Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) EXPANSION OF DISTILLERY CAPACITY FROM 60 KLPD TO 180 KLPD AND 2 MW/HR CAPTIVE STEAM BASED POWER GENERATION TO 9 MW/HR COGENERATION UNIT BY M/s Indian Cane Power Limited (Unit : Samsons Distilleries)
(b)Name of the Company / Organisation M/S INDIAN CANE POWER LIMITED (UNIT: SAMSONS DISTILLERIES)
(c)Registered Address Sy No 233 & other Duggavatti Village , Harapanahalli Taluk, Bellary Dist, Karnataka,,Bellary,Karnataka-583137
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Aratole S Niranjan
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address M/s Indian Cane Power limited, unit-Samsons Distilleries, 627, Anekonda Bellary,,Harapanahalli,Davanagere,Karnataka-577001
(d)Pin code 577001
(e)E-mail samsondistillery2019@gmail.com
(f)STD Code. 8192(f)Telephone No. 275144
(g)Fax No. 08192275039
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category B2
   Reason for Applying at Ministry Other
   Other Reason for Applying at Ministry Not applicable as per the Gazette notification SO345(E) dated 17-01-2019
(c)Proposal Number IA/KA/IND2/106218/2001
(d)Master Proposal Number(Single Window) SW/213682/2021
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Sy No 233 & other Survey nos., Duggavathi village
(b)Pincode 577001
(c)Bounded Latitudes (North)
From
Degree 14.62
Minutes
Second
From
Degree 14.63
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.84
Minutes
Second
From
Degree 75.84
Minutes
Second
(e)Survey of India Topo Sheet No. 48N/14 48N/10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 560
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 2.9
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Karnataka
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number J-11011/9/2007-IA-II (I)
(c)Date of Issue of TOR 01 Jan 1900
(f)Previous TOR Letter Copy of Previous TOR letter
(b)Date of Apply of EC 25 Jun 2019
(c)Date of Issue of EC 08 Jan 2020
(d)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? No
(c)Reason Not applicable as per the Gazette notification SO345(E) dated 17-01-2019
(d)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By Regional
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on Bangalore
(iii)Letter No. J-11011/83/2001-IA II (I)
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Jan 2 2019 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Distillery60120180Kilo Litre per Day(KLD)Road
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)Distillery60120180KLPD60 KLPD to 180 KLPD and from 2 Mw/hr to 9 MW/hr captive steam based power generation.
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 30 Dec 2016
(iv)Valid Upto 30 Jun 2021
(v)File No. AW-301780
(vi)Application No. AW-301780
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 154.68
(b) Funds Allocated for Environment Management (Capital) (in Crores) 6.02
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.16
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.42
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 112500
(b)Existing quantity of raw material/fuel 72000
(c)Total quantity of raw material/fuel 184500
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Urea36Tons per AnnummumbaiRoad584 LinkageCopy of Linkage
(2.)Molasses112500Tons per AnnumICPL, UtturRoad193 LinkageCopy of Linkage
(3.)Turkey red oil18Tons per AnnummumbaiRoad584 LinkageCopy of Linkage
(4.)Sulphuric Acid18Kilo Litre per DayMumbaiRoad584 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 02 Oct 2018 To 31 Dec 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube100100
(2.)SO2Micro Gram per Meter Cube100100
(3.)PM10Micro Gram per Meter Cube100100
(4.)NOxMicro Gram per Meter Cube100100
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA0000
(2.)Total HardnessNA0000
(3.)FluorideNA0000
(4.)Heavy MetalsironNA0000
(5.)TSSNA0000
(6.)TDSNA0000
(7.)ChloridesNA0000
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00A
(2.)BODNA00B
(3.)CODNA00A
(4.)DONA00A
    14.4.     No. of Ambient Noise monitoring locations : 0
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))000
(2.)Leq(Night)A-weighted decibels(dB(A))000
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)00
(2.)P(Phosphorus)00
(3.)K(Potassium)00
(4.)pH00
(5.)Electric Conductivity00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 2 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 4 To 6
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface11403Copy of Permission LetterPipelineJack Well1103/328 Sep 20171500
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)condensate, BBD, CTBD, Spentlees12491250Condensate polishing unitOthersZLD12490
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 1249
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 1249
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Boiler AshIndustrial Waste11520Tons2RoadOthersBrick Manufacturing
(2.)Yeast sludgeIndustrial Waste3600Tons0RoadOthersUsed in compost plant and used as bio manure
(3.)Sludge from CPUIndustrial Waste9Tons0RoadOthersUsed in compost plant and used as bio manure
(4.)Used oil from DG setHazardous Waste (as per Hazardous and Other Waste Management rules 2016)0.5Kilolitre0RoadOthersUsed as lubricants
(5.)Domestic solid wasteMunicipal Solid Waste12Tons2RoadOthersNearby municipal agencies & recyclers.
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube1011.1120
(2.)PM2.5Microgram per Meter Cube1011.1120
(3.)SO2Microgram per Meter Cube1011.1120
(4.)NOxMicrogram per Meter Cube1011.1120
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)bolierslop852.8PM1020
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 3000
(b)Source Captive
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1000
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 186.55
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 186.55
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 0
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : as per the Gazette notification SO345(E) dated 17- 0
    Total (ha.) 0
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant16.2
(2.)Green belt121.4
(3.)OthersRoad and open area48.96
Total (ha.) 186.56
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSRenebennur Blackbuck sanctuary6.8Protected Area
(2.)Critically Polluted Area000
(3.)NPA000
(4.)ESAs000
(5.)ESZs000
(6.)Corridors000
(7.)Wildlife Corridors000
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence Installations000
(2.)Archaeological Sites000
(3.)ForestAligilwada Reserve forest1.4forest
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 186.55
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired land is the name of M/s Indian Cane Power Limited
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Tungabhadra River
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 3
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 75
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 5
(e)No. of working days 300
(f)Total Manpower 80
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt121.400121.4
(2.)Percentage of Total Project Area65.21065.21
(3.)No. of Plants1350000135000
(4.)Funds Allocated5017.467.4
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)Environmental300 Acres already developed as for green belt development. This will not only help to create healthy environment in the area but also acts as pollution sink. Further avi-fauna population of the area will increase.
(2.)SocialWith the implementation of the total project, the socio-economic status of the local people will improve and infrastructure facilities like roads, communication systems, drinking water, etc. will also develop. The land rates in the area will escalate due to the project. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area.
(3.)FinancialThe company’s management will recruit semi skilled & unskilled workers from the nearby villages, thereby improving in the social status of the villagers. It creates employment opportunities to 80 nos, additional employees. Further, Market expansion supported by expected infrastructural developments like roads, electricity, water supply etc. will result in improving the economic development in the entire region.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. QCI/NABET/EIA/ACO/18/00732
(ii)Name of the EIA Consultant ENVIRONMENTAL HEALTH & SAFETY CONSULTANTS PVT LTD
(iii)Address No. 13/2, 14st E Cross, Industrial Town, Agrahara Dasarahalli Rajajinagar, Bengaluru– 560044
(iv)Mobile No. 8971871282
(v)Landline No. 0802301620
(vi)Email Id ehscblr@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 22 Apr 2021
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease ensure compliance of other requirements of the Ministry's Notification dated 17/1/2019. Also, proposal is to be submitted along with certified compliance report from the Ministry's Regional Office. 02 Jun 2019
2.NAThe correction have been made as per the instruction received 04 Jun 2019
3.NAPlease reply to our observations dated 2/6/2019 to take the proposal forward. 14 Jun 2019
4.NAThe correction have been made as per the instruction received 25 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantAratole S Niranjan
DesignationMD
Name of Company (Applicant Name should not be given here)M/S INDIAN CANE POWER LIMITED (UNIT: SAMSONS DISTILLERIES)
AddressSy No 233 & other Duggavatti Village , Harapanahalli Taluk, Bellary Dist, Karnataka