Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Expansion in Sponge iron Plant (6,00,000 TPA to 7,80,000 TPA) & Mini Blast Furnace with Oxygen Plant (3,00,000 TPA to 3,90,000 TPA) by process optimization & increasing number of working days/annum at
(b)Name of the Company / Organisation ORISSA METALIKS PRIVATE LIMITED
(c)Registered Address GRASTIN PLACE, ORBIT 3RD FLOOR,ROOM NO . 3B, KOLKATA,Kolkata,West Bengal-700001
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant BIJAYEN SRIVASTAVA
(b)Designation (Owner/ Partner/ CEO) MANAGER
(c)Address GRASTIN PLACE, ORBIT 3RD FLOOR,ROOM NO 3B, KOLKATA,,Kolkata,West Bengal-700001
(d)Pin code 700001
(e)E-mail orissametalikspvtltd@gmail.com
(f)STD Code. 33(f)Telephone No. 22438518
(g)Fax No. 03322438517
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity3(a) Metallurgical industries (ferrous & non ferrous)
Minor Activity
(b)Category A
(c)Proposal Number IA/WB/IND/107252/2019
(d)Master Proposal Number(Single Window) SW/107251/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Expansion under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Attached as Annexure
(b)Pincode 721301
(c)Bounded Latitudes (North)
From
Degree 22.37522222
Minutes
Second
From
Degree 22.38078056
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 87.280277778
Minutes
Second
From
Degree 87.28500000
Minutes
Second
(e)Survey of India Topo Sheet No. 73N/3, 73N/7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 37
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.8
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project West Bengal
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bhubaneswar
(iii)Letter No. 102-179/07/EPE dated 14th May, 2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Apr 29 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Mini Blast Furnace with Oxygen Plant30000090000390000Tons per Annum(TPA)Road,Rail
(2.)CFBC Based CPP25025Mega Watt(MW)OthersCables
(3.)Sponge Iron Plant (DRI Kiln)600000180000780000Tons per Annum(TPA)Road,Rail
(4.)AFBC based CPP606Mega Watt(MW)OthersCables
(5.)WHRB Based CPP52052Mega Watt(MW)OthersCables
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)DRI Kiln for Sponge Iron Plant6 x 100 TPD, 1 x 350 TPD, 1 x 600 TPD, 1 x 500 TPDNo change6 x 100 TPD, 1 x 350 TPD, 1 x 600 TPD, 1 x 500 TPDProposed expansion will be achieved by process optimization in existing configuration
(2.)Mini Blast Furnace1 x 320 m3No change1 x 320 m3Proposed expansion will be achieved by process optimization in existing configuration
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 17 Nov 2016
(iv)Valid Upto 30 Nov 2021
(v)File No. CO No-74191, CO No-113740, CO No-106579
(vi)Application No. CO No-74191, CO No-113740, CO No-106579
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.72
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 3103600
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 3103600
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Dolomite46800Tons per AnnumFrom Birmitrapur and BilaspurRoad,Rail541 Open MarketCopy of Linkage
(2.)PELLET1466400Tons per AnnumOrissa Metaliks Pvt Ltd & Rashmi Metaliks LtdRoad2 CaptiveCopy of Linkage
(3.)Sinter187200Tons per AnnumRashmi Metaliks Limited, KharagpurRoad2 CaptiveCopy of Linkage
(4.)Quartzite159900Tons per AnnumBelpahar, Bilaspur and RaipurRoad,Rail541 Open MarketCopy of Linkage
(5.)Coke96000Tons per AnnumOpen Market Jindal VISA Bengal Energy or ImportedRoad,Rail100 Open MarketCopy of Linkage
(6.)Limestone7200Tons per AnnumBirmitrapur, Bilaspur, Raipur, KatniRoad,Rail541 Open MarketCopy of Linkage
(7.)Iron ore lump (BF grade)296400Tons per AnnumBarbil Joda OrissaRoad,Rail201 Fuel Supply AgreementCopy of Linkage
(8.)Pyroxenite11700Tons per AnnumJharkhand and OrissaRoad,Rail541 Open MarketCopy of Linkage
(9.)Coal832000Tons per AnnumEAuction Purchased from BCCL or ImportedRoad,Rail177 Fuel Supply AgreementCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.34 To 3.05
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 11.63 To 2.71
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater30650Copy of Permission LetterPipelineTube WellList Attached03 May 20173789
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial100200Primary & Secondary TreatmentReuse within the Plant & Recycling,Green Belt Renewal Plant100
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 100
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 100
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Kiln AccretionIndustrial Waste6240Tons50RoadOthersUsed in Sinter Plant, Cement Manufacturing
(2.)Char & DolocharIndustrial Waste148200Tons0OthersIn HouseOthersUsed in FBC Boiler
(3.)Fly AshFly Ash84500Tons100RoadOthersUsed for bricks and Cement Manufacturing
(4.)Dust from APC DevicesIndustrial Waste109200Tons100RoadOthersUsed in Sinter Plant and Brick Manufacturing
(5.)MBF Dust & SludgeIndustrial Waste170000Tons100RoadOthersUsed in Sinter Plant and Brick Manufacturing
(6.)MBF SlagIndustrial Waste148200Tons50RoadOthersUsed in Captive Cement Plant
(7.)Bottom AshBottom Ash152503Tons500RoadOthersRoad Construction & Land Filling
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube8.46008.5680
(2.)PM10Microgram per Meter Cube87.140087.24100
(3.)PM2.5Microgram per Meter Cube52.120052.2260
(4.)NOxMicrogram per Meter Cube38.10038.2100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)AFBC-6 MWCOAL & DOLOCHAR602.8PM1025
(2.)DRI Kiln 9Coal602.8PM1060
(3.)DRI Kiln 5 & 6Coal502.8PM1055
(4.)CFBC-25 MWCOAL & DOLOCHAR703.2PM1035
(5.)MBFCoal502.2PM1018
(6.)DRI Kiln 3 & 4Coal502.8PM1055
(7.)DRI Kiln 7 & 8Coal752.8PM1060
(8.)DRI Kiln 1 & 2Coal502.8PM1055
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 52076
(b)Source Captive Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2x600 KVA and 1x350 KVA
(e)Stack Height (in m) 10.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 16.99
    Total Land (ha.) 16.99
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 22352
(b)Waste/Barren Land (ha.) 1383
(c)Grazing/ Community Land (ha.) 871
(d)Surface Water Bodies (ha.) 1034
(e)Settlements (ha.) 2714.34
(f)Industrial (ha.) 535.66
(g)Forest (ha.) 2539
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : NA 0
    Total (ha.) 31429
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant8.11
(2.)OthersRaw material Yard1.7
(3.)Water Reservoir0.61
(4.)Green belt5.61
(5.)Safety Zone0.96
Total (ha.) 16.99
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNot Applicable0No WLS within 10 km radius
(2.)NPANot Applicable0No NPA within 10 km radius
(3.)CorridorsNot Applicable0No Corridors within 10 km radius
(4.)Wildlife CorridorsNot Applicable0No Wildlife Corridors within 10 km radius
(5.)ESZsNot Applicable0No ESZ within 10 km radius
(6.)ESAsNot Applicable0No ESA within 10 km radius
(7.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest2 Protected Forest6North Direction
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)Defence InstallationsKalaikunda Airforce Station8SW Direction
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 16.99
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Kasai River
(ii)Direction of Water Bodies in Buffer Area North West
(iii)Distance of Water Bodies in Buffer Area 2.8
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 200
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 360
(e)No. of working days 330
(f)Total Manpower 560
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Percentage of Total Project Area28533
(2.)Total Area of Green Belt4.800.805.6
(3.)No. of Plants7500250010000
(4.)Funds Allocated30000005000003500000
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEmployment Generation
(2.)FinancialRevenue Generation
(3.)EnvironmentalNo increase in pollution load
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 1
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J M EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 1
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAi.Closure report on the observed non-compliances from Regional Office of the MoEF&CC has not been furnished. ii.Permission for drawl of 3789 m3/hr has not been furnished. 18 Jun 2019
2.NAThe correction have been made as per the instruction received 18 Jun 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterReply to the ADS submitted. Kindly grant us Environment Clearance. 05 Oct 2019
2.NA

In view of the aforesaid and after detailed delibrations, the Committee deferred the consideration of the proposal cited above and sought following additional information for further considerationof the proposal:

13 Jul 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBIJAYEN SRIVASTAVA
DesignationMANAGER
Name of Company (Applicant Name should not be given here)ORISSA METALIKS PRIVATE LIMITED
AddressGRASTIN PLACE, ORBIT 3RD FLOOR
Print