Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Hind Energy & Coal Benefication (India) Ltd.
(b)Name of the Company / Organisation HIND ENERGY & COAL BENEFICIATION (INDIA) LTD.
(c)Registered Address Hind House, Sai Parisar Commercial Complex, Sh. Kant Verma Marg, Bilaspur,,Bilaspur,Haryana-495001
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Pawan Agarwal
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Hind House, Sai Parisar Commercial Complex, Sh. Kant Verma Marg, Bilaspur,,Masturi,Bilaspur,Haryana-495001
(d)Pin code 495001
(e)E-mail hecb@hindenergy.com
(f)STD Code. 7752(f)Telephone No. 429681
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity2(a) Coal washeries
Minor Activity
(b)Category A
(c)Proposal Number IA/CG/CMIN/19226/1900
(d)Master Proposal Number(Single Window) SW/106433/2019
(e)EAC concerned (for category A Projects only) Coal Mining
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 48, 51, 55/2, 55/5, 55/6, 55/7, 62/1, 55/1, 55/3,
(b)Pincode 495001
(c)Bounded Latitudes (North)
From
Degree 22.15717222
Minutes
Second
From
Degree 82.34138889
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 22.16322778
Minutes
Second
From
Degree 82.33861111
Minutes
Second
(e)Survey of India Topo Sheet No. 64-J 8
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 270
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 30
(j)Seismic Zone 1
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Chhattisgarh
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11015/364/2009.IA.II(M)
(c)Date of Issue of TOR 23 Sep 2010
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 19 Jun 2012
(c)Date of Issue of EC 21 May 2014
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :01 Mar 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :05 Apr 2017
Distance of Public Hearing Venue from the Proposed Project :1.0
Middle School Area,
State :Chhattisgarh
District :Bilaspur
Tehsil :Masturi
Village :Hindadih
123Pollution, Employment, Drinking water supply and CSR activitiesOthersAdditional Collectorate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Nagpur
(iii)Letter No. 3-34/2008(ENV)/4921
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 31 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Coal Washery (Dry to Wet)2.402.4OthersMTPARoad,Rail
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Coal washery2.4 MTPA Dry Type Coal washery2.4 MTPA Wet Type Coal Washery2.4 MTPA Wet Type Coal WasheryPresent proposal is only change in technology from Dry to Wet type
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Aug 2018
(iv)Valid Upto 27 Sep 2021
(v)File No. 4654/TS/CECB/2018
(vi)Application No. 1147080
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 12.0
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.5
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.45
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.10
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel 2.4
(c)Total quantity of raw material/fuel 2.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Raw coal2.4OthersMTPADipka, Gevra Coal MinesRoad25 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2016 To 31 May 2016
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube38.718.138.760
(2.)PM10Micro Gram per Meter Cube64.531.264.5100
(3.)NOxMicro Gram per Meter Cube21.510.821.580
(4.)OthersCOMicro Gram per Meter Cube6753856752000
(5.)SO2Micro Gram per Meter Cube19.810.519.880
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.87.16.58.5
(2.)TSSmg/l1.40.7211.5
(3.)TDSmg/l4512645002000
(4.)Heavy MetalsFemg/l0.0240.0200.31.0
(5.)Total Hardnessmg/l281208300600
(6.)Chloridesmg/l2301322501000
(7.)Fluoridemg/l0.70.331.01.5
    14.3.     No. of Surface Water monitoring locations : 3
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.57.1A
(2.)BODmg/l1.81.6A
(3.)CODmg/l6.55.9A
(4.)OthersTDSmg/l147128A
(5.)DOmg/l7.87.2A
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))634575
(2.)Leq(Night)A-weighted decibels(dB(A))553270
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare285192
(2.)K(Potassium)Kilogram per hectare68.349.5
(3.)P(Phosphorus)Kilogram per hectare33.519.5
(4.)Electric ConductivityMillisiemens per Centimetre176132
(5.)pH7.87.2
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 8.00 To 8.25
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0.56 To 2.5
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface4753.6 Not Appliacble PipelineIntake Well41st Meeting of Water Resource Department11 Oct 2017567
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sanitary Waste Water2020Dispersion trenchOthersDispersion trench200
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 20
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 20
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)RejectsOthersRejects0.72Tons50RoadOtherswill be used in Power Plant
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)SO2Microgram per Meter Cube19.80.480019.8180
(2.)PM2.5Microgram per Meter Cube38.70.481.940.760
(3.)NOxMicrogram per Meter Cube21.50.48019.841.480
(4.)PM10Microgram per Meter Cube64.50.4803.3267.83100
(5.)Others(Specify)COMicrogram per Meter Cube6750.48012.6687.72000
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Coal CrusherDiesel300.3PM100.01
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2.0
(b)Source State Grid
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 250
(e)Stack Height (in m) 4
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 11.1
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 11.1
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 17530
(b)Waste/Barren Land (ha.) 3234.2
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 2135.2
(e)Settlements (ha.) 1444.4
(f)Industrial (ha.) 1287.4
(g)Forest (ha.) 5777.6
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 31408.800000000003
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant3.64
(2.)Green belt3.68
(3.)Water Reservoir0.2
(4.)OthersStorage area2.59
(5.)Built Up Area0.98Parking
Total (ha.) 11.09
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)CorridorsNA0Nil within 10 Km. radius
(2.)Critically Polluted AreaNA0Nil within 10 Km. radius
(3.)WLSNA0Nil within 10 Km. radius
(4.)NPANA0Nil within 10 Km. radius
(5.)ESAsNA0Nil within 10 Km. radius
(6.)ESZsNA0Nil within 10 Km. radius
(7.)Wildlife CorridorsNA0Nil within 10 Km. radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestBitkuli Reserve Forest0.5Reserve Forest
(2.)Archaeological SitesNA0Nil within 10 Km. radius
(3.)Defence InstallationsNA0Nil within 10 Km. radius
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 11.1
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired total land in possession
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Lilagarh river
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 3.3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 21
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 50
(e)No. of working days 300
(f)Total Manpower 71
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt3.6803.68
(2.)Percentage of Total Project Area33033
(3.)No. of Plants750007500
(4.)Funds Allocated75000075000
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For Coal Mining
S. No.Item Details
     1.       No. of Mineral(s) to be Mined : 1
S. No.Mineral(s) to be Mined Major or Minor Mineral
(1.)NAMinor
2.
Mine Capacity in ROM (Run of Mine) 2.4 MTPA (Present Proposal)
3.
Uploaded 500 meters Cluster Certificate from State Mines and Geology in case of minor minerals Copy of 500 meters Cluster Certificate from State Mines and Geology
4.
Mining Plan:
(a)Approval Letter No. NA
(b)Date of Approval 11 Feb 2016
(c)Approved Letter Copy of Approved Letter
(d)Approved By State Mining and Geology Department MoEF&CC
(e)Approved Mining Lease Area 11.1
(f)Approved Capacity 2.4
5.
Technical Details:
(a)Total Geological Reserves (Million Ton) NA
(b)Mineable Reserves (Million Ton) NA
(c)Extractable Reserves(Million Ton) NA
(d)Percent(%) of Extraction NA
(e)Grade of Coal /Ore /Mineral NA
(f)Stripping Ratio NA : NA
(g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) NA
(h)Average Gradient(Degree) NA
(i)Mining Method Opencast
(j)Life of Mine (Years) NA
6.
Details of Beneficiations:
(a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area No
(b)Whether it is proposed to install crusher within the mining lease area No
7.
Details of Seams:
(a)Whether details of seam applicable No
8.
Details of Mining Lease:
(a)Mining Lease Area (in Hectare) 11.1
(b)Whether obtained Letter of Intent (LOI) from the state government ? No
(i)Reason thereof NA as Present proposal is Coal washery
(c)Whether Lease Deed Executed ? No
(i)Reason thereof NA as Present proposal is Coal washery
(d)Whether Lease Deed Renewed ? No
(i)Reason thereof NA as Present proposal is Coal washery
9.
OB (Over Burden) Management:
(a) Details of External Dumps:
(i)No. of OB Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
(v)No. of year back fill up
(b) Details of Internal Dumps:
(i)No. of Internal Dumps
(ii)Total Area (in Hectare)
(iii)Height (in meter)
(iv)Quantity (in Million Cubic meter)
10.
Details of Topsoil Management:
(a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) 0
(b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) 0
(c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) 0
11.
Details of Final Mine Void:
(a)Area (in Hectare)
(b)Depth (in meter)
(c)Volume (in Million Cubic meter)
12.
Details of Quarry:
(a)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body.
(b)Total Quarry Area (ha)
13.
Details of Transportation:
(a)In Pit/Underground to Surface 0
(b)Surface to Siding/Loading 0
(c)Transportation / Conveyor Details 0
     14.      Details of Land Usage (Pre-Mining)
S. No.LAND USE Other LAND USEWITHIN ML AREA (Hectare)OUTSIDE ML AREA (Hectare)TOTAL (Hectare)
(1.)SURFACE WATER BODIES000
(2.)WASTE LAND000
(3.)AGRICULTURE LAND000
(4.)GRAZING LAND000
(5.)SETTLEMENTS000
(6.)FOREST LAND000
TOTAL000
     15.      Details of Land Usage (Post-Mining)
S. No.LAND USE Other LAND USEPlantation (ha)Water Body (ha)Public Use (ha)Undisturbed (ha)Total
(1.)EXCAVATION/QUARRY0000
(2.)EXTERNAL OB DUMPS0000
(3.)ROADS0000
(4.)VIRGIN AREA0000
(5.)TOP SOIL STORAGE0000
(6.)BUILT UP AREA (COLONY/OFFICE)0000
(7.)GREEN BELT3.68003.68
(8.)INTERNAL OB DUMPS0000
TOTAL3.680003.68
16.
Details of Reclamation:
Total Afforestation Plan shall be Implemented Covering of Mining.
This will Include:
(a)External OB Dump(in hectare) 0
(b)Internal Dump(in hectare) 0
(c)Quarry(in hectare) 0
(d)Safety Zone(in hectare) 0
(e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body.
(f)Density of Tree Plantation per ha (in no.) 0
(g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) 0
(h)Total afforestation plant (in hectare) 0
17.
Status of progressive Mining Closure Plan:
Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan
Any Deviation from the Approved Progressive Mine Closure Plan NA as Present proposal is Coal washery
Total Area Excavated (in hectare) 0
Total Area Backfilled after Excavation (in hectare) 0
Total Area Reclaimed (in hectare) 0
     18.      Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception:
S. No.Financial Year Sanctioned Capacity as per EC (MTPA)Sanctioned Capacity as per CTOSanctioned Capacity as per approved mining planActual Production Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA)
(1.)000000
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/ EIA/ 1619/ RA 026
(ii)Name of the EIA Consultant PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD
(iii)Address 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082
(iv)Mobile No. 9440677333
(v)Landline No. 0402311427
(vi)Email Id pelcpl@yahoo.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation Coal Mining
(ix)Validity of Accreditation 22 Jun 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPls Clarify a. what type of technology- specify whether it is heavy media bath or cyclone type. b. Hydrological study report from page-19 to page 51 shows it is a report of Paras power & Coal Benefication c. Whether ETP is constructed or not d. All 12 nos of parameters of National Ambient Air Quality Standard are not given in EIA report. d. ToR point no 2 -Why is not applicable e. Traffic assessment study and its impact on air quality during transportation of raw coal, washed coal. f. Whether any air pollution control equipments is installed before stack emission g. Land use details of Plant Area h. Annexures of RO Compliance ceritificate dated 8th February,2019 is not attached 11 Jun 2019
2.NAThe correction have been made as per the instruction received 10 Aug 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantPawan Agarwal
DesignationDirector
Name of Company (Applicant Name should not be given here)HIND ENERGY & COAL BENEFICIATION (INDIA) LTD.
AddressHind House, Sai Parisar Commercial Complex, Sh. Kant Verma Marg, Bilaspur