|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Capacity Augmentation of Speciality Chemicals from 11000 TPA to 22000 TPA within existing plant at Konnagar, Hooghly district, West Bengal | (b)Name of the Company / Organisation | NALCO WATER INDIA LIMITED KONNAGAR | (c)Registered Address | NALCO Water India Limited
1, Lenin Sarani P.O. Konnagar
District - Hooghly
West Bengal,,Hooghly,West Bengal-712235 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Sudhanya Sen | (b)Designation (Owner/ Partner/ CEO) | Plantmanager | (c)Address | NALCO Water India Limited 1 Lenin Sarani P O Konnagar District Hooghly West Bengal 712235,,Serampur Uttarpara,Hooghly,West Bengal-712235 | (d)Pin code | 712235 | (e)E-mail | ssen@ecolab.com | (f)STD Code. | 33(f)Telephone No. | 26740296 | (g)Fax No. | 26722287 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/WB/IND2/60903/2016 | (d)Master Proposal Number(Single Window) | SW/107103/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 3 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Dag no 639, 640, 641 & 722 | (b)Pincode | 712235 | (c)Bounded Latitudes (North) | | From | | Degree | 224253 | Minutes | | Second | | From | | Degree | 224353 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 882037 | Minutes | | Second | | From | | Degree | 882037.75 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 79 B/5, B/6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 14 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | West Bengal | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | West Bengal | Hooghly | Serampur Uttarpara | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J- 11011/360/2016-IA.II(I) | (b)Date of Apply of TOR | 06 Dec 2016 | (c)Date of Issue of TOR / Standard ToR | 28 Feb 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 09 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 1 |
| Ambedkar Bhawan, Jawarharlal Sarani, Konnagar | State : | West Bengal | District : | Hooghly | Tehsil : | Serampur Uttarpara | Village : | Konnagar |
| 250 | Employment,
Environment
management
and CSR | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Speciality Chemicals | Expansion from 11000 TPA to 22000 TPA | Capacity Augmentation of Speciality chemicals | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Water treatment chemicals, Industrial additives, oil field chemicals | 22000 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 27 Jun 2017 | (iv)Valid Upto | 31 Mar 2022 | (v)File No. | 292/PCB/HGY/R/85-97 | (vi)Application No. | C1109924 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 10 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 10 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.52 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.06 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 450 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 450 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Polymers | 120 | Tons per Annum | | Kolkata port | Road | | 25 | Linkage | | Copy of Linkage | (2.) | Organic Compounds | 200 | Others | TPM | Kolkata port | Others | Sea route | 25 | Linkage | | Copy of Linkage | (3.) | Inorganic Acids | 120 | Others | TPM | WB & Maharashtra | Road | | 40 | MoU | | Copy of Linkage | (4.) | Organic alcohol | 70 | Others | TPM | Kolkata port | Others | Sea route | 25 | Linkage | | Copy of Linkage | (5.) | Other inorganic compounds | 140 | Others | TPM | WB, Gujarat, Maharashtra | Road | | 40 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2016 To 28 Feb 2017 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 45.8 | 18.7 | 44.1 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 24.8 | 10.7 | 24.6 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 18.3 | 11.5 | 17.6 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 14.6 | 8.4 | 13.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1397 | 1094 | 500 | 2000 | (2.) | pH | | | NA | | 7.82 | 7.02 | 6.5 | 8.5 | (3.) | Total Hardness | | | mg/l | | 588 | 402 | 200 | 600 | (4.) | Fluoride | | | mg/l | | 1.1 | 0.7 | 1.5 | 1.0 | (5.) | Heavy Metals | | Iron | mg/l | | 0.08 | 0.01 | 0.3 | 0 | (6.) | TSS | | | mg/l | | 12 | 5 | 0 | 0 | (7.) | Chlorides | | | mg/l | | 421.6 | 317.5 | 1000 | 250 | |
14.3. No. of Surface Water monitoring locations : 4 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | DO | | mg/l | | 5.8 | 5.2 | A | (2.) | COD | | NA | | 25 | 12 | A | (3.) | BOD | | mg/l | | 2.5 | 2 | A | (4.) | pH | | NA | | 9.7 | 7.3 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.3 | 44.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55.1 | 41.3 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | pH | Others | Nil | 8.3 | 6.5 | (2.) | P(Phosphorus) | Kilogram per hectare | | 402.8 | 62.8 | (3.) | N(Nitrogen) | Kilogram per hectare | | 517.4 | 73.6 | (4.) | K(Potassium) | Kilogram per hectare | | 516.2 | 77.4 | (5.) | Electric Conductivity | Millisiemens per Centimetre | | 504 | 89 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.4 To 18.69 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.39 To 14.75 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 110 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | PO7 17 007 00000 00027 08 TLE | 15 Nov 2018 | 110 | (2.) | GroundWater | | 110 | 0 | Not Appliacble | modeOthers | Borewell | Others | Borewell | PO7 17 007 00000 00027 08 TLE | 15 Nov 2018 | 110 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial waste | 32 | 100 | Activate sludge process | Reuse within the Plant & Recycling | | 32 | | (2.) | Domestic | 18 | 100 | Activated sludge process | Reuse within the Plant & Recycling | | 18 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 50 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 50 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Polymeric waste | Industrial Waste | | 240 | Tons | 10 | Road | | Authorized Recyclers | | (2.) | Spent oil | Industrial Waste | | 0.24 | Kilolitre | 10 | Road | | Authorized Recyclers | | (3.) | ETP | Industrial Waste | | 12 | Tons | 10 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 24.8 | 1 | 0.38 | 26 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 14.6 | 1 | 1 | 15.7 | 80 | (3.) | NOx | | Microgram per Meter Cube | 18.3 | 1 | 0.80 | 20 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 45.8 | 1 | 0.80 | 46.6 | 100 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam generator-1 | Diesel | 15 | 0.4 | SO2 | | 107 mg/nm3 | (2.) | DG Set-1 | Diesel | 32 | 0.32 | PM10 | | 44 | (3.) | Steam generator-2 | Diesel | 15 | 0.4 | SO2 | | 97 mg/nm3 | (4.) | DG Set-1 | Diesel | 32 | 0.35 | SO2 | | 145 mg/nm3 | (5.) | Steam generator | Diesel | 15 | 0.4 | NOx | | 64 | (6.) | Steam generator-2 | Diesel | 15 | 0.4 | PM10 | | 65 | (7.) | DG Set-1 | Diesel | 32 | 0.35 | NOx | | 108 mg/nm3 | (8.) | Steam generator-1 | Diesel | 15 | 0.4 | PM10 | | 72 mg/nm3 | (9.) | Steam generator-1 | Diesel | 15 | 0.4 | NOx | | 78 mg/nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2000000 | (b)Source | Calcutta electricity supply corporation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 | (e)Stack Height (in m) | 32 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.02 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.02 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 2.02 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Nil | 0 | Total (ha.) | 2.02 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 2.02 | Total area | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | NA | 0 | Nil | (2.) | ESZs | NA | 0 | Nil | (3.) | Wildlife Corridors | NA | 0 | Nil | (4.) | NPA | NA | 0 | Nil | (5.) | ESAs | NA | 0 | Nil | (6.) | WLS | NA | 0 | Nil | (7.) | Corridors | NA | 0 | Nil | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | Nil | (2.) | Defence Installations | | NA | 0 | Nil | (3.) | Archaeological Sites | | NA | 0 | Nil | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 2.02 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Hooghly river | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 1.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 11 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 365 | (f)Total Manpower | 11 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.65 | (b)Percentage of Total Project Area | 32.18 | (c)No. of Plants to be Planted | 1500 | (d)Funds Allocated for Plantation | 50000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The industrial activity of the proposed project coupled with the ancillary industries, would
contribute to the overall socio-economic development of the region | (2.) | Environmental | The innovative solutions are carefully designed to deliver significant environmental,
social and economic sustainability. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Industrial Projects - 3 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/SA 088 | (ii)Name of the EIA Consultant | Vimta Labs Limited | (iii)Address | IDA,Phase-II, Cherlapally, Hyderabad-500 051 | (iv)Mobile No. | 9000711309 | (v)Landline No. | 0402726414 | (vi)Email Id | janardhan@vimta.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 3 | (ix)Validity of Accreditation | 19 Nov 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- Establishment of the unit with the present production @11000 TPA along with the supporting documents.
- As per the valid consent to operate, production of specialty chemicals is 1000 TPM i.e.12000 TPA. | 14 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 17 Jun 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | Response to ADS sought | 28 Sep 2020 | 2. | NA | The Ministry vide ADS has sought the following information in June 2020: (i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose. (ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006. (iii) Toxicity details of individual products/chemicals. (iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification. (v) Existing ground water extraction permission, and justification, if not obtained. (vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 22.09.2020 and it is observed that PP still not uploaded the information and uploaded old May 2020 letter.
4. In view of the above PP is again requested to upload the correct information for further necessary action. | 22 Sep 2020 | 3. | NA | The Ministry vide ADS has sought the following information in June 2020: (i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose. (ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006. (iii) Toxicity details of individual products/chemicals. (iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification. (v) Existing ground water extraction permission, and justification, if not obtained. (vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 22.09.2020 and it is observed that PP still not uploaded the information and uploaded old May 2020 letter.
4. In view of the above PP is again requested to upload the correct information for further necessary action. | 22 Sep 2020 | 4. | NA | The Ministry vide ADS has sought the following information in June 2020: (i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose. (ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006. (iii) Toxicity details of individual products/chemicals. (iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification. (v) Existing ground water extraction permission, and justification, if not obtained. (vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 22.09.2020 and it is observed that PP still not uploaded the information and uploaded old May 2020 letter.
4. In view of the above PP is again requested to upload the correct information for further necessary action. | 22 Sep 2020 | 5. | NA | The Ministry vide ADS has sought the following information in June 2020: (i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose. (ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006. (iii) Toxicity details of individual products/chemicals. (iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification. (v) Existing ground water extraction permission, and justification, if not obtained. (vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 22.09.2020 and it is observed that PP still not uploaded the information and uploaded old May 2020 letter.
4. In view of the above PP is again requested to upload the correct information for further necessary action. | 22 Sep 2020 | 6. | NA | The Ministry vide ADS has sought the following information in June 2020: (i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose. (ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006. (iii) Toxicity details of individual products/chemicals. (iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification. (v) Existing ground water extraction permission, and justification, if not obtained. (vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 22.09.2020 and it is observed that PP still not uploaded the information and uploaded old May 2020 letter.
4. In view of the above PP is again requested to upload the correct information for further necessary action. | 22 Sep 2020 | 7. | ADS Reply Letter | Response to ADS | 14 Sep 2020 | 8. | NA | The Ministry vide ADS has sought the following information in June 2020:
(i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose.
(ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006.
(iii) Toxicity details of individual products/chemicals.
(iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification.
(v) Existing ground water extraction permission, and justification, if not obtained.
(vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
2. It is noted that PP is unable to submit the information in 3 months and accordingly the proposal was delisted automatically. Further Based on the request of PP vide letter dated 11.09.2020, the the proposal was relisted on 11.09.2020.
3. The matter has again examined today i.e. on 14.09.2020 and it is observed that the information seen is blank, may be PP has not uploaded the information.
4. In view of the above PP is again requested to upload the information immediately for further necessary action. | 14 Sep 2020 | 9. | ADS Reply Letter | Response to ADS clarification sought during 19th EAC meeting. | 14 Sep 2020 | 10. | NA | The matter has been examined in the Ministry and accordingly PP is requested to submit the following details quickly for further action into the matter:
(i) Action plant to meet the norms for 33% greenbelt as per the ToR. Plantation outside the factory premises just to meet the norms shall not serve the purpose.
(ii) Specific product details in each category, as per the schedule of the EIA Notification, 2006.
(iii) Toxicity details of individual products/chemicals.
(iv) Action plan for controlling incremental GLC. The reported incremental GLCs due to the proposed project at a higher level needs re-verification.
(v) Existing ground water extraction permission, and justification, if not obtained.
(vi) Detailed effluent management plan conforming to Zero Liquid Discharge. Commitment that there shall be no discharge of treated/untreated waste water from the unit, and thus ensuring Zero Liquid Discharge.
This issues with the approval of the Competent Authority | 11 Jun 2020 | 11. | ADS Reply Letter | Response to clarification sought by EAC vide minutes of 10th EAC meeting held during 29-31st July, 2019. | 19 Feb 2020 | 12. | NA | ADS | 20 Aug 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Sudhanya Sen | Designation | Plantmanager | Name of Company (Applicant Name should not be given here) | NALCO WATER INDIA LIMITED KONNAGAR | Address | NALCO Water India Limited
1, Lenin Sarani P.O. Konnagar
District - Hooghly
West Bengal |
|