Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Revised Master Plan Development of Dhamra Port in Bhadrak District, Odisha
(b)Name of the Company / Organisation The Dhamra Port Company Limited
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant
(b)Designation (Owner/ Partner/ CEO) AGM
(c)Address NIL
(d)Pin code 380009
(e)E-mail environment.dhamra@adani.com
(f)STD Code. (f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/MIS/107539/2009
(d)Master Proposal Number(Single Window) SW/107536/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Complete details are provided in Appendix C of EIA
(b)Pincode 756171
(c)Bounded Latitudes (North)
From
Degree 230015.59
Minutes
Second
From
Degree 2325859.88
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 491327.78
Minutes
Second
From
Degree 527708.27
Minutes
Second
(e)Survey of India Topo Sheet No. F45U13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 3.5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.6
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number 11-104/2009-IA-III
(c)Date of Issue of TOR 18 Dec 2009
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 24 Jun 2019
(c)Date of Issue of EC 15 Nov 2019
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :0.5
Kanak Prasad Village, Chandbali Tehsil in Bhadrak district
State :Orissa
District :Bhadrak
Tehsil :Chandabali
Village :Kanak Prasad
800Displacement, land looser, environment pollution, roads, electricity, drinking water, dry fish ground, employment, drainageDistrict Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 101-740/EPE/463
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Feb 12 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)multipurpose liquid gas cryogenic cargo99.669.9169.5OthersMMTPARoad,Rail,Conveyor Belt,Otherspipeline, water way etc.
(2.)multipurpose liquid gas cryogenic cargo99.6214.4314OthersMMTPARoad,Rail,Conveyor Belt,Otherspipeline, water way etc.
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Quay length3693805711750RMP 30 year (2013.4 Ha.)
(2.)Quay length369323396032RMP 5 year (2013.4 ha)
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 13 Sep 2017
(iv)Valid Upto 31 Mar 2020
(v)File No. 12090
(vi)Application No. 1635147
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 48933
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1264.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 61.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 69.5
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 4800
(b)Existing quantity of raw material/fuel 200
(c)Total quantity of raw material/fuel 5000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)HSD5000OthersLPHApproved SupplierRoad,Rail,Pipe Conveyor,Otherspipeline and water ways etc3 LinkageCopy of Linkage
(2.)Cargo314OthersMMTPAexporter and importersRoad,Rail,Conveyor Belt,Otherswater ways, pipeline etc.1000 Othersexport and importCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 15 Sep 2017 To 27 Feb 2018
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube65.724.565.4100
(2.)PM2.5Micro Gram per Meter Cube43.913.943.8560
(3.)SO2Micro Gram per Meter Cube16.5416.580
(4.)NOxMicro Gram per Meter Cube23.88.523.580
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.047.656.58.5
(2.)TDSmg/l595.1384.75002000
(3.)Total Hardnessmg/l206140200600
(4.)Fluoridemg/l0.870.3211.5
(5.)OthersNitratesmg/l19.49.94545
(6.)TSSmg/l281000
(7.)Chloridesmg/l88.927.42501000
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA8.077.82C
(2.)DOmg/l6.86.2C
(3.)BODmg/l2.82.2C
(4.)CODmg/l150110C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))64.762.275
(2.)Leq(Night)A-weighted decibels(dB(A))52.650.870
    14.5.     No. of Soil Sample Monitored locations : 10
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milliequivalents per 100 Gram15586
(2.)Electric ConductivityOthersµMhos/cm7961188
(3.)pH8.757.3
(4.)N(Nitrogen)Milliequivalents per 100 Gram342274
(5.)P(Phosphorus)Milliequivalents per 100 Gram9460
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.92 To 7.2
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.14 To 4.01
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Sea28800000.5 Not Appliacble PipelineOtherssubmerged01 2017 1819 May 20170
(2.)OthersRiver Mathai Tidal influence1000007.3Copy of Permission LetterPipelineIntake Well01 2017 1819 May 20175015.48
15.1.
(a)Whether Desalination is proposed Yes
(b)Desalination Capacity (KLD) 40000
(c)Quantity of Brine (KLD) 60000
(d)Mode of Disposal of Brine in to the sea through pipeline
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage20002000STPReuse within the Plant & Recycling,Green Belt Renewal Plant,OthersOperational requirments20000
(2.)Effluent50005000ETPDischarge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant50000
(3.)Desalination Plant6000060000nilOtherspipeline060000
(4.)LNG/LPG Terminal28800000milOtherspipeline02880000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2947000
(b)Total Discharged Water (Kilolitre per Day) 2940000
(c)Total Reused Water (Kilolitre per Day) 7000
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)MSWMunicipal Solid Waste14.4Tons0RoadOthersOrganic Waste Converter and Authorized Collector
(2.)HWHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.4Tons150RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube65.70.911.0676.77100
(2.)PM2.5Microgram per Meter Cube43.90.94.4248.3360
(3.)NOxMicrogram per Meter Cube23.83.822.846.6180
(4.)SO2Microgram per Meter Cube16.50.96.3933.8980
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)LPG BoilerHSD380.4SO27.64
(2.)shipsMDO/HSD180.8OthersPM2.50.29
(3.)shipsMDO/HSD180.8SO23.57
(4.)shipsMDO/HSD180.8NOx5.58
(5.)LPG BoilerHSD380.4NOx5.2
(6.)shipsMDO/HSD180.8PM100.73
(7.)LNG/SCVNG301.4NOx2.94
(8.)LPG boilerHSD380.4PM100.34
(9.)LPG boilerHSD380.4OthersPM2.50.13
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 1020000
(b)Source Odishapowertransmissioncorporation ltd & renewable
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 30 MVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 690
(d)Revenue Land (ha.) 247.7
(e)Other Land (ha.) 1075.7
    Total Land (ha.) 2013.4
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 247.7
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 681
(g)Forest (ha.) 0
(h)Mangroves (ha.) 9
(i)Marine Area (ha.) 1075.7
(j)Others (ha.) : NA 0
    Total (ha.) 2013.4
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1754.4port operational area and other utility area
(2.)Green belt258.9
Total (ha.) 2013.3
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNo0NA
(2.)WLSBhitarkanika & Gahirmatha2.2The revised Master plan layout is outside of the Eco-Sensitive Zone of Bhitarkanika Sanctuary & Bhitarkanika National Park and Gahirmatha Marine Sanctuary, declared as per Gazette Notification 16th Ju
(3.)Wildlife Corridorsno0NA
(4.)CorridorsNo0na
(5.)Critically Polluted Areano0na
(6.)ESZsBhitarkanika & Gahirmatha ESZ0.02The revised Master plan layout is outside of the Eco-Sensitive Zone of Bhitarkanika Sanctuary & Bhitarkanika National Park and Gahirmatha Marine Sanctuary, declared as per Gazette Notification 16th Ju
(7.)NPABhitarkanika National Park1.52Bhitarkanika Sanctuary & it’s a Ramsar wetland. Gahirmath Marine Sanctuary
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)OthersRamsar wetlandBhitarkanika2.2distance from Project
(2.)ForestGarmal Forest1.2Kalibhanjdian RF (3.0 km), Kantiakhai PF (3.3 km) Kanika Sand Forest (1.7 km) Bagulida RF (Proposed) (9.9 km), Suneirupei PF (10.0 km) and Katiakhal RF(3.1 km)
(3.)Archaeological Sitesnil0na
(4.)Defence InstallationsNA0Integrated Test Range (ITR) of DRDO (at Wheeler Island @13.0 km
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 690
(b)Land yet to be acquired(Ha) 247.7
(c)Status of Land acquisition if not acquired as per concession agreement Govt of Odisha to prov
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Reclamation of Sea/Submerged area of 1075.7 Ha is proposed
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dhamra River - 1.6 km S Matai Nadi- 8.0 km W MaipuraNadi- 9.3 km S Ranahansua River - 12.3 km S BaunsagarhNadi- 11.2 km S SatabhayaNala- 14 km S BhitraKanikaNadi- 11.8 km SW SanjogaNadi- 11.1 km SW Munda JhorNadi- 6.6 km SSW KanthiakaiNala- 5.5km S BhektaNala- 6.8 km SSW MahulJhor- 3.5 km W DosandhiJhor- 12.4 km NW SotraJhor- 4.9 km WNW GallaNadi- 12.2 km W
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 14
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 4000
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 330
(f)Total Manpower 4000
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt54.03204.87258.9
(2.)Percentage of Total Project Area2.6810.1712.85
(3.)No. of Plants100000715000815000
(4.)Funds Allocated10000000720000000730000000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IV
(b)Location Type Low and Medium Eroding Coast
(c)Details of Mangroves Land Involved, if Any mangrove excluded. only north side utility corrido
(d)Area of Mangroves Land (hectare)
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies CEIA cover MarineTerrestrial&Social environment ca
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 15 Sep 2017
(iv)Period of Study To (EIA Terrestrial) 18 Feb 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies CEIA cover MarineTerrestrial&Social environment ca
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 17 Sep 2017
(iv)Period of Study to (EIA Marine) 18 Feb 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan DMP OSCP covered in CEIA
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps National Institute of Oceanography (NIO)
(ii)Please Specify with salient features Project falls underCRZI(A),I(B),III, IV(A)
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IV
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed NO
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) -
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 14
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 22
(d)Total plot area (sqm) 20134000
(e)Total built up area (sqm) 92840
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Multipurpose (including Liquid) - Coal / Iron ore
(d)Quantity of Cargo 314
(e)Control Measures of Cargo Necessary design considerations, safety and mitig
(f)Dust Control Measures Adequate pollution control measures will be taken
(g)Quantum 0
(h)Quantity of Dredging (Cubic meter per day) 185
(i)Type of Dredging Capital
(j)Disposal of Dredge Material 20 MCM maintenance dredging material
(k)Details of Outfall Diffusers LNG/LPG FSRU/FSO & desal reject
(l)No. of Dilution Expected 0
(m)Distance at which the Outlet will Reach Ambient Parameters 600
(n)Details of Monitoring at Outfall Monitoring plan as mentioned in CEIA
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking Parking facilities is considered as a part of Revi
5.
Energy Saving Measures:
(a)Source/Mode Solar/Wind
(b)Percentage 5
(c)Quantity 43
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area Natural drainage will be maintained.
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/ENV/ACO/18/0810
(ii)Name of the EIA Consultant L&T Infrastructure Engineering Limited
(iii)Address 6-3-1192/1/1, 5th Floor, Block No.3, White House, Kundan Bagh, Begumpet, Hyderabad – 500 016
(iv)Mobile No. 9491035051
(v)Landline No. 0404035443
(vi)Email Id cvs@lntiel.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 09 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per ToR condition recommendation from Odisha Coastal Zone Management Authority (OCZMA) are required. The same has not been submitted. Kindly submit the same. 24 Jun 2019
2.NAThe correction have been made as per the instruction received 24 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicant
DesignationAGM
Name of Company (Applicant Name should not be given here)The Dhamra Port Company Limited
AddressThe Dhamra Port Company Ltd, Fortune Towers, 2nd Floor, Chandrashekharpur, Bhubaneswar - 751023
Print