1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Maa Ratangarh Multipurpose Project, Village - Dangdiroli, Tehsil - Seondha, District- Datia, M.P | (b)Name of the Company / Organisation | EE HARSI HIGH LEVEL CANAL DN TWO DABRA | (c)Registered Address | EE HARSI HIGH LEVEL CANAL DN 2 DABRA DIST GWALIOR,,Gwalior,Madhya Pradesh-475110 | (d)Legal Status of the Company | State Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Rajesh Chaturvedi | (b)Designation (Owner/ Partner/ CEO) | Project Manager | (c)Address | EE HARSI HIGH LEVEL DN.2 DABRA DIST. GWALIOR,MAA RATANGARH P.I.U. , MAU , DISTT. BHIND,Mou,Bhind,Madhya Pradesh-477222 | (d)Pin code | 477222 | (e)E-mail | eeharsihlc.gwl@gmail.com | (f)STD Code. | 0(f)Telephone No. | | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 1(c) River Valley projects
| Minor Activity | 1(c) River Valley projects
| (b)Category | A | (c)Proposal Number | IA/MP/RIV/62833/2017 | (d)Master Proposal Number(Single Window) | SW/105756/2019 | (e)EAC concerned (for category A Projects only) | River Valley and Hydroelectric Projects | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Village: Dangdiroli, Tehsil: Seondha, District: Da | (b)Pincode | 475682 | (c)Bounded Latitudes (North) | | From | | Degree | 26141266 | Minutes | | Second | | From | | Degree | 26147019 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 78728517 | Minutes | | Second | | From | | Degree | 78728582 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 54J/12 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 533.40 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Madhya Pradesh | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Datia | Seondha | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-12011/21/2016-IA-I(R) | (b)Date of Apply of TOR | 06 Mar 2017 | (c)Date of Issue of TOR / Standard ToR | 15 May 2017 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 14 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 20 |
| Village: Amayan, Tehsil: Mehgaon, District: Bhind | State : | Madhya Pradesh | District : | Bhind | Tehsil : | Mehgaon | Village : | Amayan |
| 51 | Regarding compensation of land.
Problem regarding drinking water and irrigation facilities | Others | ADM | (2.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 31 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 25 |
| Village: Devgarh, Tehsil: Dabra, District: Gwalior | State : | Madhya Pradesh | District : | Gwalior | Tehsil : | Pichhore | Village : | Devgarh |
| 48 | Regarding compensation of land. Problem regarding drinking water and irrigation facilities | Others | SDM | (3.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 17 Jan 2019 | Distance of Public Hearing Venue from the Proposed Project : | 3 |
| Village: Visore, Tehsil: Seondha, District: Datia | State : | Madhya Pradesh | District : | Datia | Tehsil : | Seondha | Village : | Visore |
| 78 | Regarding compensation of land | Others | Joint Collector | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | command area of 78484 ha. (CCA). | Hydraulic structure comprising of composite dam | Irrigation project for CCA of 78484 ha. | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Maa Ratangarh Multipurpose Project (Irrigation) | 78484 | Hectares | | Road | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 2244.97 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 400.73 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 11.25 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 118.36 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 11200000 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 11200000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | coarse aggregate | 610000 | Others | cum | approved stone crusher | Road | | 50 | Others | NA | Copy of Linkage | (2.) | Fine aggregate | 468000 | Others | cum | Local | Road | | 50 | Others | NA | Copy of Linkage | (3.) | Stone / Metal | 376000 | Others | cum | Local | Road | | 50 | Others | NA | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2017 To 30 Sep 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 50.4 | 33.9 | 49.9 | 100 | (2.) | SO2 | | Micro Gram per Meter Cube | 8.5 | 5.3 | 8.2 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 24.7 | 16 | 23.9 | 60 | (4.) | NOx | | Micro Gram per Meter Cube | 18.8 | 10.0 | 18.5 | 80 | |
14.2. No. of Ground Water monitoring locations : 29 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | pH | | | Others | N/A | 8.0 | 6.7 | 6.5 | 8.5 | (2.) | TDS | | | mg/l | | 462.4 | 322.8 | 500 | 2000 | (3.) | Fluoride | | | mg/l | | 0.82 | 0.23 | 1 | 1.5 | (4.) | Total Hardness | | | mg/l | | 285.2 | 146.3 | 200 | 600 | (5.) | Heavy Metals | | Fe | mg/l | | 0 | 0 | 0.3 | 0.3 | (6.) | Chlorides | | | mg/l | | 70.32 | 42.7 | 250 | 1000 | (7.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | COD | | mg/l | | 21 | 15 | C | (2.) | BOD | | mg/l | | 4.7 | 3.2 | C | (3.) | pH | | mg/l | | 8.1 | 7.6 | C | (4.) | DO | | Others | micros/cm | 7.8 | 5.9 | C | |
14.4. No. of Ambient Noise monitoring locations : 6 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 61.8 | 44.2 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 45.7 | 30.3 | 50 | |
14.5. No. of Soil Sample Monitored locations : 6 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 15.23 | 10.23 | (2.) | Electric Conductivity | Others | micros/cm | 386 | 287 | (3.) | K(Potassium) | Milligram per Kilogram | | 57.55 | 41.02 | (4.) | pH | | | 7.7 | 6.8 | (5.) | P(Phosphorus) | Milligram per Kilogram | | 2.5 | 1.55 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 27.03 To 4.5 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 16.97 To 4.16 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 242870000 | 0 | Copy of Permission Letter | modeOthers | Canal and pipelines | Others | Approach channel from dam | N/A | 01 May 2019 | 242870000 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | N/A | 0 | 0 | N/A | Others | N/A | 0 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 0 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 0 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Solid Waste | Municipal Solid Waste | | 0.27 | Tons | 5 | Road | | Sanitary Landfills | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM2.5 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 60 | (2.) | SO2 | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 80 | (3.) | Others(Specify) | CO | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 4 | (4.) | PM10 | | Microgram per Meter Cube | 46.2 | 0 | 25.7 | 71.91 | 100 | (5.) | NOx | | Microgram per Meter Cube | 0 | 0 | 0 | 0.1 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | N/A | N/A | 0 | 0 | PM10 | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 24810 | (b)Source | Power generation by project and state electricity | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2*125 KVA | (e)Stack Height (in m) | 0 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 799.59 | (b)Private Land (ha.) | 1302.79 | (c)Government Land (ha.) | 1235.25 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 3337.63 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 1162.9 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 6.81 | (e)Settlements (ha.) | 50.84 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 219.39 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Dry river bed | 5.64 | Total (ha.) | 1445.58 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | Maa Ratangarh Multipurpose Project | 3337.63 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | N/A | 0 | N/A | (2.) | ESAs | N/A | 0 | N/A | (3.) | Corridors | N/A | 0 | N/A | (4.) | Critically Polluted Area | N/A | 0 | N/A | (5.) | Wildlife Corridors | N/A | 0 | N/A | (6.) | ESZs | N/A | 0 | N/A | (7.) | NPA | N/A | 0 | N/A | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | N/A | 0 | N/A | (2.) | Forest | | Forest Division Datia | 0 | 1041.861 Protected forest and 206.96 reserved forests. The proposal for diversion of forest land is under process. | (3.) | Archaeological Sites | | N/A | 0 | N/A | (4.) | Others | N/A | N/A | 0 | N/A | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | Yes | (a)Forests Clearance Status | Application for Forest Clearance yet to be submitted | (b)Legal Status of Forest Land | Protected and Reserve | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 1302.79 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Under process | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 24 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 766 | (d)No. of PAFs (Project Affected Families) | 766 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 30115.96 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Crocodylus palustris(Mugger Crocodile), Gavialis gangeticus(Ghariyal) , Python molurus(Ajgar) | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 50 Lakhs | (iii)Period of Implementation | - | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Sindh river | (b)Whether there is Diversion Required ? | Yes | (i)Details of Diversion Required | Dam will be constructed across the Sindh river for diversion of river water for irrigation | (ii)Details of Study Conducted | Water availability studies | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Pond of Bariyarpur pick up dam | (ii)Direction of Water Bodies in Buffer Area | East | (iii)Distance of Water Bodies in Buffer Area | 10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 50 | (c)Temporary Employment- During Construction | 300 | (d)Temporary Employment- During Operation | 0 | (e)No. of working days | 300 | (f)Total Manpower | 400 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 47 | (b)Percentage of Total Project Area | 1.41 | (c)No. of Plants to be Planted | 54000 | (d)Funds Allocated for Plantation | 11200000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For River Valley and Hydroelectric Projects |
|
1. | Project Sub Sector | Irrigation Project | 2. | Name of the River | Sindh river | 3. | Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? | No |
|
|
4. Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme) |
---|
S. No. | Project Type | Dam Height (in meters) | Dam Length (in meters) | Total Submergence Area (in hectare) | Gross Command Area (GCA) (in hectare) | Irrigable Command Area (ICA) (in hectare) | Culturable Command Area (CCA) (in hectare) | Total Command Area (in hectare) |
---|
(1.) | Construction of Dam | 31 | 1740 | 3149.63 | 109015 | 78484 | 78484 | 109015 | |
5. | Powerhouse Installed Capacity | No | (a) Type of Powerhouse | Surface | (b) Capacity (in megawatts) | 9 | (c) No. of Tunnels | 0 | (d) No. of Units | 3 | (e) Bank of River | Both |
|
|
6. | Generation of Electricity Annually. | (a) Quantity of Generation of Electricity Annually (in giga watt hours) | 0.009 | (b) Water Availability at Various percentage | S. No. | Percentage | Water availability (in cusecs) | Dependable year | Remarks |
---|
(1.) | 50 % | 5992.29 | 1988 | - | (2.) | 75 % | 4694.35 | 2006 | - | (3.) | 90 % | 3494.64 | 1984 | - | | (c) Machine Availability (in percent) | 0 | (d) Cost of Electricity Generation (in INR) | 0 | (e) Internal Rate of Return (in percent) | 0 | (f) Year of achievement of Internal Rate of Return | 0 |
| 7. | Catchment Area Treatment Plan | Copy of Catchment Plan | 8. | Muck Management Plan | (a)Muck Management Plan | Copy of Muck Management Plan | (b) Total Excavation Muck (in cubic meter) | 817339.61 | (c) Utilized for Construction (in cubic meter) | 817339.61 | (d) No. of Muck Disposal sites | 1 | (e) Total Muck Disposal Area (in hectare) | 0 |
| 9. | Fishery Development and Management Plan | (a)Fishery Development and Management Plan | Copy of Fishery Development and Management Plan | (b) No. of Fish Species | 3 | (c) Name of the umbrella Fish Species (Scientific Name) | Cirrhinus mrigala, Catla catla, labeo rohita |
| 10. | Status of Environmental Flow | S. No. | Season | Average Inflow (in cumec) | Percent of Flow |
---|
(1.) | Lean | 63.12 | 27.05 | (2.) | Non-Lean Non-Monsoon | 149.58 | 47.43 | (3.) | Monsoon | 876.41 | 77.70 | |
| 11. | Free Flow Stretch (in km) | 0 | 12. | Approval of Central Water Commission | No |
| 13. | Approval of Central Electricity Authority | No |
| 14. | Details of Coffer Dam (Upstream) | None |
| 15. | Details of Coffer Dam (Downstream) | None |
| |
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | 49 | (ii)Name of the EIA Consultant | Enviro Infra Solutions Pvt. Ltd. | (iii)Address | 301,302 & 305, SRBC, Plot No. INS - 12, Sector - 9,Vasundhara, Ghaziabad. (U.P.) - 201012 | (iv)Mobile No. | 9818922344 | (v)Landline No. | 0120415118 | (vi)Email Id | eis@enviroinfrasolutions.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | River Valley and Hydroelectric Projects | (ix)Validity of Accreditation | 13 Feb 2020 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | 1. Status of filing of application for forest clearance stage I
2. Approved conservation plan for schedule I species to be submitted.
3. QCI/NABET certificate during the period of base line data collected by the consultant for preparation of EIA/EMP reports. | 20 May 2019 | 2. | NA | The correction have been made as per the instruction received | 26 Oct 2019 | 3. | NA | 1 While opening .kml file submitted with form 2 is "showing not valid". Submit the proper kml having polygonal feature.
2. PH issues to be addressed in the appropriate chapter along with the point wise compliance of issue raised.
3. QCI NABET certificate of the consultant to be submitted for the period of collection of base line data (01.12.2017-30.09.2018).
4. Details of activity proposed under CER alongwith budget allocation and timeline in tabular form to be submitted.
5. Bifurcation of EMP cost to Capital and Recurring cost.
6. Environmental matrix for both construction and operation period.
7. Clarification on the level of officer chaired the Public Hearings.
8. Revised Form 2 | 29 Nov 2019 | 4. | NA | The correction have been made as per the instruction received | 30 Dec 2019 | |
Additional Detail Sought: |
---|
Sno. | ADS Letter | Remarks | Date of ADS |
---|
1. | NA | The EAC in the present meeting deliberated
on the information submitted by the PP (EIA/EMP report, Form 2 etc.). EAC after
detailed deliberation deferred the
proposal for want of following information:
Print
|
|
|
|