Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Mangal Murti Bio-Chem Pvt. Ltd.
(b)Name of the Company / Organisation MANGAL MURTI BIO-CHEM PVT. LTD.
(c)Registered Address Survey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Surat,Gujarat-394125
(d)Legal Status of the Company Others
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Bharat Tank
(b)Designation (Owner/ Partner/ CEO) ExecutiveDirector
(c)Address Survey No. 311/2, Block No. 261, At and PO Nana Borsara-394125, Taluka Mangrol, Dist. Surat, Gujarat,,Mangrol,Surat,Gujarat-394125
(d)Pin code 394125
(e)E-mail sharma_mangalmurti@yahoo.com
(f)STD Code. 261(f)Telephone No. 254888
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/106010/2017
(d)Master Proposal Number(Single Window) SW/106008/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Expansion
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Survey No. 311/2, Block No. 261, At & PO: Nana Bor
(b)Pincode 394125
(c)Bounded Latitudes (North)
From
Degree 21.5283
Minutes
Second
From
Degree 21.5289
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 73.0025
Minutes
Second
From
Degree 73.0036
Minutes
Second
(e)Survey of India Topo Sheet No. F43N2
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 36
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 17
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR)/EC:
(a)MoEF&CC / SEIAA File Number IA-J-11011/536/2017-IA-II(I)
(b)Date of Apply of TOR 01 Nov 2017
(c)Date of Issue of TOR / Standard ToR 09 Dec 2017
(d)Date of Apply of EC 01 Nov 2017
(e)Date of Issue of EC 09 Dec 2017
(f)Previous TOR Letter Copy of Previous TOR letter
(g)Previous EC Letter Copy of Previous EC letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :25 Sep 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :02 Nov 2018
Distance of Public Hearing Venue from the Proposed Project :0
Survey No. 311/2, Block No. 261, At & Po: Nana Borsara, Tal: Mangrol, Dist. Surat, (Gujarat-394125) )
State :Gujarat
District :Surat
Tehsil :Mangrol
Village :Nana Borsara
97Pollution arising from the industryOthersResidental Additional Collector & Additional District Magistrate
8.
Details of Project Configuration/Product:
Details Not Applicable
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
(a)Details of certified report on compliance of earlier environmental clearance condition
(i)Certified Compliance By SPCB
(ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on
(iii)Letter No. Not Applicable
(iv)Status of Compliance Compiled
(v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) Copy of Certified Compliance Report
(vi)Date of site visit Dec 9 2017 12:00AM
(b)Details of Capacity Expansion
S. No.Product/Activity (Capacity/Area)Quantity FromQuantity ToTotal UnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Production Capacity372511494874OthersMT/MonthRoad
(c)Details of Configuration
S. No.Plant / Equipment / Facility Existing ConfigurationProposed ConfigurationFinal configuration after expansionRemarks
(1.)IBR Boiler0115 TPH
(2.)MEE & ATFD system011120 KL/Day
(3.)IBR Boiler0112TPH
(4.)S.S. Reactor1410245 - 16 KL
(5.)M.S. Glass Line Reactor1013235 - 16 KL
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 18 Jul 2018
(iv)Valid Upto 25 Mar 2023
(v)File No. GPCB/CCA-SRT-1439(2)/ID_35078/
(vi)Application No. AWH-94646
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 31.57
(b) Funds Allocated for Environment Management (Capital) (in Crores) 2.66
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.125
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 1.2
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1760
(b)Existing quantity of raw material/fuel 4280
(c)Total quantity of raw material/fuel 6040
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Sulfuric Acid (98%)12647.4OthersMT/AnnumLocalRoad5 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2017 To 31 May 2017
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube26.7215.7523.1580
(2.)NOxMicro Gram per Meter Cube28.5318.6325.1280
(3.)OthersO3Micro Gram per Meter Cube11.7310.5111.15100
(4.)PM10Micro Gram per Meter Cube95.9474.9183.54100
(5.)PM2.5Micro Gram per Meter Cube51.2843.5550.7960
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.027.376.58.5
(2.)Total Hardnessmg/l753165.3300600
(3.)Fluoridemg/l0.070.0111.5
(4.)OthersSulphatemg/l542.834.62200400
(5.)TSSmg/l92250100
(6.)Chloridesmg/l267.498.552501000
(7.)Heavy MetalsIronmg/l22.080.230.31
(8.)TDSmg/l19103725002000
    14.3.     No. of Surface Water monitoring locations : 1
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)BODmg/l0.20.2C
(2.)CODmg/l124.3124.3C
(3.)OthersTDSmg/l11241124C
(4.)pHNA8.338.33C
(5.)DOmg/l5.425.42C
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))736575
(2.)Leq(Night)A-weighted decibels(dB(A))696270
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)Electric ConductivityMillisiemens per Centimetre5545
(2.)N(Nitrogen)Milligram per Litre541130
(3.)pH8.167.32
(4.)K(Potassium)Milligram per Litre1082260
(5.)P(Phosphorus)Milligram per Litre725175
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 75 To 90
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 84 To 97
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC Water Supply344.25Copy of Permission LetterPipelineOthersPipelineNO/GIDC/DEE/PNL/179601 Sep 2017300
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial112.5112.5ETP, RO & MEEOthersRe-use within premises1093.5
(2.)Domestic6.56.5Septic tank/ soak pitOthersSeptic tank/ soak pit06.5
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 119
(b)Total Discharged Water (Kilolitre per Day) 10
(c)Total Reused Water (Kilolitre per Day) 109
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Discarded containers/ barrels/ linersIndustrial Waste60Tons11RoadOthersSell to GPCB authorized vendor
(2.)Date expired/ Off specification productsIndustrial Waste0.096Tons7RoadOthersre-used back in process or CHWIF site
(3.)Distillation ResidueHazardous Waste (as per Hazardous and Other Waste Management rules 2016)90Tons8RoadOthersCHWIF site
(4.)HCl solution (30%)Industrial Waste3636Tons7RoadOthersCaptive consumption or Sell to end user
(5.)AlCl3 solutionIndustrial Waste7236Tons7RoadOthersCaptive consumption or Sell to end user
(6.)KCl PowderIndustrial Waste1584Tons8RoadOthersCaptive consumption or Sell to end user
(7.)NaBr Solution (30%)Industrial Waste1776Tons4RoadOthersCaptive consumption or Sell to end user
(8.)HBr Solution (45%)Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)912Tons10RoadOthersCaptive consumption or Sell to end user
(9.)ODCBIndustrial Waste42Tons14RoadOthersCaptive consumption or Sell to end user
(10.)Dil. Sulphuric Acid (70%)Industrial Waste1320Tons5RoadOthersCaptive consumption or Sell to end user
(11.)Spent acetic acidIndustrial Waste66Tons11RoadOthersCaptive consumption or Sell to end user
(12.)Sodium dichromateIndustrial Waste300Tons15RoadOthersCaptive consumption or Sell to end user
(13.)Spent trichloro carbonilideIndustrial Waste36Tons12RoadOthersCaptive consumption or Sell to end user
(14.)MEE saltHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1020Tons8RoadTreatment, Storage and Disposal Facility(TSDF)
(15.)Process wasteHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6Tons8RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)10% HBr in spent sulphuricIndustrial Waste1800Tons11RoadOthersCaptive consumption or Sell to end user
(17.)Calcium diphosphateIndustrial Waste55.2Tons9RoadOthersCaptive consumption or Sell to end user
(18.)Spent Ethyl AcetateIndustrial Waste17.64Tons10RoadOthersCaptive consumption or Sell to end user
(19.)Used OilIndustrial Waste0.6Tons5RoadOthersSell to registered refiners
(20.)ETP SludgeIndustrial Waste24Tons8RoadTreatment, Storage and Disposal Facility(TSDF)
(21.)Poly Aluminium ChlorideIndustrial Waste55.44Tons14RoadOthersCaptive consumption or Sell to end user
(22.)Nitrous oxideIndustrial Waste20.4Tons7RoadOthersCaptive consumption or Sell to end user
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube74.918.70.01275.92280
(2.)PM2.5Microgram per Meter Cube49.878.70.00750.160
(3.)Others(Specify)Cl2Microgram per Meter Cube0.18.70.0010.230
(4.)NOxMicrogram per Meter Cube28.538.70.00429.1180
(5.)SO2Microgram per Meter Cube26.728.70.01327.00180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBio Coal330.6SO2100
(2.)BoilerBio Coal330.6PM10150
(3.)BoilerBio Coal330.6NOx50
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 750
(b)Source DGVCL
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 1 DG Set * 500 KVA
(e)Stack Height (in m) 6
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 2.3427
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 2.3427
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 80.32
(b)Waste/Barren Land (ha.) 135.48
(c)Grazing/ Community Land (ha.) 20
(d)Surface Water Bodies (ha.) 3.1
(e)Settlements (ha.) 11.34
(f)Industrial (ha.) 10.37
(g)Forest (ha.) 10
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0.74
(j)Others (ha.) : Miscelleanous land, Open land, Marshy land 42.88
    Total (ha.) 314.22999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant1.253Admin & Lab area, Process & Storage area,
(2.)Green belt0.7280
(3.)Built Up Area0.1262ETP & Parking area
(4.)OthersInternal Approach Road0.2355
Total (ha.) 2.3427
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPANA0NA
(2.)ESAsNA0NA
(3.)CorridorsNA0NA
(4.)Wildlife CorridorsNA0NA
(5.)WLSNA0NA
(6.)ESZsNA0NA
(7.)Critically Polluted AreaNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)OthersNANA0NA
(4.)Archaeological SitesNA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 0
(b)Permanent Employment-During Operation 35
(c)Temporary Employment- During Construction 0
(d)Temporary Employment- During Operation 60
(e)No. of working days 330
(f)Total Manpower 95
32.
Green Belt in Ha:
(a)Uploaded Green Belt plan Copy of Green Belt Plan
S. No.Description ExistingProposedTotal
(1.)Total Area of Green Belt7280472012000
(2.)Percentage of Total Project Area31.0720.151.17
(3.)No. of Plants182011803000
(4.)Funds Allocated54.635.490
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialThe quarry project would provide raw material to construction and infrastructure projects with some jobs.
(2.)EnvironmentalAddition of trees in and around premises
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. Stay Order Against QCI/NABET
(ii)Name of the EIA Consultant Aqua-Air Environmental Engineers Pvt. Ltd.
(iii)Address 403, Centre Point, Nr. Kadiwala School, Ring Road, Surat- 395002
(iv)Mobile No. 9904433995
(v)Landline No. 0261246124
(vi)Email Id aqua_eia@yahoo.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 19 Feb 2022
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - EC for the existing industrial operations @3725 TPM, and compliance status thereof. - Proposal for ToR submitted after conducting EIA studies and preparation of EMP during March-May, 2017. - Manufacturing pesticides/intermediates and pharma products in the same premises is not justified. - Entries against column 15 are factually incorrect. There being no permission letter attached, permitted quantity of 236 cum/day is not justified. - Why the products proposed under category 5(b) should not be considered as synthetic organic chemicals. 26 May 2019
2.NAThe correction have been made as per the instruction received 04 Jul 2019
3.NA- The unit is engaged in production of chemical fertilizers @3675 TPM, and does require prior environmental clearance in terms of the provisions of the EIA Notification, 2006. This needs to be suitably clarified. - Reply to the EDS vide letter dated 3/7/2019 from the project proponent, shows proposal details of different unit M/s S M Industries. This is total misleading and not acceptable. 03 Aug 2019
4.NAThe correction have been made as per the instruction received 19 Aug 2019
5.NAMay kindly peruse the document uploaded against the Public Hearing proceeding, it was found that the document did not contain the annexure which is mentioned in the report. May kindly refer to the EMP, issues raised during the public hearing and action plan for commitments on the issues raised during the PH and CER plan is not provided You are requested to provide the above information for the further consideration of the proposal 27 Sep 2019
6.NAThe correction have been made as per the instruction received 16 Oct 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantBharat Tank
DesignationExecutiveDirector
Name of Company (Applicant Name should not be given here)MANGAL MURTI BIO-CHEM PVT. LTD.
AddressSurvey No. 311/2, Block No. 261, At & PO: Nana Borasara-394125, Taluka Mangrol, Dist. Surat, Gujarat