1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Modernization of Ammonia and Urea plants | (b)Name of the Company / Organisation | SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LIMITED | (c)Registered Address | Spic nagar, Mullakadu village, Thoothukudi Taluka, Tutikorin District, Tamil nadu,,Thoothukkudi,Tamil Nadu-628005 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | spic spic spic | (b)Designation (Owner/ Partner/ CEO) | director | (c)Address | Spic nagar, Mullakadu village, thoothukudi taluka, Tutikorin dictrict,,Thoothukkudi,Thoothukkudi,Tamil Nadu-628005 | (d)Pin code | 628005 | (e)E-mail | spicexpansion@gmail.com | (f)STD Code. | 461(f)Telephone No. | 2355401 | (g)Fax No. | 2355588 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(a) Chemical fertilizers
| Minor Activity | 5(a) Chemical fertilizers
| (b)Category | A | (c)Proposal Number | IA/TN/IND2/106298/2019 | (d)Master Proposal Number(Single Window) | SW/106296/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Modernization under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 426/2,427/2,428,429/3A,431/2, 432/2, 433,4 | (b)Pincode | 628005 | (c)Bounded Latitudes (North) | | From | | Degree | 84419 | Minutes | | Second | | From | | Degree | 84422 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78824 | Minutes | | Second | | From | | Degree | 78850 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 58L/1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 4.3 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 7 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Tamil Nadu | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | MoEF letter dated 31.07.2019 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 14 2014 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Urea - Neem Coated | 620400 | 138800 | 759200 | Tons per Annum(TPA) | | Road,Rail | | (2.) | Carbon-dioxide | 642000 | 42375 | 684375 | Tons per Annum(TPA) | | Others | Inhouse | (3.) | Ammonia | 420000 | 127500 | 547500 | Tons per Annum(TPA) | | Others | Inhouse | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | HRSG | 0 | 25MW | 25MW | 1no | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 25 Jun 2019 | (iv)Valid Upto | 31 Mar 2020 | (v)File No. | 190818433925/190828433925 | (vi)Application No. | T1/TNPCB/F.0044TTN/RL/TTN/W/2019 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 364 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 18.2 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.7 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.7 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 455638 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 455638 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | naphtha | 298368 | Tons per Annum | | Imports | Road,Others | Seaways | 10 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 1 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1 To 1 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | pipeline from TWAD | 15178 | 6 | Not Appliacble | Pipeline | | Others | Supplied through pipeline | Nil | 04 Dec 2006 | 25000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Effluent | 2160 | 2160 | ETP | Discharge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant | | 1440 | 720 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2160 | (b)Total Discharged Water (Kilolitre per Day) | 720 | (c)Total Reused Water (Kilolitre per Day) | 1440 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 30 | Kilolitre | 0 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 76 | 1 | 7.38 | 83.39 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 45 | 1 | 4.4 | 49.43 | 60 | (3.) | SO2 | | Microgram per Meter Cube | 0 | 1 | 0 | 0.1 | 60 | (4.) | NOx | | Microgram per Meter Cube | 0 | 1 | 0 | 0.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Prilling tower | urea dust | 52 | 14.9 | PM10 | | 7.39 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 17000 | (b)Source | TNEB | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1100 KVA + 800 KVA+500 KVA | (e)Stack Height (in m) | 8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 47.11 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 47.11 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 47.11 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : 0 | 0 | Total (ha.) | 47.11 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 0 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Corridors | - | 15 | - | (2.) | ESZs | nil | 15 | nil | (3.) | NPA | nil | 15 | nil | (4.) | WLS | Gulf of mannar | 15 | Nil | (5.) | ESAs | nil | 15 | nil | (6.) | Critically Polluted Area | nil | 15 | nil | (7.) | Wildlife Corridors | - | 15 | - | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | - | 0 | - | (2.) | Defence Installations | | - | 0 | - | (3.) | Archaeological Sites | | - | 0 | - | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 5 | (f)Total Manpower | 0 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 157591 | 0 | 157591 | (2.) | Percentage of Total Project Area | 33.4 | 0 | 33.4 | (3.) | Funds Allocated | 300000 | 300000 | 600000 | (4.) | No. of Plants | 6250 | 500 | 6750 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | 1. The Plant is getting switched over to Natural Gas which is much cleaner Fuel compared to Naphtha
2.Substantial reduction in energy consumption
3. Out of existing three oil fired boilers, two of them will be stopped. Thus, after Modernization , emission level and energy consumption will become drastically low by implementing the advanced technologies. The CO2 reduction from the boilers will get reduced by ~50% and SO2 emission is reduced by over 95%.
4.This project does not require any add | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | No | (i)Reason for not Hiring the Consultant | The proposal is a modernization of the existing unit under 7.II.a of EIA notification dated 23.11.20 | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | No annexures with the letter dated 23/5/2019. Please submit the same. | 05 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 06 Jun 2019 | 3. | NA | Proposal is to be submitted along with the fresh CCR for the existing ECs including that dated 20/5/2019 after the bifurcation, from the Regional Office the Ministry. | 16 Jun 2019 | 4. | NA | The correction have been made as per the instruction received | 31 Jul 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | spic spic spic | Designation | director | Name of Company (Applicant Name should not be given here) | SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LIMITED | Address | Spic nagar, Mullakadu village, Thoothukudi Taluka, Tutikorin District, Tamil nadu |
|