|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Mangal Murti Bio-Chem Pvt. Ltd. | (b)Name of the Company / Organisation | MANGAL MURTI BIO-CHEM PVT. LTD. | (c)Registered Address | Survey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Surat,Gujarat-394125 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Bharat Tank | (b)Designation (Owner/ Partner/ CEO) | ExecutiveDirector | (c)Address | Survey No. 311/2, Block No. 261, At and PO Nana Borsara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Mangrol,Surat,Gujarat-394125 | (d)Pin code | 394125 | (e)E-mail | sharma_mangalmurti@yahoo.com | (f)STD Code. | 261(f)Telephone No. | 254888 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(b) Pesticides industry and pesticide specific intermediates (excluding formulations) 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/GJ/IND2/106010/2017 | (d)Master Proposal Number(Single Window) | SW/106008/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Survey No. 311/2, Block No. 261, At & PO: Nana Bor | (b)Pincode | 394125 | (c)Bounded Latitudes (North) | | From | | Degree | 21.5283 | Minutes | | Second | | From | | Degree | 21.5289 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 73.0025 | Minutes | | Second | | From | | Degree | 73.0036 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43N2 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 36 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 17 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Gujarat | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | IA-J-11011/536/2017-IA-II(I) | (b)Date of Apply of TOR | 01 Nov 2017 | (c)Date of Issue of TOR / Standard ToR | 09 Dec 2017 | (d)Date of Apply of EC | 01 Nov 2017 | (e)Date of Issue of EC | 09 Dec 2017 | (f)Previous TOR Letter | Copy of Previous TOR letter | (g)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 02 Nov 2018 | Distance of Public Hearing Venue from the Proposed Project : | 0 |
| Survey No. 311/2, Block No. 261, At & Po: Nana Borsara, Tal: Mangrol, Dist. Surat, (Gujarat-394125) ) | State : | Gujarat | District : | Surat | Tehsil : | Mangrol | Village : | Nana Borsara |
| 97 | Pollution arising from the industry | Others | Residental Additional Collector & Additional District Magistrate | |
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | SPCB | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | | (iii)Letter No. | Not Applicable | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Dec 9 2017 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Production Capacity | 3725 | 1149 | 4874 | Others | MT/Month | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | IBR Boiler | 0 | 1 | 1 | 5 TPH | (2.) | MEE & ATFD system | 0 | 1 | 1 | 120 KL/Day | (3.) | IBR Boiler | 0 | 1 | 1 | 2TPH | (4.) | S.S. Reactor | 14 | 10 | 24 | 5 - 16 KL | (5.) | M.S. Glass Line Reactor | 10 | 13 | 23 | 5 - 16 KL | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 18 Jul 2018 | (iv)Valid Upto | 25 Mar 2023 | (v)File No. | GPCB/CCA-SRT-1439(2)/ID_35078/ | (vi)Application No. | AWH-94646 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 31.57 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 2.66 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.125 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 1.2 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 1760 | (b)Existing quantity of raw material/fuel | 4280 | (c)Total quantity of raw material/fuel | 6040 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sulfuric Acid (98%) | 12647.4 | Others | MT/Annum | Local | Road | | 5 | Linkage | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2017 To 31 May 2017 | (b)Season | Pre-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 26.72 | 15.75 | 23.15 | 80 | (2.) | NOx | | Micro Gram per Meter Cube | 28.53 | 18.63 | 25.12 | 80 | (3.) | Others | O3 | Micro Gram per Meter Cube | 11.73 | 10.51 | 11.15 | 100 | (4.) | PM10 | | Micro Gram per Meter Cube | 95.94 | 74.91 | 83.54 | 100 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 51.28 | 43.55 | 50.79 | 60 | |
14.2. No. of Ground Water monitoring locations : 9 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | NA | | 8.02 | 7.37 | 6.5 | 8.5 | (2.) | Total Hardness | | | mg/l | | 753 | 165.3 | 300 | 600 | (3.) | Fluoride | | | mg/l | | 0.07 | 0.01 | 1 | 1.5 | (4.) | Others | Sulphate | | mg/l | | 542.8 | 34.62 | 200 | 400 | (5.) | TSS | | | mg/l | | 92 | 2 | 50 | 100 | (6.) | Chlorides | | | mg/l | | 267.4 | 98.55 | 250 | 1000 | (7.) | Heavy Metals | | Iron | mg/l | | 22.08 | 0.23 | 0.3 | 1 | (8.) | TDS | | | mg/l | | 1910 | 372 | 500 | 2000 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | BOD | | mg/l | | 0.2 | 0.2 | C | (2.) | COD | | mg/l | | 124.3 | 124.3 | C | (3.) | Others | TDS | mg/l | | 1124 | 1124 | C | (4.) | pH | | NA | | 8.33 | 8.33 | C | (5.) | DO | | mg/l | | 5.42 | 5.42 | C | |
14.4. No. of Ambient Noise monitoring locations : 9 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 73 | 65 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 69 | 62 | 70 | |
14.5. No. of Soil Sample Monitored locations : 9 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | Electric Conductivity | Millisiemens per Centimetre | | 55 | 45 | (2.) | N(Nitrogen) | Milligram per Litre | | 541 | 130 | (3.) | pH | | | 8.16 | 7.32 | (4.) | K(Potassium) | Milligram per Litre | | 1082 | 260 | (5.) | P(Phosphorus) | Milligram per Litre | | 725 | 175 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 75 To 90 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 84 To 97 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | GIDC Water Supply | 344.2 | 5 | Copy of Permission Letter | Pipeline | | Others | Pipeline | NO/GIDC/DEE/PNL/1796 | 01 Sep 2017 | 300 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Industrial | 112.5 | 112.5 | ETP, RO & MEE | Others | Re-use within premises | 109 | 3.5 | (2.) | Domestic | 6.5 | 6.5 | Septic tank/ soak pit | Others | Septic tank/ soak pit | 0 | 6.5 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 119 | (b)Total Discharged Water (Kilolitre per Day) | 10 | (c)Total Reused Water (Kilolitre per Day) | 109 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Discarded containers/ barrels/ liners | Industrial Waste | | 60 | Tons | 11 | Road | | Others | Sell to GPCB authorized vendor | (2.) | Date expired/ Off specification products | Industrial Waste | | 0.096 | Tons | 7 | Road | | Others | re-used back in process or CHWIF site | (3.) | Distillation Residue | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 90 | Tons | 8 | Road | | Others | CHWIF site | (4.) | HCl solution (30%) | Industrial Waste | | 3636 | Tons | 7 | Road | | Others | Captive consumption or Sell to end user | (5.) | AlCl3 solution | Industrial Waste | | 7236 | Tons | 7 | Road | | Others | Captive consumption or Sell to end user | (6.) | KCl Powder | Industrial Waste | | 1584 | Tons | 8 | Road | | Others | Captive consumption or Sell to end user | (7.) | NaBr Solution (30%) | Industrial Waste | | 1776 | Tons | 4 | Road | | Others | Captive consumption or Sell to end user | (8.) | HBr Solution (45%) | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 912 | Tons | 10 | Road | | Others | Captive consumption or Sell to end user | (9.) | ODCB | Industrial Waste | | 42 | Tons | 14 | Road | | Others | Captive consumption or Sell to end user | (10.) | Dil. Sulphuric Acid (70%) | Industrial Waste | | 1320 | Tons | 5 | Road | | Others | Captive consumption or Sell to end user | (11.) | Spent acetic acid | Industrial Waste | | 66 | Tons | 11 | Road | | Others | Captive consumption or Sell to end user | (12.) | Sodium dichromate | Industrial Waste | | 300 | Tons | 15 | Road | | Others | Captive consumption or Sell to end user | (13.) | Spent trichloro carbonilide | Industrial Waste | | 36 | Tons | 12 | Road | | Others | Captive consumption or Sell to end user | (14.) | MEE salt | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 1020 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (15.) | Process waste | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 6 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (16.) | 10% HBr in spent sulphuric | Industrial Waste | | 1800 | Tons | 11 | Road | | Others | Captive consumption or Sell to end user | (17.) | Calcium diphosphate | Industrial Waste | | 55.2 | Tons | 9 | Road | | Others | Captive consumption or Sell to end user | (18.) | Spent Ethyl Acetate | Industrial Waste | | 17.64 | Tons | 10 | Road | | Others | Captive consumption or Sell to end user | (19.) | Used Oil | Industrial Waste | | 0.6 | Tons | 5 | Road | | Others | Sell to registered refiners | (20.) | ETP Sludge | Industrial Waste | | 24 | Tons | 8 | Road | | Treatment, Storage and Disposal Facility(TSDF) | | (21.) | Poly Aluminium Chloride | Industrial Waste | | 55.44 | Tons | 14 | Road | | Others | Captive consumption or Sell to end user | (22.) | Nitrous oxide | Industrial Waste | | 20.4 | Tons | 7 | Road | | Others | Captive consumption or Sell to end user | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 74.91 | 8.7 | 0.012 | 75.922 | 80 | (2.) | PM2.5 | | Microgram per Meter Cube | 49.87 | 8.7 | 0.007 | 50.1 | 60 | (3.) | Others(Specify) | Cl2 | Microgram per Meter Cube | 0.1 | 8.7 | 0.001 | 0.2 | 30 | (4.) | NOx | | Microgram per Meter Cube | 28.53 | 8.7 | 0.004 | 29.11 | 80 | (5.) | SO2 | | Microgram per Meter Cube | 26.72 | 8.7 | 0.013 | 27.001 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Bio Coal | 33 | 0.6 | SO2 | | 100 | (2.) | Boiler | Bio Coal | 33 | 0.6 | PM10 | | 150 | (3.) | Boiler | Bio Coal | 33 | 0.6 | NOx | | 50 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 750 | (b)Source | DGVCL | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 DG Set * 500 KVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 2.3427 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 2.3427 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 80.32 | (b)Waste/Barren Land (ha.) | 135.48 | (c)Grazing/ Community Land (ha.) | 20 | (d)Surface Water Bodies (ha.) | 3.1 | (e)Settlements (ha.) | 11.34 | (f)Industrial (ha.) | 10.37 | (g)Forest (ha.) | 10 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0.74 | (j)Others (ha.) : Miscelleanous land, Open land, Marshy land | 42.88 | Total (ha.) | 314.22999999999996 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 1.253 | Admin & Lab area, Process & Storage area, | (2.) | Green belt | | 0.7280 | | (3.) | Built Up Area | | 0.1262 | ETP & Parking area | (4.) | Others | Internal Approach Road | 0.2355 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | NA | 0 | NA | (2.) | ESAs | NA | 0 | NA | (3.) | Corridors | NA | 0 | NA | (4.) | Wildlife Corridors | NA | 0 | NA | (5.) | WLS | NA | 0 | NA | (6.) | ESZs | NA | 0 | NA | (7.) | Critically Polluted Area | NA | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Forest | | NA | 0 | NA | (2.) | Defence Installations | | NA | 0 | NA | (3.) | Others | NA | NA | 0 | NA | (4.) | Archaeological Sites | | NA | 0 | NA | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Yet To Start | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | No | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 35 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 60 | (e)No. of working days | 330 | (f)Total Manpower | 95 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 7280 | 4720 | 12000 | (2.) | Percentage of Total Project Area | 31.07 | 20.1 | 51.17 | (3.) | No. of Plants | 1820 | 1180 | 3000 | (4.) | Funds Allocated | 54.6 | 35.4 | 90 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Social | The quarry project would provide raw material to construction and infrastructure projects with some jobs. | (2.) | Environmental | Addition of trees in and around premises | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Stay Order Against QCI/NABET | (ii)Name of the EIA Consultant | Aqua-Air Environmental Engineers Pvt. Ltd. | (iii)Address | 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002 | (iv)Mobile No. | 9904433995 | (v)Landline No. | 0261246124 | (vi)Email Id | aqua_eia@yahoo.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 19 Feb 2022 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Please inform/clarify the following:-
- EC for the existing industrial operations @3725 TPM, and compliance status thereof.
- Proposal for ToR submitted after conducting EIA studies and preparation of EMP during March-May, 2017.
- Manufacturing pesticides/intermediates and pharma products in the same premises is not justified.
- Entries against column 15 are factually incorrect. There being no permission letter attached, permitted quantity of 236 cum/day is not justified.
- Why the products proposed under category 5(b) should not be considered as synthetic organic chemicals. | 26 May 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Jul 2019 | 3. | NA | - The unit is engaged in production of chemical fertilizers @3675 TPM, and does require prior environmental clearance in terms of the provisions of the EIA Notification, 2006. This needs to be suitably clarified.
- Reply to the EDS vide letter dated 3/7/2019 from the project proponent, shows proposal details of different unit M/s S M Industries. This is total misleading and not acceptable. | 03 Aug 2019 | 4. | NA | The correction have been made as per the instruction received | 19 Aug 2019 | 5. | NA | May kindly peruse the document uploaded against the Public Hearing proceeding, it was found that the document did not contain the annexure which is mentioned in the report.
May kindly refer to the EMP, issues raised during the public hearing and action plan for commitments on the issues raised during the PH and CER plan is not provided
You are requested to provide the above information for the further consideration of the proposal | 27 Sep 2019 | 6. | NA | The correction have been made as per the instruction received | 16 Oct 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Bharat Tank | Designation | ExecutiveDirector | Name of Company (Applicant Name should not be given here) | MANGAL MURTI BIO-CHEM PVT. LTD. | Address | Survey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat |
|