Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) US Amino Pvt. Ltd.
(b)Name of the Company / Organisation US AMINO PVT LTD
(c)Registered Address kHASRA 588, VILLAGE- LADANA, TEH- MAVLI, DIST- UDAIPUR,,Udaipur,Rajasthan-313205
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant NITIN KUMAWAT
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address KHASRA NO 588, VILLAGE- LADANA, TEH- MAVLI, DIST- UDAIPUR,,Mavli,Udaipur,Rajasthan-313205
(d)Pin code 313205
(e)E-mail info.wcs@wolkem.com
(f)STD Code. 294(f)Telephone No. 2494602
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/RJ/IND2/106376/2017
(d)Master Proposal Number(Single Window) SW/106371/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 588
(b)Pincode 313203
(c)Bounded Latitudes (North)
From
Degree 244739.35
Minutes
Second
From
Degree 244824.48
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 740221.58
Minutes
Second
From
Degree 740332.51
Minutes
Second
(e)Survey of India Topo Sheet No. 45H/13, 45 H/14, 45 L/1, 45 L/21
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 479
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.538
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Rajasthan
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/542/2017-IA-II(I)
(c)Date of Issue of TOR 26 Dec 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 13 Aug 2019
(c)Date of Issue of EC 18 Jun 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Feb 2019
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :25 Mar 2019
Distance of Public Hearing Venue from the Proposed Project :5.5
Lok Seva Kendra, Nagar Palika Faethnagar Sanwar, Udaipu
State :Rajasthan
District :Udaipur
Tehsil :Mavli
Village :Nagar Palika,Fatehnagar Sanwar
44Harmful effect on environment from this project, Employment apportunities, no bad effect on crops and agriculture land.OthersAdditional District Collector
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. F(Tech)/Udaipur(Mavli)/2561(1)/2015-2016/1808-1809
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 1 2018 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Methotrexate066Tons per Annum(TPA)Road
(2.)Telmisartan01212Tons per Annum(TPA)Road
(3.)Sucralfate066Tons per Annum(TPA)Road
(4.)Arteemether066Tons per Annum(TPA)Road
(5.)Arteether066Tons per Annum(TPA)Road
(6.)Rosuvastatin Calcium02.42.4Tons per Annum(TPA)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Total Plot Area4129 Sq.m.04129 Sq.m.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 31 Mar 2017
(iv)Valid Upto 31 Oct 2021
(v)File No. F(Tech)/Udaipur(Mavli)/2561(1)/2015-2016/1808-1809
(vi)Application No. 65122
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 0.85
(b) Funds Allocated for Environment Management (Capital) (in Crores) 0.0050
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.0750
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.0130
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 38.4
(b)Existing quantity of raw material/fuel 372
(c)Total quantity of raw material/fuel 410.4
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Methoxatrate ester4.76Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(2.)Acetone0.74Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(3.)Methylene Di Chloride6.72Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(4.)HCl (10 %)0.48Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(5.)MIBK28.8Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(6.)Sucrose1.2Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(7.)Methylene Chloride69Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(8.)Sodium hydroxide12.72Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(9.)Ethanol19.98Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(10.)Sodium boro hydride1.86Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(11.)Dl Hydromisnin13.32Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(12.)NaOH14.4Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(13.)Acetic Acid7.2Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(14.)Rosuvasatatin Ester3.43Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(15.)Potassium Hydroxide9.12Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(16.)Pyridine (Reagent)0.15Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(17.)HCl12.79Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
(18.)Methanol13.28Tons per AnnumNearby MarketRoad20 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Mar 2018
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube72.6349.971.62100
(2.)SO2Micro Gram per Meter Cube11.38.110.8480
(3.)NOxMicro Gram per Meter Cube25.0514.0224.5480
(4.)PM2.5Micro Gram per Meter Cube39.9721.439.3560
(5.)OtherscoMicro Gram per Meter Cube0.850.180.854
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Heavy MetalsLeadmg/l0.010.010.0010.001
(2.)TSSmg/l0000
(3.)pHNA7.646.956.58.5
(4.)Total Hardnessmg/l924192200600
(5.)TDSmg/l24323545002000
(6.)Fluoridemg/l1.40.611.5
(7.)Chloridesmg/l675262501000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)OthersTDSmg/l902482D
(2.)BODmg/l00D
(3.)CODmg/l00D
(4.)DOmg/l5.65.1D
(5.)pHNA7.547.40D
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))59.536.975
(2.)Leq(Night)A-weighted decibels(dB(A))41.132.070
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Percent0.0020.0012
(2.)Electric ConductivityMillisiemens per Centimetre602452.33
(3.)pH8.267.25
(4.)K(Potassium)Percent0.00590.0041
(5.)N(Nitrogen)Percent0.00620.0041
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 24 To 4.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 20 To 4
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersTanker Water Supply8.010Copy of Permission LettermodeOthersTankerOthersTanker WAterNil10 Aug 20190
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial3.74.5ETPReuse within the Plant & Recycling3.7
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3.7
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3.7
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded BarrelsHazardous Waste (as per Hazardous and Other Waste Management rules 2016)10Kilolitre1RoadAuthorized Recyclers
(2.)Rice Husk briquettes ashIndustrial Waste45.6Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
(3.)Process ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.6Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
(4.)Used OilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.6Kilolitre1RoadAuthorized Recyclers
(5.)ETP SludgeHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9Tons1RoadTreatment, Storage and Disposal Facility(TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000.1100
(2.)NOxMicrogram per Meter Cube25.056005.63180
(3.)PM10Microgram per Meter Cube72.668007.881100
(4.)SO2Microgram per Meter Cube11.35993.715.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel120.4NOxSO0.011
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60
(b)Source Ajmer Vidyut Vitran Nigam
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) No DG set is proposed in proposed project
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0.4129
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 0.4129
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 2.2605
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0.3047
(d)Surface Water Bodies (ha.) 0.0471
(e)Settlements (ha.) 0.0679
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Open scrub land and Fellow land 0.8724
    Total (ha.) 3.5525999999999995
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Green belt0.3017
(2.)Main Plant0.0615
(3.)OthersRoads and Open area0.0497
Total (ha.) 0.4129
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNone00
(2.)Critically Polluted AreaNone00
(3.)ESZsNone00
(4.)CorridorsNone00
(5.)WLSNone00
(6.)NPANone00
(7.)Wildlife CorridorsNone00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNone00
(2.)Defence InstallationsNone00
(3.)Archaeological SitesNone00
(4.)OthersNoneNone00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.4129
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Berach River
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 9.50
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 12
(b)Permanent Employment-During Operation 8
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 20
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)No. of Plants100100200
(2.)Percentage of Total Project Area3637.173.1
(3.)Funds Allocated5000050000100000
(4.)Total Area of Green Belt148615313017
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalApprox 73.1 % of the total Plot area is well developed as green belt/ plantation.Trees improve our air quality by filtering harmful dust and pollutants such as ozone, carbon monoxide, and sulfur dioxide from the air we breathe.Trees reduce the amount of storm water runoff, which reduces erosion and pollution in our waterways and may reduce the effects of flooding.
(2.)FinancialProposed project has a potential for employment of skilled, semi-skilled and unskilled manpower during construction as well as operational phase
(3.)SocialSocial Infrastructure will be improved by means of civilization, vocational training and basic amenties.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 163
(ii)Name of the EIA Consultant Wolkem India Limited
(iii)Address Wolkem House, P.O. Box No. -21 E-101-102, Mewar Industrial Area (Madri), Udaipur, Rajasthanr
(iv)Mobile No. 0941555052
(v)Landline No. 0294249460
(vi)Email Id om.shukla@wolkem.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Apr 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - As per the CTO dated 31/3/2017, unit is engaged in production of bulk drugs @372 TPM. EC and the compliance status thereof. - In such a case, the proposal should be for expansion of the unit and needs to be revised accordingly. - Total fresh water and the fuel consumption per day. 04 Aug 2019
2.NAThe correction have been made as per the instruction received 13 Aug 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1. ADS Reply LetterADS reply as per MOM of 12th EAC meeting. 25 Feb 2020
2.NA