Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Khairibhandan Barrage Project
(b)Name of the Company / Organisation CHIEF ENGINEER
(c)Registered Address Chief Engineer PPF&I, Secha Sadan, Bhubaneswar, Odisha l,,Khordha,Orissa-751001
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Kumud Ranjan Acharya
(b)Designation (Owner/ Partner/ CEO) Chief Engineer
(c)Address Chief Engineer PPF&I, Secha Sadan, Bhubaneswar, Odisha,,Khordha,Khordha,Orissa-751001
(d)Pin code 751001
(e)E-mail wrceppf@gmail.com
(f)STD Code. 674(f)Telephone No. 2396475
(g)Fax No. 2396476
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/OR/RIV/30160/2015
(d)Master Proposal Number(Single Window) SW/107357/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Khairbandhan Barrage Project is contemplated on Kh
(b)Pincode 757034
(c)Bounded Latitudes (North)
From
Degree 21.966389
Minutes
Second
From
Degree 21.966389
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 86.058889
Minutes
Second
From
Degree 86.058889
Minutes
Second
(e)Survey of India Topo Sheet No. 73K/1, 73K/5, 73F/16 & 73G/13
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 400
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 1.5
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Orissa
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/24/2015-IA-I
(b)Date of Apply of TOR 18 Aug 2015
(c)Date of Issue of TOR / Standard ToR 02 Nov 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :10 Mar 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :13 Apr 2018
Distance of Public Hearing Venue from the Proposed Project :3
At office of Moudi Gram Panchayat
State :Orissa
District :Mayurbhanj
Tehsil :Jashipur
Village :Moudi
250Details of project on catchment area in the upstream & downstream of the barrage, rehabilitation, protection of Ram Tirtha worshipping place etcOthersADM
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Barrage on Khairibandhan River171.50 meter long
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Cultural Command Area6950HectaresOthers-
(2.)Gross Command Area8700HectaresOthers-
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 235.42
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.6842
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.76
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.12
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
c)Notified Eco-sensitive areas Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1606700
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1606700
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sand35000OthersCumBaitarini River, ChadeigalRoad40 OthersInvitation To BidCopy of Linkage
(2.)Granular Material/Moorum40000OthersCumLocalRoad40 OthersInvitation To BidCopy of Linkage
(3.)Stone35000OthersCumKoitaRoad20 OthersInvitation To BidCopy of Linkage
(4.)coarse aggregate46700OthersCumKoitaRoad20 OthersInvitation To BidCopy of Linkage
(5.)Soil1450000OthersCumLocalRoad15 OthersInvitation To BidCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jul 2016 To 30 Jun 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube13.402.2013.3980
(2.)PM10Micro Gram per Meter Cube78.218.2075.4100
(3.)PM2.5Micro Gram per Meter Cube48.6010.8047.5860
(4.)NOxMicro Gram per Meter Cube23.56.923.280
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l187.2725002000
(2.)Heavy MetalsTotal Chromiummg/l0.050.050.050.05
(3.)pHNA7.40.26.58.5
(4.)Total Hardnessmg/l8240.2300600
(5.)Fluoridemg/l240.4101.5
(6.)TSSNA0000
(7.)OthersIronmg/l0.110.110.30.3
(8.)Chloridesmg/l0.050.052501000
    14.3.     No. of Surface Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l7452C
(2.)BODmg/l10.60.8C
(3.)pHNA7.86.51C
(4.)DOmg/l4.94.4C
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))65.225.745
(2.)Leq(Day)A-weighted decibels(dB(A))6528.455
    14.5.     No. of Soil Sample Monitored locations : 7
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)pH7.46.2
(2.)P(Phosphorus)Percent0.60.0
(3.)N(Nitrogen)Percent0.10.0
(4.)K(Potassium)Percent0.30.0
(5.)Electric ConductivityMillisiemens per Centimetre88.668.0
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5.05 To 9.95
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.78 To 5.13
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersSurface Water000 Not Appliacble modeOthersPipelineOthersNANA01 Jan 201900
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent from Project Colony0000STPOthersOthers0000
(2.)Impacts on Water Quallity due to Impoundage0000NAOthersNA0000
(3.)Water Resources & Downstream Users0000NAOthersNA0000
(4.)Sediments0000NAOthersNA0000
(5.)Impacts on River Bed Stability0000NAOthersNA0000
(6.)Eutrophication Risk0000NAOthersNA0000
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Labour CampsMunicipal Solid Waste0.876Tons0RoadOthersMunicipal Solid Waste Dump Yards
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)NOxMicrogram per Meter Cube13.9720.0514.580
(2.)PM2.5Microgram per Meter Cube00011
(3.)SO2Microgram per Meter Cube10.620.391180
(4.)PM10Microgram per Meter Cube54.0720.1455100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel50.3PM100.03
(2.)DG SetDiesel50.3SO20.004
(3.)DG StackDiesel50.3NOx0.01
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 250
(b)Source DG Sets
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250
(e)Stack Height (in m) 5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 26.444
(b)Private Land (ha.) 173.035
(c)Government Land (ha.) 92.740
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 126.35
    Total Land (ha.) 418.569
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 6574.5
(b)Waste/Barren Land (ha.) 2204.4
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 471.3
(e)Settlements (ha.) 12378.4
(f)Industrial (ha.) 0
(g)Forest (ha.) 5527
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open Scrub 42396
    Total (ha.) 69551.6
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area65.8019Barrage with Pond Submergence Area
(2.)Water Reservoir302.60Main Canal, Distributaries & Minors
(3.)OthersNew Communication Approach Road & Road Development50.15
Total (ha.) 418.5519
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSNA0NA
(3.)ESAsNA0NA
(4.)CorridorsNA0NA
(5.)Wildlife CorridorsNA0NA
(6.)NPANA0NA
(7.)ESZsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBrguna RF0Nearer to the site
(2.)OthersForestKudarbisida RF1.5South-West Direction
(3.)Archaeological SitesNA0NA
(4.)Defence InstallationsNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 615
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 292.219
(b)Land yet to be acquired(Ha) 418.569
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Khairibandhan
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? Yes
(i)Uploaded copy of permission Copy of permission
(ii)Letter No. Irr.III-(INV)39/08-37756//WR
(iii)Date of issue 26 Nov 2008
(iv)Recommendation NA
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Gohira Nala
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 9
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 60
(b)Permanent Employment-During Operation 60
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 580
(e)No. of working days 300
(f)Total Manpower 1000
32.
Green Belt in Ha:
(a)Total Area of Green Belt 39.707
(b)Percentage of Total Project Area 9.49
(c)No. of Plants to be Planted 42310
(d)Funds Allocated for Plantation 200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe project boosts total farm output and hence, raises farm income.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Khairibandhan
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Barrage6171.565.8198700695069506950
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 0
(c) No. of Tunnels 0
(d) No. of Units 0
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)75 %00NA
(2.)90 %00NA
(3.)50 %00NA
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 0
(c) Utilized for Construction (in cubic meter)0
(d) No. of Muck Disposal sites0
(e) Total Muck Disposal Area (in hectare)0
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 0
(c) Name of the umbrella Fish Species (Scientific Name)NA
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean020
(2.)Non-Lean Non-Monsoon025
(3.)Monsoon030
11. Free Flow Stretch (in km) 29.71
12.
Approval of Central Water Commission Yes
(a)Approval Reference No. M&A/AP/32/2008/42-43
(a)Date of Approval 12 Jan 2010
(a)Copy of Approval Copy of approval
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) Yes
(a) Quantity of the material (in cubic meter). 20180
(b) Length of the dam (in meter) 150
(c) Decommissioning Plan Copy of Decommissioning Plan
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1720/RA0090
(ii)Name of the EIA Consultant Visiontek Consultancy Services Pvt. Ltd.
(iii)Address Plot No. M-22 & M-23, Chandaka Industrial Estate, Distt.-Khurda, Bhubaneshwar-751024 (Odisha)
(iv)Mobile No. 9338822732
(v)Landline No. 0674645178
(vi)Email Id visiontekin@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 13 Mar 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File NA
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease state whether it attracts General Condition of EIA Notification. 22 Aug 2019
2.NAThe correction have been made as per the instruction received 23 Aug 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS COMPLIANCE AS PER THE Minutes of the 27th Meeting of the Expert Appraisal Committee for River Valley and Hydroelectric Projects held on 23.09.2019 at Teesta Meeting Hall, 1st Floor, Vayu Block, Indira Paryavaran Bhawan, Jor Bagh Road, New Delhi–3. KML file cannot be attached with pdf so screen shot of the project area has been attached 28 Nov 2020
2.NA

EAC after detailed deliberation on the information submitted and presentation made by the PP, deferred the project and sought the following additional information:
1. The .kml file of the instant proposal submitted with Form 2 is not in format. Proper .kml shape file having polygon feature should be uploaded.
2. Forestland is involved in the project (around 26.444 ha). However, it is mentioned in point 24 of Form 2 that ‘No forestland’ is involved and thus, necessary corrections in Form 2 be made. Status of application of Stage I FC to be submitted for Forest Clearance.
3. Boundary of the Similipal National Park is located within 10 km from the proposed project; therefore, project requires NBWL clearance. Further, details in Form 2 (Point 23.1 to 23.3) should be modified accord

15 Oct 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKumud Ranjan Acharya
DesignationChief Engineer
Name of Company (Applicant Name should not be given here)CHIEF ENGINEER
AddressChief Engineer PPF&I, Secha Sadan, Bhubaneswar, Odisha
Print