1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | common hazardous waste incinerator & other waste treatment facility | (b)Name of the Company / Organisation | M/S SHEETALA WASTE MANAGEMENT | (c)Registered Address | 78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR U.P-201002,,Gautam Buddha Nagar,Uttar Pradesh-201002 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NISHANK KAUSHIK | (b)Designation (Owner/ Partner/ CEO) | PARTNER | (c)Address | 78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR UP-201002,,Gautam Buddha Nagar,Gautam Buddha Nagar,Uttar Pradesh-201002 | (d)Pin code | 201002 | (e)E-mail | sheetalawaste1@gmail.com | (f)STD Code. | 11(f)Telephone No. | 27571410 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs)
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/UP/MIS/85302/2018 | (d)Master Proposal Number(Single Window) | SW/106885/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | D- 26 | (b)Pincode | 203001 | (c)Bounded Latitudes (North) | | From | | Degree | 282759.54 | Minutes | | Second | | From | | Degree | 28282.77 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 773946.36 | Minutes | | Second | | From | | Degree | 773948.96 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53 H/11 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 206 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.3 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Uttar Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Jharkhand | Chatra | Tandwa | Khumarang Khurd Khumarang Kalan Ursu Binglat Honhe | (2.) | Jharkhand | Hazaribag | Barkagaon | Urimari | (3.) | Orissa | Sundargarh | Koida | Ghoraburhani, Sagasahi, Kalamang | (4.) | Uttar Pradesh | Bulandshahr | Sikandrabad | | (5.) | Gujarat | Devbhumi Dwarka | Kalyanpur | Mewasa | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | 10-84/2018-IA-III | (c)Date of Apply of TOR | 13 Nov 2018 | (d)Date of Issue of TOR / Standard ToR | 18 Dec 2018 | (e)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | The proposed project is exempted from Public heari | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Recycling of discarded containers | 10 MT/Day | | (2.) | Hazardous waste incinerator | 10 MT/Day | | (3.) | E-waste dismantling & segregation | 10 MT/Day | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Hazardous waste incinerator | 10 | Tons per Annum | | Road | | (2.) | Recycling of discarded containers | 10 | Tons per Annum | | Road | | (3.) | E-waste dismantling & segregation | 10 | Tons per Annum | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Dec 2018 | (iv)Valid Upto | 17 Dec 2021 | (v)File No. | IA/UP/MIS/85302/2018 | (vi)Application No. | IA/UP/MIS/85302/2018 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.97 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.3245 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.04 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.04 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 30 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 30 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Hazardous waste, E-waste, discarded containers | 9000 | Tons per Annum | | hazardous waste generating industries | Road | | 150 | Others | industries in nearby areas | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 2.64 | 0.45 | 1.13 | 4 | (2.) | SO2 | | Micro Gram per Meter Cube | 12.6 | 9.3 | 12.0 | 60 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 162.3 | 42 | 59.5 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 42.1 | 10.6 | 25.1 | 80 | (5.) | PM10 | | Micro Gram per Meter Cube | 269.5 | 132.5 | 192.8 | 100 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | Arsenic | mg/l | | 0 | 0 | 0.01 | 0.05 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | Total Hardness | | | mg/l | | 298.8 | 236.6 | 300 | 600 | (4.) | Chlorides | | | mg/l | | 96.5 | 68.5 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 0.94 | 0.55 | 1 | 1.5 | (6.) | TDS | | | mg/l | | 536 | 423 | 500 | 2000 | (7.) | pH | | | NA | | 7.98 | 7.22 | 6.5 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.22 | 7.58 | A | (2.) | COD | | mg/l | | 126.5 | 16.5 | E | (3.) | DO | | mg/l | | 3.6 | 1.1 | E | (4.) | BOD | | mg/l | | 43.6 | 6.2 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.4 | 50.8 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 38.8 | 33.3 | 55 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 185.2 | 109 | (2.) | P(Phosphorus) | Kilogram per hectare | | 59.8 | 36.5 | (3.) | K(Potassium) | Kilogram per hectare | | 257.2 | 122.5 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 416 | 269 | (5.) | pH | | | 8.58 | 6.54 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 15 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 10 To 4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | tanker supply | 4 | 2 | Copy of Permission Letter | modeOthers | Road | Others | tanker supply | NA | 01 Jan 2019 | 4 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | efluent | 3.14 | 4 | ETP | Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 3.14 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3.14 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3.14 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | incinerator ash | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 3 | Tons | 200 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (2.) | Solid waste | Municipal Solid Waste | | 0.6 | Tons | 5 | Road,Others | NA | Others | municipal department | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 256.7 | 0.1 | 7.6 | 264.4 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 0.0 | 0.1 | 0.0 | 0.1 | 60 | (3.) | NOx | | Microgram per Meter Cube | 28 | 0.1 | 16.53 | 44.54 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 12.6 | 0.1 | 2.9 | 15.6 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set | HSD | 5 | 0.12 | PM10 | | 0.3 g/KW-hr | (2.) | DG set | HSD/LDO | 5 | 0.085 | NOx | | 0.9 g/KW-hr | (3.) | Incinerator | HSD/LDO | 30 | 0.4 | PM10 | | 4.27 E-01 mg/kg | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 100 | (b)Source | UPPCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 420 kVA (3*125 kVA + 3*15 kVA) | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0.1857 | Total Land (ha.) | 0.1857 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0.1857 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 0.1857 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | TSDF | 0.1857 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | none | 0 | none in 10 km radius | (2.) | NPA | none | 0 | none in 10 km radius | (3.) | Corridors | none | 0 | none in 10 km radius | (4.) | ESAs | Sikandrabad Distributory | 2.3 | no effluent discharge outside facility | (5.) | ESZs | none | 0 | none in 10 km radius | (6.) | Wildlife Corridors | none | 0 | none in 10 km radius | (7.) | Critically Polluted Area | none | 0 | none in 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | none | 0 | none in 10 km radius | (2.) | Forest | | none | 0 | none in 10 km radius | (3.) | Defence Installations | | none | 0 | none in 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.1857 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | pavo cristatus | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 1.0 Lac | (iii)Period of Implementation | 5 years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Sikandrabad Distributory | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 2.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 15 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 15 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 0.061281 | (b)Percentage of Total Project Area | 33.00 | (c)No. of Plants to be Planted | 87 | (d)Funds Allocated for Plantation | 67000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The growth in industrialization due to availability of safe treatment & disposal system is envisaged to generate additional employment opportunities. Also, the proposed project is envisaged to improve socio-economic conditions through CER activities in nearby villages | (2.) | Environmental | The proposed project will cater to the need of the hazardous waste generating industries by providing an environmentally sound hazardous waste incineration facility in the area. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 8 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 1857 | (e)Total built up area (sqm) | 737 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 1 | (d)Capacity | 12 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 15 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | 0 | (c)Quantity | 0 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1720/IA0026 | (ii)Name of the EIA Consultant | Gaurang Environmental Solutions Pvt. Ltd. | (iii)Address | 102, SNG, Shri Ratna Apartment, Peetal factory, Banipark, Jhotwara road, Jaipur-302016 | (iv)Mobile No. | 9782074776 | (v)Landline No. | 1414029115 | (vi)Email Id | gaurangenviro@gmail.com | (vii)Category of Accreditation | B | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 19 Jan 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | The proposal is of Category A. The EIA Report is prepared by M/s Gaurang Environmental Solutions Pvt. Ltd., who is accredited by QCI for Category ‘B’ for item 7(d) Common hazardous waste treatment, storage and disposal facilities (TSDFs). Kindly clarify the same.
Also submit plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 24 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 10 Jul 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | As instructed by the EAC, we will now submit our proposal afresh with a Category ‘A’ ACO. | 03 Oct 2019 | 2. | NA | Kindlly see final minutes of 43rd EAC (Infra-II) meeting held on 20-22, August 2019 | 05 Sep 2019 | |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | NISHANK KAUSHIK | Designation | PARTNER | Name of Company (Applicant Name should not be given here) | M/S SHEETALA WASTE MANAGEMENT | Address | 78/2, GAUR PLAZA, MAIN G.T. ROAD, LAL KAUN, GAUTAM BAUDH NAGAR U.P-201002 |
|