1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Narora Limestone Mine (M L Area- 147.940 ha) with Limestone Production Capacity of 1.0 Million TPA at Villages Sonra, Hinauti & Narora, Tehsil Huzur, District Rewa, Madhya Pradesh | (b)Name of the Company / Organisation | M/s. UltraTech Cement Ltd. | (c)Registered Address | Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093 ,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Mumbai City,Maharashtra-400093 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Dr. K.V. Reddy Reddy | (b)Designation (Owner/ Partner/ CEO) | Joint President & Corporate Head | (c)Address | Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,Ahura Centre, 1st Floor, ‘A’ Wing , Mahakali Caves Road, Andheri (E), Mumbai- 400 093,,kalaburagi,Karnataka-400093 | (d)Pin code | 400093 | (e)E-mail | kvijender.reddy@adityabirla.com | (f)STD Code. | 22(f)Telephone No. | 66917400 | (g)Fax No. | 28244970 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(a) Mining of minerals
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MP/MIN/25548/2014 | (d)Master Proposal Number(Single Window) | SW/106879/2019 | (e)EAC concerned (for category A Projects only) | Non-Coal Mining | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Khasra Map is enclosed | (b)Pincode | 486001 | (c)Bounded Latitudes (North) | | From | | Degree | 243020 | Minutes | | Second | | From | | Degree | 243109 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 810832 | Minutes | | Second | | From | | Degree | 810948 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | G44V2, G44V3, G44V6 & G44V7 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 322 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11015/249/2014-IA.II(M) | (b)Date of Apply of TOR | 20 Aug 2014 | (c)Date of Issue of TOR / Standard ToR | 28 Oct 2014 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 01 Sep 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0.64 |
| Near Govt. Primary School Village-Sonra, Tehsil - Huzur, District - Rewa, M.P. | State : | Madhya Pradesh | District : | Rewa | Tehsil : | Huzur | Village : | Sonra |
| 217 | Social Development in the nearby area, Environmental and employment etc. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Narora Limestone Mine | ML Area - 147.940 ha, Limestone - 1.0 Million TPA | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Limestone | 1000000 | Tons per Annum | | Others | Haul Road | (2.) | OB (MSH & NDS) | 487632 | Others | Cubic Meter per Annum | Others | Through haul road | (3.) | OB Soil | 188497 | Others | Cubic Meter per Annum | Others | Through haul road | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 20 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.45 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.50 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.25 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 511500 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 511500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | HSD | 511500 | Others | Liter | Allahabad | Road | | 125 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Oct 2017 To 31 Dec 2017 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | NOx | | Micro Gram per Meter Cube | 21.6 | 11.3 | 21.06 | 80 | (2.) | SO2 | | Micro Gram per Meter Cube | 13.5 | 6.2 | 13.23 | 80 | (3.) | PM10 | | Micro Gram per Meter Cube | 83.4 | 60.8 | 82.47 | 100 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 50.07 | 25.09 | 50.01 | 60 | |
14.2. No. of Ground Water monitoring locations : 7 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Chlorides | | | mg/l | | 261.80 | 15.20 | 250 | 1000 | (2.) | TDS | | | mg/l | | 894 | 394 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 864.56 | 331.28 | 200 | 600 | (4.) | TSS | | | NA | | . | . | . | . | (5.) | Fluoride | | | mg/l | | 0.74 | 0.54 | 1.0 | 1.5 | (6.) | Heavy Metals | | - | NA | | . | . | . | . | (7.) | pH | | | Others | - | 7.53 | 7.18 | 6.8 | 8.5 | |
14.3. No. of Surface Water monitoring locations : 5 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | Others | - | 7.96 | 7.62 | D | (2.) | BOD | | mg/l | | 12.0 | 5.4 | D | (3.) | COD | | mg/l | | 39.04 | 16.59 | D | (4.) | DO | | mg/l | | 5.6 | 5.5 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.3 | 41.2 | I- 70-75, C - 55-65, R - 45- 55, S - 40 -50 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 60.4 | 49.3 | I- 70-75, C - 55 - 65, R- 45-55, S 40-50 | |
14.5. No. of Soil Sample Monitored locations : 7 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 119.80 | 20.19 | (2.) | Electric Conductivity | Others | mS/cm | 0.23 | 0.11 | (3.) | N(Nitrogen) | Kilogram per hectare | | 310.35 | 174.35 | (4.) | pH | Others | - | 8.09 | 7.43 | (5.) | K(Potassium) | Kilogram per hectare | | 492.04 | 99.53 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 39.5 To 8.3 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 36.5 To 5.3 | (c)Whether Ground Water Intersection will be there ? | Yes | (d)Upload Copy of Central Ground Water Authority Letter | Copy of Central Ground Water Authority Letter | (e)Letter No. | CGWA/NOC/MIN/ORIG/2016/2371 | (f)Date of Issue | 07 Dec 2016 | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Mine Sump Water | 90 | 0.5 | Copy of Permission Letter | Pipeline | | Others | Mine Sump | CGWA/NOC/MIN/ORIG/2016/2371 | 07 Dec 2016 | 894 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Drinking & Sanitation | 8 | 20 | Soak Pit via septic Tank | Others | Soak Pit via septic Tank | 0 | 8 | (2.) | Workshop | 10 | 20 | Oil Skimmer | Others | Dust Suppression | 10 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 18 | (b)Total Discharged Water (Kilolitre per Day) | 8 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | OB (MSH & NDS) | Others | Mine Waste | 1121553.6 | Tons | 0 | Others | Haul roads | Others | Backfilling | (2.) | OB Soil | Others | Mine Excavation | 301595.2 | Tons | 0 | Others | Haul Roads | Others | Plantation & Green Belt Development | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 34.7 | 0.310 | 0.36 | 35.07 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 10.6 | 0.175 | 2.1 | 12.8 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 70.6 | 0.250 | 1.024 | 71.625 | 100 | (4.) | NOx | | Microgram per Meter Cube | 15.3 | 0.160 | 0.1 | 15.5 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | 0 | 0 | 0 | 0 | Others | No stack is proposed | - | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 150 | (b)Source | CPP, DG Set and MPSEB Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 0 | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 146.090 | (c)Government Land (ha.) | 1.850 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 147.940 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 146.090 | (b)Waste/Barren Land (ha.) | 1.850 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 147.94 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Quarry Area | | 133.94 | 133.94 ha(Backfilled- 97.51&Water Reservoir-36.43) | (2.) | Green belt | | 8.0 | | (3.) | Others | Infrastructure & Undisturbed area | 6.0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | . | No ESAs within 10 radius of mine site | (2.) | Corridors | None | . | No Corridors within 10 radius of mine site | (3.) | Wildlife Corridors | None | . | No Wildlife Corridors within 10 radius of mine site | (4.) | WLS | None | . | No WLS within 10 radius of mine site | (5.) | Critically Polluted Area | None | . | No Critically Polluted Area within 10 radius of mine site | (6.) | NPA | None | . | No NPA within 10 radius of mine site | (7.) | ESZs | None | . | No ESZs within 10 radius of mine site | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | None | . | . | (2.) | Defence Installations | | None | . | . | (3.) | Forest | | Sathari Reserve Forest | 8.0 | . | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | . | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 63.571 | (b)Land yet to be acquired(Ha) | 82.519 | (c)Status of Land acquisition if not acquired | 1.85 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 3 | (b)No. of Households | 279 | (c)No. of PDFs (Project Displaced Families) | 4 | (d)No. of PAFs (Project Affected Families) | 55 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 7102 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | One stream is passing through eastern portion of the area | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | Nallah will be diverted during mining opeartions with prior permission from respective authority. | (ii)Details of Study Conducted | Hydrogeology study has been conducted | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kariar Nadi | (ii)Direction of Water Bodies in Buffer Area | North | (iii)Distance of Water Bodies in Buffer Area | 3.0 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 36 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 44 | (e)No. of working days | 330 | (f)Total Manpower | 80 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 105.51 | (b)Percentage of Total Project Area | 71.32 | (c)No. of Plants to be Planted | 263775 | (d)Funds Allocated for Plantation | 71200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue will be generated | (2.) | Environmental | Plantation will be done hence aesthetic beauty will be increased | (3.) | Social | Employment will be generated | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Non-Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | Limestone | Major | |
|
2. | Mine Capacity in ROM (Run of Mine) | 1000000 | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | MP/Rewa/Limestone/RMP-80/2018-19 | (b)Date of Approval | 23 May 2019 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | IBM | (e)Approved Mining Lease Area | 147.940 | (f)Approved Capacity | 1000000 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | 19.61 | (b)Mineable Reserves (Million Ton) | 14.86 | (c)Extractable Reserves(Million Ton) | 14.86 | (d)Percent(%) of Extraction | 100 | (e)Grade of Coal /Ore /Mineral | 44 | (f)Stripping Ratio | 01 : 1.20 | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | 8 | (i)Mining Method | Opencast | (j)Life of Mine (Years) | 27 | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 147.940 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | Yes | (i)Copy of Letter of Intent | Copy of Letter of Intent | (ii)Date of issue of LOI | 01 Sep 2008 | (iii)Validity of LOI | 0.6 | (iv)Reference No. of LOI | F 3-50/2007/12/1 | (c)Whether Lease Deed Executed ? | Yes | (i)Copy of Executed Lease deed valid as on Date | Copy of Executed Lease deed | (ii)Provide area in Hectare as per executed lease deed (initial) document | 147.940 | (iii)Validity of the lease deed | From : 30 Mar 2011 To : 29 Mar 2041 | (iv)Date of Execution of Mining Lese | 30 Mar 2011 | (v)Reference Number | MP32492017A1484986 | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | This is fresh lease | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | (v)No. of year back fill up | 0 | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | 0 | (ii)Total Area (in Hectare) | 0 | (iii)Height (in meter) | 0 | (iv)Quantity (in Million Cubic meter) | 0 | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 761452 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 761452 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | 36.43 | (b)Depth (in meter) | 35 | (c)Volume (in Million Cubic meter) | 12.75 | |
|
12. | Details of Quarry: | (a)Final Void of 36.43 (hectare) at a Depth of 35 meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | 133.940 | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | From working face to crusher hopper will be carrie | (b)Surface to Siding/Loading | Loading will be done by Hydraulic Excavators | (c)Transportation / Conveyor Details | By Road | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | FOREST LAND | | 0 | 0 | 0 | (2.) | WASTE LAND | | 1.350 | 0 | 1.35 | (3.) | SETTLEMENTS | | 0.12 | 0 | 0.12 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | AGRICULTURE LAND | | 145.97 | 0 | 145.97 | (6.) | SURFACE WATER BODIES | | 0.5 | 0 | 0.5 | |
TOTAL | 147.94 | 0 | 147.94 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | GREEN BELT | | 8.0 | 0 | 0 | | 8 | (2.) | VIRGIN AREA | | 0 | 0 | 4.0 | | 4 | (3.) | Other | Infrastructure | 0 | 0 | 2.0 | | 2 | (4.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (5.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (6.) | ROADS | | 0 | 0 | 0 | | 0 | (7.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (8.) | EXCAVATION/QUARRY | | 97.51 | 36.43 | 0 | | 133.94 | (9.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | |
TOTAL | 105.51 | 36.43 | 6 | 0 | 147.94 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 133.940 | (d)Safety Zone(in hectare) | 8.0 | (e)Final Void of 36.43 (hectare) at a Depth of 35 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 2500 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 2.0 | (h)Total afforestation plant (in hectare) | 105.51 | |
|
17. | Status of progressive Mining Closure Plan: | Details Not Applicable | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/RA0069 | (ii)Name of the EIA Consultant | J.M.EnviNet Pvt.Ltd. | (iii)Address | 202-A, ABW Tower, MG Road, IFFCO Chowk, Sector 25, Gurugram (Haryana) – 122001 | (iv)Mobile No. | 9509267011 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Non-Coal Mining | (ix)Validity of Accreditation | 18 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought : NIL |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | We are herewith submitting the ADS reply for your kind consideration. | 01 Jul 2020 | 2. | NA | deferred. | 01 Jul 2020 | 3. | ADS Reply Letter | We are herewith submitting the reply of ADS for your kind perusal. | 30 Apr 2020 | 4. | NA | The
Committee, after detailed deliberations, deferred the proposal and
sought the following requisite information/clarification(s): 1.
Print
|
|
|
|