Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) PNP Maritime Services Pvt. Ltd.
(b)Name of the Company / Organisation PNP MARITIME SERVICES PVT LTD
(c)Registered Address A-5, Ionic, 18 Arthur Bunder Road, Colaba, Mumbai,,Mumbai City,Maharashtra-400005
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Siddharth Ghosh
(b)Designation (Owner/ Partner/ CEO) DGM- Commercial & Operation
(c)Address A-5, Ionic, 18 Arthur Bunder Road, Colaba, Mumbai.,,Mumbai,Mumbai City,Maharashtra-400005
(d)Pin code 400005
(e)E-mail pnpport@gmail.com
(f)STD Code. 22(f)Telephone No. 22884536
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIS/59562/2016
(d)Master Proposal Number(Single Window) SW/107422/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Gut no.340
(b)Pincode 402201
(c)Bounded Latitudes (North)
From
Degree 18.70888889
Minutes
Second
From
Degree 73.02333333
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 18.70277778
Minutes
Second
From
Degree 73.01694444
Minutes
Second
(e)Survey of India Topo Sheet No. E43G13 E43G14 E4H1 E4H2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 3.45
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 20
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraRaigadAlibag
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number 10-70/2016-IA-III
(c)Date of Apply of TOR 08 Oct 2016
(d)Date of Issue of TOR / Standard ToR 22 Mar 2018
(e)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Jan 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Feb 2019
Distance of Public Hearing Venue from the Proposed Project :17
Lokshikshan Mandal Sabhagruh
State :Maharashtra
District :Raigad
Tehsil :Alibag
Village :Shahabaj
100During the Public hearing major issues raised by the local people related to the pollution due to the coal, sulphur, phosphate will increase, which will affect the local agriculture fields and the polOthersAdditional District Magistrate
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Expansion and Development of existing port5 MTPA To 19 MTPARoad/ Rail Transport
(2.)Plot Area60 HA To 135 HASome land to be Procured
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cargo handling ( Major Bulk Cargo : Coal Other Cargo : Sulphur, Bulk Cargo, Break Bulk cargo, Agro commodities, Clinker, Dolomite, Limestone, Pyroxenite, Iron ore, Cement, Slag, Rock Phosphate, Bauxi19OthersMTPARoad,Rail,Conveyor Belt
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 19 Mar 2016
(iv)Valid Upto 31 Dec 2020
(v)File No. BO/MPCB/RO(HQ)/RD-3231-16/CR/B-3912. dt. 19.03.201
(vi)Application No. 49741000
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 1058.34
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.03
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.65
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.22
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)0000Tons per AnnumIndonesiaOtherssea7000 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Dec 2016 To 28 Feb 2017
(b)Season Post-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube31.67.730.480
(2.)NOxMicro Gram per Meter Cube33.78.633.580
(3.)OthersCOMicro Gram per Meter Cube3.50.23.304
(4.)PM10Micro Gram per Meter Cube98.242.097.0100
(5.)PM2.5Micro Gram per Meter Cube49.720.630.160
    14.2.     No. of Ground Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l175120200600
(2.)pHNA8.16.58.58.5
(3.)Chloridesmg/l38.032.52501000
(4.)TDSmg/l3422425002000
(5.)TSSmg/l8500
(6.)OthersTotal ColiformOthersMPN/100ml00000000
(7.)Fluoridemg/l00001.01.5
    14.3.     No. of Surface Water monitoring locations : 5
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l2.82.4B
(2.)CODmg/l9.48.2B
(3.)pHNA8.27.7B
(4.)DOmg/l7.55.4B
    14.4.     No. of Ambient Noise monitoring locations : 7
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))72.652.875
(2.)Leq(Night)A-weighted decibels(dB(A))66.442.870
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH9.27.7
(2.)N(Nitrogen)Kilogram per hectare14468.9
(3.)P(Phosphorus)Kilogram per hectare23.49.0
(4.)K(Potassium)Kilogram per hectare55689.6
(5.)Electric ConductivityMillisiemens per Centimetre24001850
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 30
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 12 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Water Supply7320Copy of Permission LetterPipelineJack WellNo. EE(A)/DE(A)/239325 May 201280
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)STP Domestic Sewage3150Equalisation tank + Primary settling tank + Aerobic Treatment (SAFF or FAB media and fine bubble diffuser membranes)+ Final Settling Tank + Disinfection+ Multi grade Sand Filter & Activated Carbon FilterReuse within the Plant & Recycling31
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 31
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 31
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Non biodegradableOthersPort waste24.54Tons70RoadAuthorized Recyclers
(2.)BiodegradableMunicipal Solid Waste32.49Tons00OthersWaste Management SystemOthersVermicomposting
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube42.822.445.260
(2.)SO2Microgram per Meter Cube0000000180
(3.)NOxMicrogram per Meter Cube0020000180
(4.)PM10Microgram per Meter Cube90.323.093.4100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DGDisel30.1SO20.62
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 8375
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 740 kVA
(e)Stack Height (in m) 3
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 00
(b)Private Land (ha.) 60
(c)Government Land (ha.) 00
(d)Revenue Land (ha.) 00
(e)Other Land (ha.) 135
    Total Land (ha.) 195
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 8107.3
(b)Waste/Barren Land (ha.) 2372.1
(c)Grazing/ Community Land (ha.) 4763.1
(d)Surface Water Bodies (ha.) 1357.2
(e)Settlements (ha.) 2664.6
(f)Industrial (ha.) 0000
(g)Forest (ha.) 8026.7
(h)Mangroves (ha.) 888.50
(i)Marine Area (ha.) 2142.4
(j)Others (ha.) : Marshy Area 1103.2
    Total (ha.) 31425.100000000002
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersLand required for storage of cargo195No
Total (ha.) 195
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNo00No
(2.)NPANo00No
(3.)ESZsNo00No
(4.)CorridorsNo00No Corridor in study area
(5.)ESAsNo00No
(6.)Wildlife CorridorsNo00No any wildlife corridors in study area
(7.)WLSNo00No
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA00NA
(2.)Defence InstallationsNA00NA
(3.)OthersEcological sensitivityNA00NA
(4.)Archaeological SitesSiddheshwar Temple9Old Temple
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 00
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 60
(b)Land yet to be acquired(Ha) 135
(c)Status of Land acquisition if not acquired barren land is adjacent to existing port and 135
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 00
(b)No. of Households 00
(c)No. of PDFs (Project Displaced Families) 00
(d)No. of PAFs (Project Affected Families) 00
(e)Funds Allocated for R&R(in INR) (in Lacs) 00
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Only Birds species observed from schedule I from the study area
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Abuting to Amba river/ Dharamtar Creek and Shreegaon Dam
(ii)Direction of Water Bodies in Buffer Area South East
(iii)Distance of Water Bodies in Buffer Area 5.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 700
(c)Temporary Employment- During Construction 40
(d)Temporary Employment- During Operation 0
(e)No. of working days 150
(f)Total Manpower 740
32.
Green Belt in Ha:
(a)Total Area of Green Belt 35
(b)Percentage of Total Project Area 17.95
(c)No. of Plants to be Planted 25248
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IA
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any Mangrove buffer area
(d)Area of Mangroves Land (hectare)
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies Included in EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 02 Dec 2016
(iv)Period of Study To (EIA Terrestrial) 28 Feb 2017
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies Included in EIA Report
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 02 Dec 2016
(iv)Period of Study to (EIA Marine) 28 Feb 2017
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Included in EIA Report
2.
Description of the Project Under Consideration:
(a)Type of Project Others
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing, Chennai
(ii)Please Specify with salient features Its a expansion of existing PNP port
(iii)Uploaded relevent Document Copy of relevent Document
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IA
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 0
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 0
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? Yes
(i)Uploaded Maps (Shape File) Copy of Maps
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared Yes
(i)Uploaded Maps (kml File) Copy of Maps
(f)NOC from State Pollution Control Boards Obtained No
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed EMP shall be implemented during construction
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) MCZMA letter attached herewith.
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 00
(b)Total No. of Flats to be Build 00
(c)No. of Buildings 00
(d)Total plot area (sqm) 1950000
(e)Total built up area (sqm) 00
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? No
3.
Rain Water Harvesting:
(a)No. of Storage 2
(b)Capacity 400
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 2W: 300 & Truck: 450
5.
Energy Saving Measures:
(a)Source/Mode LEDs, Energy efficient pumps, motors etc.
(b)Percentage 10
(c)Quantity 0
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area They will not be any discharge of waste water from
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/17/00427 dt 09.10.2017
(ii)Name of the EIA Consultant Mahabal Enviro Engineers Pvt. Ltd.
(iii)Address Plot No.F7, Road No.21, Wagle MIDC area, Near Ashida Electronics, Thane West 400604, Maharashtra
(iv)Mobile No. 9323058368
(v)Landline No. 0222171638
(vi)Email Id dap_24@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 08 Oct 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAThe copy of EIA/EMP (annexures) attached with EIA/EMP report is not legible. Kindly upload the clear copy of the same. 09 Sep 2019
2.NAThe correction have been made as per the instruction received 11 Sep 2019
3.NAThe copy of annexures attached is still not legible. Kindly upload the clear copy of the same. 12 Sep 2019
4.NAThe correction have been made as per the instruction received 12 Sep 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterDear Sir, We are very much thankful to Expert Appraisal Committee for appraising our above referred project for Environmental and CRZ Clearance in its 46th EAC Meeting held on 26.11.2019. As per the minutes of the meeting, we were asked to comply with certain points raised by committee. The point wise reply to the queries raised is enclosed herewith. We hope that reply is in line with your requirement. We request you to kindly consider our case in next EAC meeting and oblige. Thanking you, Yours faithfully, PNP MARITIME SERVICES PVT. LTD. 19 Jun 2020
2.NA

Kindly see the minutes of 46th meeting of EAC (Infra-2).

06 Dec 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSiddharth Ghosh
DesignationDGM- Commercial & Operation
Name of Company (Applicant Name should not be given here)PNP MARITIME SERVICES PVT LTD
AddressA-5, Ionic, 18 Arthur Bunder Road, Colaba, Mumbai
Print