(a)Name of the project(s) Modernization of Ammonia and Urea plants
(b)Name of the Company / Organisation SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LIMITED
(c)Registered Address Spic nagar, Mullakadu village, Thoothukudi Taluka, Tutikorin District, Tamil nadu,,Thoothukkudi,Tamil Nadu-628005
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant spic spic spic
(b)Designation (Owner/ Partner/ CEO) director
(c)Address Spic nagar, Mullakadu village, thoothukudi taluka, Tutikorin dictrict,,Thoothukkudi,Thoothukkudi,Tamil Nadu-628005
(d)Pin code 628005
(e)E-mail spicexpansion@gmail.com
(f)STD Code. 461(f)Telephone No. 2355401
(g)Fax No. 2355588
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(a) Chemical fertilizers
Minor Activity5(a) Chemical fertilizers
(b)Category A
(c)Proposal Number IA/TN/IND2/106298/2019
(d)Master Proposal Number(Single Window) SW/106296/2019
(e)EAC concerned (for category A Projects only) NIL
(f)Project Type Modernization under para 7(ii)
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 426/2,427/2,428,429/3A,431/2, 432/2, 433,4
(b)Pincode 628005
(c)Bounded Latitudes (North)
From
Degree 84419
Minutes
Second
From
Degree 84422
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78824
Minutes
Second
From
Degree 78850
Minutes
Second
(e)Survey of India Topo Sheet No. 58L/1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 4.3
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 7
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Tamil Nadu
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC: Not Applicable
4.
Whether the Project Exempted from Public Hearing? Details Not Applicable
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. MoEF letter dated 31.07.2019
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 14 2014 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Urea - Neem Coated620400138800759200Tons per Annum(TPA)Road,Rail
(2.)Carbon-dioxide64200042375684375Tons per Annum(TPA)OthersInhouse
(3.)Ammonia420000127500547500Tons per Annum(TPA)OthersInhouse
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)HRSG025MW25MW1no
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 25 Jun 2019
(iv)Valid Upto 31 Mar 2020
(v)File No. 190818433925/190828433925
(vi)Application No. T1/TNPCB/F.0044TTN/RL/TTN/W/2019
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 364
(b) Funds Allocated for Environment Management (Capital) (in Crores) 18.2
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 2.7
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 2.7
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 455638
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 455638
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)naphtha298368Tons per AnnumImportsRoad,OthersSeaways10 Open MarketCopy of Linkage
16.
Baseline Data Not Applicable
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 1
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1 To 1
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Otherspipeline from TWAD151786 Not Appliacble PipelineOthersSupplied through pipelineNil04 Dec 200625000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Effluent21602160ETPDischarge into Seawater Body,Reuse within the Plant & Recycling,Green Belt Renewal Plant1440720
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2160
(b)Total Discharged Water (Kilolitre per Day) 720
(c)Total Reused Water (Kilolitre per Day) 1440
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)used oilHazardous Waste (as per Hazardous and Other Waste Management rules 2016)30Kilolitre0RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube7617.3883.39100
(2.)PM2.5Microgram per Meter Cube4514.449.4360
(3.)SO2Microgram per Meter Cube0100.160
(4.)NOxMicrogram per Meter Cube0100.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)Prilling towerurea dust5214.9PM107.39
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 17000
(b)Source TNEB
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1100 KVA + 800 KVA+500 KVA
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 47.11
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 47.11
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 47.11
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : 0 0
    Total (ha.) 47.11
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0
Total (ha.) 0
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Corridors-15-
(2.)ESZsnil15nil
(3.)NPAnil15nil
(4.)WLSGulf of mannar15Nil
(5.)ESAsnil15nil
(6.)Critically Polluted Areanil15nil
(7.)Wildlife Corridors-15-
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Forest-0-
(2.)Defence Installations-0-
(3.)Archaeological Sites-0-
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 0
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 0
(e)No. of working days 5
(f)Total Manpower 0
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt1575910157591
(2.)Percentage of Total Project Area33.4033.4
(3.)Funds Allocated300000300000600000
(4.)No. of Plants62505006750
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental1. The Plant is getting switched over to Natural Gas which is much cleaner Fuel compared to Naphtha 2.Substantial reduction in energy consumption 3. Out of existing three oil fired boilers, two of them will be stopped. Thus, after Modernization , emission level and energy consumption will become drastically low by implementing the advanced technologies. The CO2 reduction from the boilers will get reduced by ~50% and SO2 emission is reduced by over 95%. 4.This project does not require any add
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? No
(i)Reason for not Hiring the Consultant The proposal is a modernization of the existing unit under 7.II.a of EIA notification dated 23.11.20
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NANo annexures with the letter dated 23/5/2019. Please submit the same. 05 Jun 2019
2.NAThe correction have been made as per the instruction received 06 Jun 2019
3.NAProposal is to be submitted along with the fresh CCR for the existing ECs including that dated 20/5/2019 after the bifurcation, from the Regional Office the Ministry. 16 Jun 2019
4.NAThe correction have been made as per the instruction received 31 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of Applicantspic spic spic
Designationdirector
Name of Company (Applicant Name should not be given here)SOUTHERN PETROCHEMICAL INDUSTRIES CORPORATION LIMITED
AddressSpic nagar, Mullakadu village, Thoothukudi Taluka, Tutikorin District, Tamil nadu
Print