1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | US Amino Pvt. Ltd. | (b)Name of the Company / Organisation | US AMINO PVT LTD | (c)Registered Address | kHASRA 588, VILLAGE- LADANA, TEH- MAVLI, DIST- UDAIPUR,,Udaipur,Rajasthan-313205 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | NITIN KUMAWAT | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | KHASRA NO 588, VILLAGE- LADANA, TEH- MAVLI, DIST- UDAIPUR,,Mavli,Udaipur,Rajasthan-313205 | (d)Pin code | 313205 | (e)E-mail | info.wcs@wolkem.com | (f)STD Code. | 294(f)Telephone No. | 2494602 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/RJ/IND2/106376/2017 | (d)Master Proposal Number(Single Window) | SW/106371/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 588 | (b)Pincode | 313203 | (c)Bounded Latitudes (North) | | From | | Degree | 244739.35 | Minutes | | Second | | From | | Degree | 244824.48 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 740221.58 | Minutes | | Second | | From | | Degree | 740332.51 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45H/13, 45 H/14, 45 L/1, 45 L/21 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 479 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0.538 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/542/2017-IA-II(I) | (c)Date of Issue of TOR | 26 Dec 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 13 Aug 2019 | (c)Date of Issue of EC | 18 Jun 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 25 Mar 2019 | Distance of Public Hearing Venue from the Proposed Project : | 5.5 |
| Lok Seva Kendra, Nagar Palika Faethnagar Sanwar, Udaipu | State : | Rajasthan | District : | Udaipur | Tehsil : | Mavli | Village : | Nagar Palika,Fatehnagar Sanwar |
| 44 | Harmful effect on environment from this project, Employment apportunities, no bad effect on crops and agriculture land. | Others | Additional District Collector | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | F(Tech)/Udaipur(Mavli)/2561(1)/2015-2016/1808-1809 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 1 2018 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Methotrexate | 0 | 6 | 6 | Tons per Annum(TPA) | | Road | | (2.) | Telmisartan | 0 | 12 | 12 | Tons per Annum(TPA) | | Road | | (3.) | Sucralfate | 0 | 6 | 6 | Tons per Annum(TPA) | | Road | | (4.) | Arteemether | 0 | 6 | 6 | Tons per Annum(TPA) | | Road | | (5.) | Arteether | 0 | 6 | 6 | Tons per Annum(TPA) | | Road | | (6.) | Rosuvastatin Calcium | 0 | 2.4 | 2.4 | Tons per Annum(TPA) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Total Plot Area | 4129 Sq.m. | 0 | 4129 Sq.m. | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 31 Mar 2017 | (iv)Valid Upto | 31 Oct 2021 | (v)File No. | F(Tech)/Udaipur(Mavli)/2561(1)/2015-2016/1808-1809 | (vi)Application No. | 65122 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 0.85 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.0050 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.0750 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.0130 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 38.4 | (b)Existing quantity of raw material/fuel | 372 | (c)Total quantity of raw material/fuel | 410.4 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Methoxatrate ester | 4.76 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (2.) | Acetone | 0.74 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (3.) | Methylene Di Chloride | 6.72 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (4.) | HCl (10 %) | 0.48 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (5.) | MIBK | 28.8 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (6.) | Sucrose | 1.2 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (7.) | Methylene Chloride | 69 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (8.) | Sodium hydroxide | 12.72 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (9.) | Ethanol | 19.98 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (10.) | Sodium boro hydride | 1.86 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (11.) | Dl Hydromisnin | 13.32 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (12.) | NaOH | 14.4 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (13.) | Acetic Acid | 7.2 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (14.) | Rosuvasatatin Ester | 3.43 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (15.) | Potassium Hydroxide | 9.12 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (16.) | Pyridine (Reagent) | 0.15 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (17.) | HCl | 12.79 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | (18.) | Methanol | 13.28 | Tons per Annum | | Nearby Market | Road | | 20 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2018 To 31 Mar 2018 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 72.63 | 49.9 | 71.62 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 11.3 | 8.1 | 10.84 | 80 | (3.) | NOx | | Micro Gram per Meter Cube | 25.05 | 14.02 | 24.54 | 80 | (4.) | PM2.5 | | Micro Gram per Meter Cube | 39.97 | 21.4 | 39.35 | 60 | (5.) | Others | co | Micro Gram per Meter Cube | 0.85 | 0.18 | 0.85 | 4 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Heavy Metals | | Lead | mg/l | | 0.01 | 0.01 | 0.001 | 0.001 | (2.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (3.) | pH | | | NA | | 7.64 | 6.95 | 6.5 | 8.5 | (4.) | Total Hardness | | | mg/l | | 924 | 192 | 200 | 600 | (5.) | TDS | | | mg/l | | 2432 | 354 | 500 | 2000 | (6.) | Fluoride | | | mg/l | | 1.4 | 0.6 | 1 | 1.5 | (7.) | Chlorides | | | mg/l | | 675 | 26 | 250 | 1000 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | Others | TDS | mg/l | | 902 | 482 | D | (2.) | BOD | | mg/l | | 0 | 0 | D | (3.) | COD | | mg/l | | 0 | 0 | D | (4.) | DO | | mg/l | | 5.6 | 5.1 | D | (5.) | pH | | NA | | 7.54 | 7.40 | D | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 59.5 | 36.9 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 41.1 | 32.0 | 70 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Percent | | 0.002 | 0.0012 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 602 | 452.33 | (3.) | pH | | | 8.26 | 7.25 | (4.) | K(Potassium) | Percent | | 0.0059 | 0.0041 | (5.) | N(Nitrogen) | Percent | | 0.0062 | 0.0041 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 24 To 4.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 20 To 4 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Tanker Water Supply | 8.0 | 10 | Copy of Permission Letter | modeOthers | Tanker | Others | Tanker WAter | Nil | 10 Aug 2019 | 0 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 3.7 | 4.5 | ETP | Reuse within the Plant & Recycling | | 3.7 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 3.7 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 3.7 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded Barrels | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 10 | Kilolitre | 1 | Road | | Authorized Recyclers | | (2.) | Rice Husk briquettes ash | Industrial Waste | | 45.6 | Tons | 1 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (3.) | Process Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.6 | Tons | 1 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (4.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.6 | Kilolitre | 1 | Road | | Authorized Recyclers | | (5.) | ETP Sludge | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 9 | Tons | 1 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 100 | (2.) | NOx | | Microgram per Meter Cube | 25.05 | 600 | 5.6 | 31 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 72.66 | 800 | 7.8 | 81 | 100 | (4.) | SO2 | | Microgram per Meter Cube | 11.3 | 599 | 3.7 | 15.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 12 | 0.4 | NOx | SO | 0.011 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60 | (b)Source | Ajmer Vidyut Vitran Nigam | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | No DG set is proposed in proposed project | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.4129 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.4129 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 2.2605 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0.3047 | (d)Surface Water Bodies (ha.) | 0.0471 | (e)Settlements (ha.) | 0.0679 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Open scrub land and Fellow land | 0.8724 | Total (ha.) | 3.5525999999999995 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 0.3017 | | (2.) | Main Plant | | 0.0615 | | (3.) | Others | Roads and Open area | 0.0497 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | ESAs | None | 0 | 0 | (2.) | Critically Polluted Area | None | 0 | 0 | (3.) | ESZs | None | 0 | 0 | (4.) | Corridors | None | 0 | 0 | (5.) | WLS | None | 0 | 0 | (6.) | NPA | None | 0 | 0 | (7.) | Wildlife Corridors | None | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | None | 0 | 0 | (2.) | Defence Installations | | None | 0 | 0 | (3.) | Archaeological Sites | | None | 0 | 0 | (4.) | Others | None | None | 0 | 0 | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.4129 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Berach River | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 9.50 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 12 | (b)Permanent Employment-During Operation | 8 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 20 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | No. of Plants | 100 | 100 | 200 | (2.) | Percentage of Total Project Area | 36 | 37.1 | 73.1 | (3.) | Funds Allocated | 50000 | 50000 | 100000 | (4.) | Total Area of Green Belt | 1486 | 1531 | 3017 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Approx 73.1 % of the total Plot area is well developed as green belt/ plantation.Trees improve our air quality by filtering harmful dust and pollutants such as ozone, carbon monoxide, and sulfur dioxide from the air we breathe.Trees reduce the amount of storm water runoff, which reduces erosion and pollution in our waterways and may reduce the effects of flooding. | (2.) | Financial | Proposed project has a potential for employment of skilled, semi-skilled and unskilled manpower during construction as well as operational phase | (3.) | Social | Social Infrastructure will be improved by means of civilization, vocational training and basic amenties. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 163 | (ii)Name of the EIA Consultant | Wolkem India Limited | (iii)Address | Wolkem House, P.O. Box No. -21 E-101-102, Mewar Industrial Area (Madri), Udaipur, Rajasthanr | (iv)Mobile No. | 0941555052 | (v)Landline No. | 0294249460 | (vi)Email Id | om.shukla@wolkem.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 19 Apr 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- As per the CTO dated 31/3/2017, unit is engaged in production of bulk drugs @372 TPM. EC and the compliance status thereof.
- In such a case, the proposal should be for expansion of the unit and needs to be revised accordingly.
- Total fresh water and the fuel consumption per day. | 04 Aug 2019 | 2. | NA | The correction have been made as per the instruction received | 13 Aug 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | ADS Reply Letter | ADS reply as per MOM of 12th EAC meeting. | 25 Feb 2020 | 2. | NA | |
|