1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Hind Energy & Coal Benefication (India) Ltd. | (b)Name of the Company / Organisation | HIND ENERGY & COAL BENEFICIATION (INDIA) LTD. | (c)Registered Address | Hind House, Sai Parisar Commercial Complex,
Sh. Kant Verma Marg,
Bilaspur,,Bilaspur,Haryana-495001 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Pawan Agarwal | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Hind House, Sai Parisar Commercial Complex,
Sh. Kant Verma Marg,
Bilaspur,,Masturi,Bilaspur,Haryana-495001 | (d)Pin code | 495001 | (e)E-mail | hecb@hindenergy.com | (f)STD Code. | 7752(f)Telephone No. | 429681 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 2(a) Coal washeries
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/CG/CMIN/19226/1900 | (d)Master Proposal Number(Single Window) | SW/106433/2019 | (e)EAC concerned (for category A Projects only) | Coal Mining | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 48, 51, 55/2, 55/5, 55/6, 55/7, 62/1, 55/1, 55/3, | (b)Pincode | 495001 | (c)Bounded Latitudes (North) | | From | | Degree | 22.15717222 | Minutes | | Second | | From | | Degree | 82.34138889 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 22.16322778 | Minutes | | Second | | From | | Degree | 82.33861111 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 64-J 8 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 270 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 30 | (j)Seismic Zone | 1 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Chhattisgarh | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11015/364/2009.IA.II(M) | (c)Date of Issue of TOR | 23 Sep 2010 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 19 Jun 2012 | (c)Date of Issue of EC | 21 May 2014 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 05 Apr 2017 | Distance of Public Hearing Venue from the Proposed Project : | 1.0 |
| Middle School Area, | State : | Chhattisgarh | District : | Bilaspur | Tehsil : | Masturi | Village : | Hindadih |
| 123 | Pollution, Employment, Drinking water supply and CSR activities | Others | Additional Collectorate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | 3-34/2008(ENV)/4921 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 31 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Coal Washery (Dry to Wet) | 2.4 | 0 | 2.4 | Others | MTPA | Road,Rail | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Coal washery | 2.4 MTPA Dry Type Coal washery | 2.4 MTPA Wet Type Coal Washery | 2.4 MTPA Wet Type Coal Washery | Present proposal is only change in technology from Dry to Wet type | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Aug 2018 | (iv)Valid Upto | 27 Sep 2021 | (v)File No. | 4654/TS/CECB/2018 | (vi)Application No. | 1147080 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 12.0 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.5 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.45 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 2.4 | (c)Total quantity of raw material/fuel | 2.4 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Raw coal | 2.4 | Others | MTPA | Dipka, Gevra Coal Mines | Road | | 25 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2016 To 31 May 2016 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 38.7 | 18.1 | 38.7 | 60 | (2.) | PM10 | | Micro Gram per Meter Cube | 64.5 | 31.2 | 64.5 | 100 | (3.) | NOx | | Micro Gram per Meter Cube | 21.5 | 10.8 | 21.5 | 80 | (4.) | Others | CO | Micro Gram per Meter Cube | 675 | 385 | 675 | 2000 | (5.) | SO2 | | Micro Gram per Meter Cube | 19.8 | 10.5 | 19.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 7.8 | 7.1 | 6.5 | 8.5 | (2.) | TSS | | | mg/l | | 1.4 | 0.72 | 1 | 1.5 | (3.) | TDS | | | mg/l | | 451 | 264 | 500 | 2000 | (4.) | Heavy Metals | | Fe | mg/l | | 0.024 | 0.020 | 0.3 | 1.0 | (5.) | Total Hardness | | | mg/l | | 281 | 208 | 300 | 600 | (6.) | Chlorides | | | mg/l | | 230 | 132 | 250 | 1000 | (7.) | Fluoride | | | mg/l | | 0.7 | 0.33 | 1.0 | 1.5 | |
14.3. No. of Surface Water monitoring locations : 3 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.5 | 7.1 | A | (2.) | BOD | | mg/l | | 1.8 | 1.6 | A | (3.) | COD | | mg/l | | 6.5 | 5.9 | A | (4.) | Others | TDS | mg/l | | 147 | 128 | A | (5.) | DO | | mg/l | | 7.8 | 7.2 | A | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 63 | 45 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 55 | 32 | 70 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Kilogram per hectare | | 285 | 192 | (2.) | K(Potassium) | Kilogram per hectare | | 68.3 | 49.5 | (3.) | P(Phosphorus) | Kilogram per hectare | | 33.5 | 19.5 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 176 | 132 | (5.) | pH | | | 7.8 | 7.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 8.00 To 8.25 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.56 To 2.5 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 475 | 3.6 | Not Appliacble | Pipeline | | Intake Well | | 41st Meeting of Water Resource Department | 11 Oct 2017 | 567 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sanitary Waste Water | 20 | 20 | Dispersion trench | Others | Dispersion trench | 20 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 20 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 20 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Rejects | Others | Rejects | 0.72 | Tons | 50 | Road | | Others | will be used in Power Plant | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 19.8 | 0.480 | 0 | 19.81 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 38.7 | 0.48 | 1.9 | 40.7 | 60 | (3.) | NOx | | Microgram per Meter Cube | 21.5 | 0.480 | 19.8 | 41.4 | 80 | (4.) | PM10 | | Microgram per Meter Cube | 64.5 | 0.480 | 3.32 | 67.83 | 100 | (5.) | Others(Specify) | CO | Microgram per Meter Cube | 675 | 0.480 | 12.6 | 687.7 | 2000 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Coal Crusher | Diesel | 30 | 0.3 | PM10 | | 0.01 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2.0 | (b)Source | State Grid | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 250 | (e)Stack Height (in m) | 4 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 11.1 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 11.1 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 17530 | (b)Waste/Barren Land (ha.) | 3234.2 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 2135.2 | (e)Settlements (ha.) | 1444.4 | (f)Industrial (ha.) | 1287.4 | (g)Forest (ha.) | 5777.6 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 31408.800000000003 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 3.64 | | (2.) | Green belt | | 3.68 | | (3.) | Water Reservoir | | 0.2 | | (4.) | Others | Storage area | 2.59 | | (5.) | Built Up Area | | 0.98 | Parking | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | NA | 0 | Nil within 10 Km. radius | (2.) | Critically Polluted Area | NA | 0 | Nil within 10 Km. radius | (3.) | WLS | NA | 0 | Nil within 10 Km. radius | (4.) | NPA | NA | 0 | Nil within 10 Km. radius | (5.) | ESAs | NA | 0 | Nil within 10 Km. radius | (6.) | ESZs | NA | 0 | Nil within 10 Km. radius | (7.) | Wildlife Corridors | NA | 0 | Nil within 10 Km. radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | Bitkuli Reserve Forest | 0.5 | Reserve Forest | (2.) | Archaeological Sites | | NA | 0 | Nil within 10 Km. radius | (3.) | Defence Installations | | NA | 0 | Nil within 10 Km. radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 11.1 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | total land in possession | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Lilagarh river | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 3.3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 21 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 300 | (f)Total Manpower | 71 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 3.68 | 0 | 3.68 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 7500 | 0 | 7500 | (4.) | Funds Allocated | 75000 | 0 | 75000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For Coal Mining |
|
1. No. of Mineral(s) to be Mined : 1 |
---|
S. No. | Mineral(s) to be Mined | Major or Minor Mineral |
---|
(1.) | NA | Minor | |
|
2. | Mine Capacity in ROM (Run of Mine) | 2.4 MTPA (Present Proposal) | |
|
|
4. | Mining Plan: | (a)Approval Letter No. | NA | (b)Date of Approval | 11 Feb 2016 | (c)Approved Letter | Copy of Approved Letter | (d)Approved By State Mining and Geology Department | MoEF&CC | (e)Approved Mining Lease Area | 11.1 | (f)Approved Capacity | 2.4 | |
|
5. | Technical Details: | (a)Total Geological Reserves (Million Ton) | NA | (b)Mineable Reserves (Million Ton) | NA | (c)Extractable Reserves(Million Ton) | NA | (d)Percent(%) of Extraction | NA | (e)Grade of Coal /Ore /Mineral | NA | (f)Stripping Ratio | NA : NA | (g)Category of Gaseousness (Only for Coal Mining, Others may Write NA) | NA | (h)Average Gradient(Degree) | NA | (i)Mining Method | Opencast | (j)Life of Mine (Years) | NA | |
|
6. | Details of Beneficiations: | (a)Whether it is proposed to install beneficiation plant/Coal washery within the mining lease area | No | (b)Whether it is proposed to install crusher within the mining lease area | No | |
|
7. | Details of Seams: | (a)Whether details of seam applicable | No | |
|
8. | Details of Mining Lease: | (a)Mining Lease Area (in Hectare) | 11.1 | (b)Whether obtained Letter of Intent (LOI) from the state government ? | No | (i)Reason thereof | NA as Present proposal is Coal washery | (c)Whether Lease Deed Executed ? | No | (i)Reason thereof | NA as Present proposal is Coal washery | (d)Whether Lease Deed Renewed ? | No | (i)Reason thereof | NA as Present proposal is Coal washery | |
|
9. | OB (Over Burden) Management: | (a) Details of External Dumps: | (i)No. of OB Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | (v)No. of year back fill up | | (b) Details of Internal Dumps: | (i)No. of Internal Dumps | | (ii)Total Area (in Hectare) | | (iii)Height (in meter) | | (iv)Quantity (in Million Cubic meter) | | |
|
10. | Details of Topsoil Management: | (a)Quantity of Topsoil excavated during the entire life of the mine (in Million Cubic metre) | 0 | (b)Quantity of Topsoil proposed for utilization for reclamation during the entire life of the mine (in Million Cubic metre) | 0 | (c)Quantity of Topsoil proposed for utilization for other activities during the entire life of the mine (in Million Cubic metre) | 0 | |
|
11. | Details of Final Mine Void: | (a)Area (in Hectare) | | (b)Depth (in meter) | | (c)Volume (in Million Cubic meter) | | |
|
12. | Details of Quarry: | (a)Final Void of (hectare) at a Depth of meter which is Proposed to be Converted into a Water Body. | (b)Total Quarry Area (ha) | | |
|
13. | Details of Transportation: | (a)In Pit/Underground to Surface | 0 | (b)Surface to Siding/Loading | 0 | (c)Transportation / Conveyor Details | 0 | |
|
|
14. Details of Land Usage (Pre-Mining) |
---|
S. No. | LAND USE | Other LAND USE | WITHIN ML AREA (Hectare) | OUTSIDE ML AREA (Hectare) | TOTAL (Hectare) |
---|
(1.) | SURFACE WATER BODIES | | 0 | 0 | 0 | (2.) | WASTE LAND | | 0 | 0 | 0 | (3.) | AGRICULTURE LAND | | 0 | 0 | 0 | (4.) | GRAZING LAND | | 0 | 0 | 0 | (5.) | SETTLEMENTS | | 0 | 0 | 0 | (6.) | FOREST LAND | | 0 | 0 | 0 | |
TOTAL | 0 | 0 | 0 | |
|
15. Details of Land Usage (Post-Mining) |
---|
S. No. | LAND USE | Other LAND USE | Plantation (ha) | Water Body (ha) | Public Use (ha) | Undisturbed (ha) | Total |
---|
(1.) | EXCAVATION/QUARRY | | 0 | 0 | 0 | | 0 | (2.) | EXTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | (3.) | ROADS | | 0 | 0 | 0 | | 0 | (4.) | VIRGIN AREA | | 0 | 0 | 0 | | 0 | (5.) | TOP SOIL STORAGE | | 0 | 0 | 0 | | 0 | (6.) | BUILT UP AREA (COLONY/OFFICE) | | 0 | 0 | 0 | | 0 | (7.) | GREEN BELT | | 3.68 | 0 | 0 | | 3.68 | (8.) | INTERNAL OB DUMPS | | 0 | 0 | 0 | | 0 | |
TOTAL | 3.68 | 0 | 0 | 0 | 3.68 | |
16. | Details of Reclamation: | Total Afforestation Plan shall be Implemented Covering of Mining.This will Include: | (a)External OB Dump(in hectare) | 0 | (b)Internal Dump(in hectare) | 0 | (c)Quarry(in hectare) | 0 | (d)Safety Zone(in hectare) | 0 | (e)Final Void of 0 (hectare) at a Depth of 0 meter which is Proposed to be Converted into a Water Body. | (f)Density of Tree Plantation per ha (in no.) | 0 | (g)Others in ha (such as Excavation Area along ML Boundary, along Roads and Infrastructure, Embankment Area and in Township Located Outside the Lease etc) | 0 | (h)Total afforestation plant (in hectare) | 0 | |
|
17. | Status of progressive Mining Closure Plan: | Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan | Copy of Implementation of Various Activities as per Approved Progressive Mine Closure Plan | Any Deviation from the Approved Progressive Mine Closure Plan | NA as Present proposal is Coal washery | Total Area Excavated (in hectare) | 0 | Total Area Backfilled after Excavation (in hectare) | 0 | Total Area Reclaimed (in hectare) | 0 | |
|
18. Details of Actual Coal/ ORE Production vis-a-vis Sanctioned Capacity since the Inception: |
---|
S. No. | Financial Year | Sanctioned Capacity as per EC (MTPA) | Sanctioned Capacity as per CTO | Sanctioned Capacity as per approved mining plan | Actual Production | Excess Production Beyond the EC / CTO/ Mining Plan Sanctioned Capacity (MTPA) |
---|
(1.) | 0 | 0 | 0 | 0 | 0 | 0 | |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/ EIA/ 1619/ RA 026 | (ii)Name of the EIA Consultant | PIONEER ENVIRO LABORATORIES & CONSULTANTS PVT. LTD | (iii)Address | 6-3-652, Flat # 7-3, Dhruvatara Apartments, Amrutha Estates, Erramanjil, Somajiguda, Hyderabad- 500082 | (iv)Mobile No. | 9440677333 | (v)Landline No. | 0402311427 | (vi)Email Id | pelcpl@yahoo.co.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Coal Mining | (ix)Validity of Accreditation | 22 Jun 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Pls Clarify
a. what type of technology- specify whether it is heavy media bath or cyclone type.
b. Hydrological study report from page-19 to page 51 shows it is a report of Paras power & Coal Benefication
c. Whether ETP is constructed or not
d. All 12 nos of parameters of National Ambient Air Quality Standard are not given in EIA report.
d. ToR point no 2 -Why is not applicable
e. Traffic assessment study and its impact on air quality during transportation of raw coal, washed coal.
f. Whether any air pollution control equipments is installed before stack emission
g. Land use details of Plant Area
h. Annexures of RO Compliance ceritificate dated 8th February,2019 is not attached | 11 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 10 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Pawan Agarwal | Designation | Director | Name of Company (Applicant Name should not be given here) | HIND ENERGY & COAL BENEFICIATION (INDIA) LTD. | Address | Hind House, Sai Parisar Commercial Complex,
Sh. Kant Verma Marg,
Bilaspur |
|