|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | EXPANSION OF DISTILLERY CAPACITY FROM 60 KLPD TO 180 KLPD AND 2 MW/HR CAPTIVE STEAM BASED POWER GENERATION TO 9 MW/HR COGENERATION UNIT BY M/s Indian Cane Power Limited (Unit : Samsons Distilleries) | (b)Name of the Company / Organisation | M/S INDIAN CANE POWER LIMITED (UNIT: SAMSONS DISTILLERIES) | (c)Registered Address | Sy No 233 & other Duggavatti Village , Harapanahalli Taluk, Bellary Dist, Karnataka,,Bellary,Karnataka-583137 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Aratole S Niranjan | (b)Designation (Owner/ Partner/ CEO) | MD | (c)Address | M/s Indian Cane Power limited, unit-Samsons Distilleries, 627, Anekonda Bellary,,Harapanahalli,Davanagere,Karnataka-577001 | (d)Pin code | 577001 | (e)E-mail | samsondistillery2019@gmail.com | (f)STD Code. | 8192(f)Telephone No. | 275144 | (g)Fax No. | 08192275039 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | | (b)Category | B2 | Reason for Applying at Ministry | Other | Other Reason for Applying at Ministry | Not applicable as per the Gazette notification SO345(E) dated 17-01-2019 | (c)Proposal Number | IA/KA/IND2/106218/2001 | (d)Master Proposal Number(Single Window) | SW/213682/2021 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Sy No 233 & other Survey nos., Duggavathi village | (b)Pincode | 577001 | (c)Bounded Latitudes (North) | | From | | Degree | 14.62 | Minutes | | Second | | From | | Degree | 14.63 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 75.84 | Minutes | | Second | | From | | Degree | 75.84 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 48N/14 48N/10 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 560 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.9 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Karnataka | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/9/2007-IA-II (I) | (c)Date of Issue of TOR | 01 Jan 1900 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 25 Jun 2019 | (c)Date of Issue of EC | 08 Jan 2020 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | No | (c)Reason | Not applicable as per the Gazette notification SO345(E) dated 17-01-2019 | (d)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bangalore | (iii)Letter No. | J-11011/83/2001-IA II (I) | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Jan 2 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Distillery | 60 | 120 | 180 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Distillery | 60 | 120 | 180KLPD | 60 KLPD to 180 KLPD and from 2 Mw/hr to 9 MW/hr captive steam based power generation. | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 30 Dec 2016 | (iv)Valid Upto | 30 Jun 2021 | (v)File No. | AW-301780 | (vi)Application No. | AW-301780 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 154.68 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 6.02 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 1.16 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.42 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 112500 | (b)Existing quantity of raw material/fuel | 72000 | (c)Total quantity of raw material/fuel | 184500 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Urea | 36 | Tons per Annum | | mumbai | Road | | 584 | Linkage | | Copy of Linkage | (2.) | Molasses | 112500 | Tons per Annum | | ICPL, Uttur | Road | | 193 | Linkage | | Copy of Linkage | (3.) | Turkey red oil | 18 | Tons per Annum | | mumbai | Road | | 584 | Linkage | | Copy of Linkage | (4.) | Sulphuric Acid | 18 | Kilo Litre per Day | | Mumbai | Road | | 584 | Open Market | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 02 Oct 2018 To 31 Dec 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM2.5 | | Micro Gram per Meter Cube | 10 | 0 | 10 | 0 | (2.) | SO2 | | Micro Gram per Meter Cube | 10 | 0 | 10 | 0 | (3.) | PM10 | | Micro Gram per Meter Cube | 10 | 0 | 10 | 0 | (4.) | NOx | | Micro Gram per Meter Cube | 10 | 0 | 10 | 0 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 0 | 0 | 0 | 0 | (2.) | Total Hardness | | | NA | | 0 | 0 | 0 | 0 | (3.) | Fluoride | | | NA | | 0 | 0 | 0 | 0 | (4.) | Heavy Metals | | iron | NA | | 0 | 0 | 0 | 0 | (5.) | TSS | | | NA | | 0 | 0 | 0 | 0 | (6.) | TDS | | | NA | | 0 | 0 | 0 | 0 | (7.) | Chlorides | | | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 0 | 0 | A | (2.) | BOD | | NA | | 0 | 0 | B | (3.) | COD | | NA | | 0 | 0 | A | (4.) | DO | | NA | | 0 | 0 | A | |
14.4. No. of Ambient Noise monitoring locations : 0 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 0 | 0 | 0 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 0 | 0 | 0 | |
14.5. No. of Soil Sample Monitored locations : 0 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | | | 0 | 0 | (2.) | P(Phosphorus) | | | 0 | 0 | (3.) | K(Potassium) | | | 0 | 0 | (4.) | pH | | | 0 | 0 | (5.) | Electric Conductivity | | | 0 | 0 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2 To 5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4 To 6 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 1140 | 3 | Copy of Permission Letter | Pipeline | | Jack Well | | 1103/3 | 28 Sep 2017 | 1500 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | condensate, BBD, CTBD, Spentlees | 1249 | 1250 | Condensate polishing unit | Others | ZLD | 1249 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 1249 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 1249 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Boiler Ash | Industrial Waste | | 11520 | Tons | 2 | Road | | Others | Brick Manufacturing | (2.) | Yeast sludge | Industrial Waste | | 3600 | Tons | 0 | Road | | Others | Used in compost plant and used as bio manure | (3.) | Sludge from CPU | Industrial Waste | | 9 | Tons | 0 | Road | | Others | Used in compost plant and used as bio manure | (4.) | Used oil from DG set | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.5 | Kilolitre | 0 | Road | | Others | Used as lubricants | (5.) | Domestic solid waste | Municipal Solid Waste | | 12 | Tons | 2 | Road | | Others | Nearby municipal agencies & recyclers. | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 10 | 1 | 1.1 | 12 | 0 | (2.) | PM2.5 | | Microgram per Meter Cube | 10 | 1 | 1.1 | 12 | 0 | (3.) | SO2 | | Microgram per Meter Cube | 10 | 1 | 1.1 | 12 | 0 | (4.) | NOx | | Microgram per Meter Cube | 10 | 1 | 1.1 | 12 | 0 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | bolier | slop | 85 | 2.8 | PM10 | | 20 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 3000 | (b)Source | Captive | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1000 | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 186.55 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 186.55 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : as per the Gazette notification SO345(E) dated 17- | 0 | Total (ha.) | 0 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 16.2 | | (2.) | Green belt | | 121.4 | | (3.) | Others | Road and open area | 48.96 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Renebennur Blackbuck sanctuary | 6.8 | Protected Area | (2.) | Critically Polluted Area | 0 | 0 | 0 | (3.) | NPA | 0 | 0 | 0 | (4.) | ESAs | 0 | 0 | 0 | (5.) | ESZs | 0 | 0 | 0 | (6.) | Corridors | 0 | 0 | 0 | (7.) | Wildlife Corridors | 0 | 0 | 0 | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | 0 | 0 | 0 | (2.) | Archaeological Sites | | 0 | 0 | 0 | (3.) | Forest | | Aligilwada Reserve forest | 1.4 | forest | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 186.55 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | land is the name of M/s Indian Cane Power Limited | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Tungabhadra River | (ii)Direction of Water Bodies in Buffer Area | West | (iii)Distance of Water Bodies in Buffer Area | 3 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 75 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 5 | (e)No. of working days | 300 | (f)Total Manpower | 80 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 121.40 | 0 | 121.4 | (2.) | Percentage of Total Project Area | 65.21 | 0 | 65.21 | (3.) | No. of Plants | 135000 | 0 | 135000 | (4.) | Funds Allocated | 50 | 17.4 | 67.4 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | 300 Acres already developed as for green belt development. This will not only help to create healthy environment in the area but also acts as pollution sink. Further avi-fauna population of the area will increase. | (2.) | Social | With the implementation of the total project, the socio-economic status of the local people will improve and infrastructure facilities like roads, communication systems, drinking water, etc. will also develop. The land rates in the area will escalate due to the project. This will help in upliftment of the social status of the people in the area. Educational institutions will also come-up and will lead to improvement of educational status of the people in the area. | (3.) | Financial | The company’s management will recruit semi skilled & unskilled workers from the nearby villages, thereby improving in the social status of the villagers. It creates employment opportunities to 80 nos, additional employees. Further, Market expansion supported by expected infrastructural developments like roads, electricity, water supply etc. will result in improving the economic development in the entire region. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | QCI/NABET/EIA/ACO/18/00732 | (ii)Name of the EIA Consultant | ENVIRONMENTAL HEALTH & SAFETY CONSULTANTS PVT LTD | (iii)Address | No. 13/2, 14st E Cross, Industrial Town, Agrahara Dasarahalli Rajajinagar, Bengaluru– 560044 | (iv)Mobile No. | 8971871282 | (v)Landline No. | 0802301620 | (vi)Email Id | ehscblr@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 22 Apr 2021 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please ensure compliance of other requirements of the Ministry's Notification dated 17/1/2019. Also, proposal is to be submitted along with certified compliance report from the Ministry's Regional Office. | 02 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Jun 2019 | 3. | NA | Please reply to our observations dated 2/6/2019 to take the proposal forward. | 14 Jun 2019 | 4. | NA | The correction have been made as per the instruction received | 25 Jun 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Aratole S Niranjan | Designation | MD | Name of Company (Applicant Name should not be given here) | M/S INDIAN CANE POWER LIMITED (UNIT: SAMSONS DISTILLERIES) | Address | Sy No 233 & other Duggavatti Village , Harapanahalli Taluk, Bellary Dist, Karnataka |
|