Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Proposed 320 KLPD Molasses/Grain based distillery, 6 KLPD Malt Spirits Plant & 15 MW Co-generation Power Plant at village Jatwar, Block Shahzadpur, Tehsil Naraingarh, District Ambala (Haryana) by Oasi
(b)Name of the Company / Organisation OASIS ETHANOL INDUSTRIES PRIVATE LIMITED
(c)Registered Address 40, North Avenue, West Punjabi Bagh, Delhi,,West,Delhi-110026
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Subodh Kumar Sharma
(b)Designation (Owner/ Partner/ CEO) EVP
(c)Address Oasis Ethanol Industries Pvt. Ltd., Village Jatwar, Block Shahzadpur, Tehsil Naraingarh, District Ambala, Haryana,,Naraingarh,Ambala,Haryana-134201
(d)Pin code 134201
(e)E-mail ethanol@oasisgrp.in
(f)STD Code. 11(f)Telephone No. 276001
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(g) Distilleries
Minor Activity
(b)Category A
(c)Proposal Number IA/HR/IND2/73520/2018
(d)Master Proposal Number(Single Window) SW/105886/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. 21/1,10,11,20,7/2,14,15,16/1,16/2,17/1,12/2,18,23/
(b)Pincode 134201
(c)Bounded Latitudes (North)
From
Degree 30.42583333
Minutes
Second
From
Degree 30.43166667
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 76.92138889
Minutes
Second
From
Degree 76.92416667
Minutes
Second
(e)Survey of India Topo Sheet No. H43K15, H43K14, H43L3
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 291
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.5
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Haryana
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)HaryanaAmbalaNaraingarh
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/99/2018-IA-II(I)
(b)Date of Apply of TOR 15 Mar 2018
(c)Date of Issue of TOR / Standard ToR 16 Apr 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :11 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :0
Project site
State :Haryana
District :Ambala
Tehsil :Naraingarh
Village :Jatwar
143Employment, Benefits, development of nearby villages, plantation, transportation facilities, medical facilities, odour issues, Environmental impactsDeputy Commissioner
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Distillery320KLPD
(2.)Malt Spirits Plant6KLPD
(3.)Co-generation Power Plant15MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Malt Spirits6Kilo Litre per DayRoad
(2.)Ethanol /ENA / Industrial Alcohol320Kilo Litre per DayRoad
(3.)Power15Mega Watt(MW)OthersThrough Cables
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 542
(b) Funds Allocated for Environment Management (Capital) (in Crores) 85
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 5.42
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 8.0
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 537250
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 537250
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Grains – Maize, jowar, broken rice258300Tons per AnnumThrough SuppliersRoad1000 MoUCopy of Linkage
(2.)Conc Spent wash as fuel for co generation power plant180600Tons per AnnumOwn PlantOthersPipe line0 CaptiveCopy of Linkage
(3.)bio fuel as rice husk/bagasse45500Tons per AnnumThrough SuppliersRoad500 Open MarketCopy of Linkage
(4.)Barley for malting4200Tons per AnnumThrough SuppliersRoad500 Open MarketCopy of Linkage
(5.)Molasses533050Tons per AnnumFrom Nearby Sugar MillsRoad500 MoUCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM2.5Micro Gram per Meter Cube44.226.243.660
(2.)NOxMicro Gram per Meter Cube24.810.224.1180
(3.)PM10Micro Gram per Meter Cube85.655.884.43100
(4.)SO2Micro Gram per Meter Cube16.76.216.0780
    14.2.     No. of Ground Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)TDSmg/l8193915002000
(2.)Chloridesmg/l84.6727.942501000
(3.)pHNA8.167.566.58.5
(4.)TSSmg/l0000
(5.)Total Hardnessmg/l458.3559.87200600
(6.)Fluoridemg/l1.020.6711.5
    14.3.     No. of Surface Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA00E
(2.)BODmg/l00E
(3.)CODmg/l00E
(4.)DOmg/l00E
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.553.4Industrial 75, Commercial 65 & Residential 55
(2.)Leq(Night)A-weighted decibels(dB(A))49.242.6Industrial 70, Commercial 55 & Residential 45
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare237.4131.54
(2.)K(Potassium)Kilogram per hectare146.7210.11
(3.)Electric ConductivityMillisiemens per Centimetre0.340.15
(4.)pH8.147.13
(5.)P(Phosphorus)Kilogram per hectare28.4110.65
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 14.29 To 2.84
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 1.04 To 13.44
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)GroundWater25600Copy of Permission LetterPipelineTube Well21-4/1375/HR/IND/201831 May 20183544
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Industrial36364545Anaerobic, aerobic, filters and RO PlantReuse within the Plant & Recycling3636
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 3636
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 3636
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)AshFly Ash22750Tons200RoadOtherswill be given to brick manufacturers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube33.70.7033.7860
(2.)NOxMicrogram per Meter Cube18.40.74.0422.4480
(3.)SO2Microgram per Meter Cube11.40.7014.0380
(4.)PM10Microgram per Meter Cube72.10.70.6972.79100
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)65 TPH Incineration boilerCon. spent wash with Biomass/Coal782.4PM1050
(2.)65 TPH Incineration BoilerConc. spent wash with Biomass/Coal782.4PM1050
(3.)90 TPH Boiler during Grain OperationBiomass632.5PM1050
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 13750
(b)Source 15 MW Co-generation Power Plant
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 2 x 1500 KVA
(e)Stack Height (in m) 30
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 10.117
    Total Land (ha.) 10.117
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 27100.7
(b)Waste/Barren Land (ha.) 747.68
(c)Grazing/ Community Land (ha.) 1729.36
(d)Surface Water Bodies (ha.) 1072.42
(e)Settlements (ha.) 1834.79
(f)Industrial (ha.) 170.98
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Bricks Manufacturing Unit 500.59
    Total (ha.) 33156.520000000004
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant6.077
(2.)Green belt3.33
(3.)OthersOpen Area0.71
Total (ha.) 10.117
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)ESAsNot Applicable0No ESA within 10 km radius
(2.)ESZsNot Applicable0No ESZ within 10 km radius
(3.)Wildlife CorridorsNot Applicable0No Wildlife corridors within 10 km radius
(4.)NPANot Applicable0No NPA within 10 km radius
(5.)CorridorsNot Applicable0No Corridors within 10 km radius
(6.)Critically Polluted AreaNot Applicable0No CPA within 10 km radius
(7.)WLSNot Applicable0No WLS within 10 km radius
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNot Applicable0No forest within 10 km radius
(2.)Archaeological SitesNot Applicable0No Archaeological sites within 10 km radius
(3.)Defence InstallationsAmbala Cant10.5SW
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10.117
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Already Acquired
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Dangri Nadi
(ii)Direction of Water Bodies in Buffer Area West
(iii)Distance of Water Bodies in Buffer Area 0.5
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 5
(b)Permanent Employment-During Operation 220
(c)Temporary Employment- During Construction 150
(d)Temporary Employment- During Operation 50
(e)No. of working days 350
(f)Total Manpower 425
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.33
(b)Percentage of Total Project Area 32.91
(c)No. of Plants to be Planted 5000
(d)Funds Allocated for Plantation 1000000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)EnvironmentalProject will contribute in Ethanol Blending Program driven by Govt. Of India
(2.)SocialEmployment generation and CER development activities
(3.)FinancialEconomic upliftment
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/RA 0069
(ii)Name of the EIA Consultant J M EnviroNet Pvt. Ltd.
(iii)Address 202 A, ABW Tower, MG Road, Gurgaon Haryana
(iv)Mobile No. 9015209362
(v)Landline No. 9015209362
(vi)Email Id jmenviron@hotmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 07 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease inform/clarify the following:- - Whether the proposed industrial operations are in conformity with permitted land use of the area. Supporting documents in this regard to be submitted. - Whether the SPCB has granted any in-principle approval to allow such a polluting industry at the given site. - Present status of the proposal dated 24/4/2018 for ground water withdrawal of 2560 cum/day. - Firm commitment for procurement of raw materials (Grains/molasses) to achieve production @320 KLPD. 25 May 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantSubodh Kumar Sharma
DesignationEVP
Name of Company (Applicant Name should not be given here)OASIS ETHANOL INDUSTRIES PRIVATE LIMITED
Address40, North Avenue, West Punjabi Bagh, Delhi