10 | | 0.73 | (7.) | LNG/SCV | NG | 30 | 1.4 | NOx | | 2.94 | (8.) | LPG boiler | HSD | 38 | 0.4 | PM10 | | 0.34 | (9.) | LPG boiler | HSD | 38 | 0.4 | Others | PM2.5 | 0.13 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 1020000 | (b)Source | Odishapowertransmissioncorporation ltd & renewable | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 30 MVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 690 | (d)Revenue Land (ha.) | 247.7 | (e)Other Land (ha.) | 1075.7 | Total Land (ha.) | 2013.4 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 247.7 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 681 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 9 | (i)Marine Area (ha.) | 1075.7 | (j)Others (ha.) : NA | 0 | Total (ha.) | 2013.4 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1754.4 | port operational area and other utility area | (2.) | Green belt | | 258.9 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | No | 0 | NA | (2.) | WLS | Bhitarkanika & Gahirmatha | 2.2 | The revised Master plan layout is outside of the Eco-Sensitive Zone of Bhitarkanika Sanctuary & Bhitarkanika National Park and Gahirmatha Marine Sanctuary, declared as per Gazette Notification 16th Ju | (3.) | Wildlife Corridors | no | 0 | NA | (4.) | Corridors | No | 0 | na | (5.) | Critically Polluted Area | no | 0 | na | (6.) | ESZs | Bhitarkanika & Gahirmatha ESZ | 0.02 | The revised Master plan layout is outside of the Eco-Sensitive Zone of Bhitarkanika Sanctuary & Bhitarkanika National Park and Gahirmatha Marine Sanctuary, declared as per Gazette Notification 16th Ju | (7.) | NPA | Bhitarkanika National Park | 1.52 | Bhitarkanika Sanctuary & it’s a Ramsar wetland. Gahirmath Marine Sanctuary | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Others | Ramsar wetland | Bhitarkanika | 2.2 | distance from Project | (2.) | Forest | | Garmal Forest | 1.2 | Kalibhanjdian RF (3.0 km), Kantiakhai PF (3.3 km) Kanika Sand Forest (1.7 km) Bagulida RF (Proposed) (9.9 km), Suneirupei PF (10.0 km) and Katiakhal RF(3.1 km) | (3.) | Archaeological Sites | | nil | 0 | na | (4.) | Defence Installations | | NA | 0 | Integrated Test Range (ITR) of DRDO (at Wheeler Island @13.0 km | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 690 | (b)Land yet to be acquired(Ha) | 247.7 | (c)Status of Land acquisition if not acquired | as per concession agreement Govt of Odisha to prov | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Reclamation of Sea/Submerged area of 1075.7 Ha is proposed | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Dhamra River - 1.6 km S Matai Nadi- 8.0 km W MaipuraNadi- 9.3 km S Ranahansua River - 12.3 km S BaunsagarhNadi- 11.2 km S SatabhayaNala- 14 km S BhitraKanikaNadi- 11.8 km SW SanjogaNadi- 11.1 km SW Munda JhorNadi- 6.6 km SSW KanthiakaiNala- 5.5km S BhektaNala- 6.8 km SSW MahulJhor- 3.5 km W DosandhiJhor- 12.4 km NW SotraJhor- 4.9 km WNW GallaNadi- 12.2 km W | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 14 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 4000 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 330 | (f)Total Manpower | 4000 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 54.03 | 204.87 | 258.9 | (2.) | Percentage of Total Project Area | 2.68 | 10.17 | 12.85 | (3.) | No. of Plants | 100000 | 715000 | 815000 | (4.) | Funds Allocated | 10000000 | 720000000 | 730000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IV | (b)Location Type | Low and Medium Eroding Coast | (c)Details of Mangroves Land Involved, if Any | mangrove excluded. only north side utility corrido | (d)Area of Mangroves Land (hectare) | | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | CEIA cover MarineTerrestrial&Social environment ca | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 15 Sep 2017 | (iv)Period of Study To (EIA Terrestrial) | 18 Feb 2018 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | CEIA cover MarineTerrestrial&Social environment ca | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 17 Sep 2017 | (iv)Period of Study to (EIA Marine) | 18 Feb 2018 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | DMP OSCP covered in CEIA | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Others | (i)Agency Name for Preparing CRZ Maps | National Institute of Oceanography (NIO) | (ii)Please Specify with salient features | Project falls underCRZI(A),I(B),III, IV(A) | (iii)Uploaded relevent Document | Copy of relevent Document | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IV | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 0 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 0 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | Yes | (i)Uploaded Maps (Shape File) | Copy of Maps | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | Yes | (i)Uploaded Maps (kml File) | Copy of Maps | (f)NOC from State Pollution Control Boards Obtained | Yes | (i)Copy of NOC | Copy of NOC | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | NO | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | - | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 14 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 22 | (d)Total plot area (sqm) | 20134000 | (e)Total built up area (sqm) | 92840 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Multipurpose (including Liquid) - Coal / Iron ore | (d)Quantity of Cargo | 314 | (e)Control Measures of Cargo | Necessary design considerations, safety and mitig | (f)Dust Control Measures | Adequate pollution control measures will be taken | (g)Quantum | 0 | (h)Quantity of Dredging (Cubic meter per day) | 185 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | 20 MCM maintenance dredging material | (k)Details of Outfall Diffusers | LNG/LPG FSRU/FSO & desal reject | (l)No. of Dilution Expected | 0 | (m)Distance at which the Outlet will Reach Ambient Parameters | 600 | (n)Details of Monitoring at Outfall | Monitoring plan as mentioned in CEIA | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | Parking facilities is considered as a part of Revi | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar/Wind | (b)Percentage | 5 | (c)Quantity | 43 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/ENV/ACO/18/0810 | (ii)Name of the EIA Consultant | L&T Infrastructure Engineering Limited | (iii)Address | 6-3-1192/1/1, 5th Floor, Block No.3, White House, Kundan Bagh, Begumpet, Hyderabad – 500 016 | (iv)Mobile No. | 9491035051 | (v)Landline No. | 0404035443 | (vi)Email Id | cvs@lntiel.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 09 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per ToR condition recommendation from Odisha Coastal Zone Management Authority (OCZMA) are required. The same has not been submitted. Kindly submit the same. | 24 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 24 Jun 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | | Designation | AGM | Name of Company (Applicant Name should not be given here) | The Dhamra Port Company Limited | Address | The Dhamra Port Company Ltd,
Fortune Towers, 2nd Floor,
Chandrashekharpur, Bhubaneswar - 751023 |
|