1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion in Sponge iron Plant (6,00,000 TPA to 7,80,000 TPA) & Mini Blast Furnace with Oxygen Plant (3,00,000 TPA to 3,90,000 TPA) by process optimization & increasing number of working days/annum at | (b)Name of the Company / Organisation | ORISSA METALIKS PRIVATE LIMITED | (c)Registered Address | GRASTIN PLACE, ORBIT 3RD FLOOR,ROOM NO . 3B, KOLKATA,Kolkata,West Bengal-700001 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | BIJAYEN SRIVASTAVA | (b)Designation (Owner/ Partner/ CEO) | MANAGER | (c)Address | GRASTIN PLACE, ORBIT 3RD FLOOR,ROOM NO 3B, KOLKATA,,Kolkata,West Bengal-700001 | (d)Pin code | 700001 | (e)E-mail | orissametalikspvtltd@gmail.com | (f)STD Code. | 33(f)Telephone No. | 22438518 | (g)Fax No. | 03322438517 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(a) Metallurgical industries (ferrous & non ferrous)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND/107252/2019 | (d)Master Proposal Number(Single Window) | SW/107251/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Attached as Annexure | (b)Pincode | 721301 | (c)Bounded Latitudes (North) | | From | | Degree | 22.37522222 | Minutes | | Second | | From | | Degree | 22.38078056 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 87.280277778 | Minutes | | Second | | From | | Degree | 87.28500000 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 73N/3, 73N/7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 37 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.8 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhubaneswar | (iii)Letter No. | 102-179/07/EPE dated 14th May, 2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Apr 29 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Mini Blast Furnace with Oxygen Plant | 300000 | 90000 | 390000 | Tons per Annum(TPA) | | Road,Rail | | (2.) | CFBC Based CPP | 25 | 0 | 25 | Mega Watt(MW) | | Others | Cables | (3.) | Sponge Iron Plant (DRI Kiln) | 600000 | 180000 | 780000 | Tons per Annum(TPA) | | Road,Rail | | (4.) | AFBC based CPP | 6 | 0 | 6 | Mega Watt(MW) | | Others | Cables | (5.) | WHRB Based CPP | 52 | 0 | 52 | Mega Watt(MW) | | Others | Cables | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | DRI Kiln for Sponge Iron Plant | 6 x 100 TPD, 1 x 350 TPD, 1 x 600 TPD, 1 x 500 TPD | No change | 6 x 100 TPD, 1 x 350 TPD, 1 x 600 TPD, 1 x 500 TPD | Proposed expansion will be achieved by process optimization in existing configuration | (2.) | Mini Blast Furnace | 1 x 320 m3 | No change | 1 x 320 m3 | Proposed expansion will be achieved by process optimization in existing configuration | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 17 Nov 2016 | (iv)Valid Upto | 30 Nov 2021 | (v)File No. | CO No-74191, CO No-113740, CO No-106579 | (vi)Application No. | CO No-74191, CO No-113740, CO No-106579 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.72 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3103600 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 3103600 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Dolomite | 46800 | Tons per Annum | | From Birmitrapur and Bilaspur | Road,Rail | | 541 | Open Market | | Copy of Linkage | (2.) | PELLET | 1466400 | Tons per Annum | | Orissa Metaliks Pvt Ltd & Rashmi Metaliks Ltd | Road | | 2 | Captive | | Copy of Linkage | (3.) | Sinter | 187200 | Tons per Annum | | Rashmi Metaliks Limited, Kharagpur | Road | | 2 | Captive | | Copy of Linkage | (4.) | Quartzite | 159900 | Tons per Annum | | Belpahar, Bilaspur and Raipur | Road,Rail | | 541 | Open Market | | Copy of Linkage | (5.) | Coke | 96000 | Tons per Annum | | Open Market Jindal VISA Bengal Energy or Imported | Road,Rail | | 100 | Open Market | | Copy of Linkage | (6.) | Limestone | 7200 | Tons per Annum | | Birmitrapur, Bilaspur, Raipur, Katni | Road,Rail | | 541 | Open Market | | Copy of Linkage | (7.) | Iron ore lump (BF grade) | 296400 | Tons per Annum | | Barbil Joda Orissa | Road,Rail | | 201 | Fuel Supply Agreement | | Copy of Linkage | (8.) | Pyroxenite | 11700 | Tons per Annum | | Jharkhand and Orissa | Road,Rail | | 541 | Open Market | | Copy of Linkage | (9.) | Coal | 832000 | Tons per Annum | | EAuction Purchased from BCCL or Imported | Road,Rail | | 177 | Fuel Supply Agreement | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.34 To 3.05 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 11.63 To 2.71 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 3065 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | List Attached | 03 May 2017 | 3789 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 100 | 200 | Primary & Secondary Treatment | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 100 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 100 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 100 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Kiln Accretion | Industrial Waste | | 6240 | Tons | 50 | Road | | Others | Used in Sinter Plant, Cement Manufacturing | (2.) | Char & Dolochar | Industrial Waste | | 148200 | Tons | 0 | Others | In House | Others | Used in FBC Boiler | (3.) | Fly Ash | Fly Ash | | 84500 | Tons | 100 | Road | | Others | Used for bricks and Cement Manufacturing | (4.) | Dust from APC Devices | Industrial Waste | | 109200 | Tons | 100 | Road | | Others | Used in Sinter Plant and Brick Manufacturing | (5.) | MBF Dust & Sludge | Industrial Waste | | 170000 | Tons | 100 | Road | | Others | Used in Sinter Plant and Brick Manufacturing | (6.) | MBF Slag | Industrial Waste | | 148200 | Tons | 50 | Road | | Others | Used in Captive Cement Plant | (7.) | Bottom Ash | Bottom Ash | | 152503 | Tons | 500 | Road | | Others | Road Construction & Land Filling | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 8.46 | 0 | 0 | 8.56 | 80 | (2.) | PM10 | | Microgram per Meter Cube | 87.14 | 0 | 0 | 87.24 | 100 | (3.) | PM2.5 | | Microgram per Meter Cube | 52.12 | 0 | 0 | 52.22 | 60 | (4.) | NOx | | Microgram per Meter Cube | 38.1 | 0 | 0 | 38.2 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | AFBC-6 MW | COAL & DOLOCHAR | 60 | 2.8 | PM10 | | 25 | (2.) | DRI Kiln 9 | Coal | 60 | 2.8 | PM10 | | 60 | (3.) | DRI Kiln 5 & 6 | Coal | 50 | 2.8 | PM10 | | 55 | (4.) | CFBC-25 MW | COAL & DOLOCHAR | 70 | 3.2 | PM10 | | 35 | (5.) | MBF | Coal | 50 | 2.2 | PM10 | | 18 | (6.) | DRI Kiln 3 & 4 | Coal | 50 | 2.8 | PM10 | | 55 | (7.) | DRI Kiln 7 & 8 | Coal | 75 | 2.8 | PM10 | | 60 | (8.) | DRI Kiln 1 & 2 | Coal | 50 | 2.8 | PM10 | | 55 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 52076 | (b)Source | Captive Power Plant | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 2x600 KVA and 1x350 KVA | (e)Stack Height (in m) | 10.5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 16.99 | Total Land (ha.) | 16.99 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 22352 | (b)Waste/Barren Land (ha.) | 1383 | (c)Grazing/ Community Land (ha.) | 871 | (d)Surface Water Bodies (ha.) | 1034 | (e)Settlements (ha.) | 2714.34 | (f)Industrial (ha.) | 535.66 | (g)Forest (ha.) | 2539 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 31429 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 8.11 | | (2.) | Others | Raw material Yard | 1.7 | | (3.) | Water Reservoir | | 0.61 | | (4.) | Green belt | | 5.61 | | (5.) | Safety Zone | | 0.96 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Not Applicable | 0 | No WLS within 10 km radius | (2.) | NPA | Not Applicable | 0 | No NPA within 10 km radius | (3.) | Corridors | Not Applicable | 0 | No Corridors within 10 km radius | (4.) | Wildlife Corridors | Not Applicable | 0 | No Wildlife Corridors within 10 km radius | (5.) | ESZs | Not Applicable | 0 | No ESZ within 10 km radius | (6.) | ESAs | Not Applicable | 0 | No ESA within 10 km radius | (7.) | Critically Polluted Area | Not Applicable | 0 | No CPA within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | 2 Protected Forest | 6 | North Direction | (2.) | Archaeological Sites | | Not Applicable | 0 | No Archaeological sites within 10 km radius | (3.) | Defence Installations | | Kalaikunda Airforce Station | 8 | SW Direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 16.99 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Already Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kasai River | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 2.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 200 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 360 | (e)No. of working days | 330 | (f)Total Manpower | 560 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Percentage of Total Project Area | 28 | 5 | 33 | (2.) | Total Area of Green Belt | 4.80 | 0.80 | 5.6 | (3.) | No. of Plants | 7500 | 2500 | 10000 | (4.) | Funds Allocated | 3000000 | 500000 | 3500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | Employment Generation | (2.) | Financial | Revenue Generation | (3.) | Environmental | No increase in pollution load | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA 0069 | (ii)Name of the EIA Consultant | J M EnviroNet Pvt. Ltd. | (iii)Address | 202 A, ABW Tower, MG Road, Gurgaon Haryana | (iv)Mobile No. | 9015209362 | (v)Landline No. | 9015209362 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 07 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | i.Closure report on the observed non-compliances from Regional Office of the MoEF&CC has not been furnished.
ii.Permission for drawl of 3789 m3/hr has not been furnished. | 18 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 18 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Reply to the ADS submitted. Kindly grant us Environment Clearance. | 05 Oct 2019 | 2. | NA | In view of the aforesaid and after
detailed delibrations, the Committee deferred the consideration of the proposal
cited above and sought following additional information for further
considerationof the proposal:
| 13 Jul 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | BIJAYEN SRIVASTAVA | Designation | MANAGER | Name of Company (Applicant Name should not be given here) | ORISSA METALIKS PRIVATE LIMITED | Address | GRASTIN PLACE, ORBIT 3RD FLOOR |
|