Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Maa Ratangarh Multipurpose Project, Village - Dangdiroli, Tehsil - Seondha, District- Datia, M.P
(b)Name of the Company / Organisation EE HARSI HIGH LEVEL CANAL DN TWO DABRA
(c)Registered Address EE HARSI HIGH LEVEL CANAL DN 2 DABRA DIST GWALIOR,,Gwalior,Madhya Pradesh-475110
(d)Legal Status of the Company State Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Rajesh Chaturvedi
(b)Designation (Owner/ Partner/ CEO) Project Manager
(c)Address EE HARSI HIGH LEVEL DN.2 DABRA DIST. GWALIOR,MAA RATANGARH P.I.U. , MAU , DISTT. BHIND,Mou,Bhind,Madhya Pradesh-477222
(d)Pin code 477222
(e)E-mail eeharsihlc.gwl@gmail.com
(f)STD Code. 0(f)Telephone No.
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity1(c) River Valley projects
(b)Category A
(c)Proposal Number IA/MP/RIV/62833/2017
(d)Master Proposal Number(Single Window) SW/105756/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Village: Dangdiroli, Tehsil: Seondha, District: Da
(b)Pincode 475682
(c)Bounded Latitudes (North)
From
Degree 26141266
Minutes
Second
From
Degree 26147019
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 78728517
Minutes
Second
From
Degree 78728582
Minutes
Second
(e)Survey of India Topo Sheet No. 54J/12
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 533.40
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 2
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Madhya Pradesh
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshDatiaSeondha
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/21/2016-IA-I(R)
(b)Date of Apply of TOR 06 Mar 2017
(c)Date of Issue of TOR / Standard ToR 15 May 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :08 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :14 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :20
Village: Amayan, Tehsil: Mehgaon, District: Bhind
State :Madhya Pradesh
District :Bhind
Tehsil :Mehgaon
Village :Amayan
51Regarding compensation of land. Problem regarding drinking water and irrigation facilitiesOthersADM
(2.)
Date of Advertisement :21 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :31 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :25
Village: Devgarh, Tehsil: Dabra, District: Gwalior
State :Madhya Pradesh
District :Gwalior
Tehsil :Pichhore
Village :Devgarh
48Regarding compensation of land. Problem regarding drinking water and irrigation facilitiesOthersSDM
(3.)
Date of Advertisement :07 Dec 2018
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :17 Jan 2019
Distance of Public Hearing Venue from the Proposed Project :3
Village: Visore, Tehsil: Seondha, District: Datia
State :Madhya Pradesh
District :Datia
Tehsil :Seondha
Village :Visore
78Regarding compensation of landOthersJoint Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)command area of 78484 ha. (CCA).Hydraulic structure comprising of composite damIrrigation project for CCA of 78484 ha.
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Maa Ratangarh Multipurpose Project (Irrigation)78484HectaresRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 2244.97
(b) Funds Allocated for Environment Management (Capital) (in Crores) 400.73
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 11.25
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 118.36
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 11200000
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 11200000
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)coarse aggregate610000Otherscumapproved stone crusherRoad50 OthersNACopy of Linkage
(2.)Fine aggregate468000OtherscumLocalRoad50 OthersNACopy of Linkage
(3.)Stone / Metal376000OtherscumLocalRoad50 OthersNACopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Dec 2017 To 30 Sep 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube50.433.949.9100
(2.)SO2Micro Gram per Meter Cube8.55.38.280
(3.)PM2.5Micro Gram per Meter Cube24.71623.960
(4.)NOxMicro Gram per Meter Cube18.810.018.580
    14.2.     No. of Ground Water monitoring locations : 29
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHOthersN/A8.06.76.58.5
(2.)TDSmg/l462.4322.85002000
(3.)Fluoridemg/l0.820.2311.5
(4.)Total Hardnessmg/l285.2146.3200600
(5.)Heavy MetalsFemg/l000.30.3
(6.)Chloridesmg/l70.3242.72501000
(7.)TSSmg/l0000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l2115C
(2.)BODmg/l4.73.2C
(3.)pHmg/l8.17.6C
(4.)DOOthersmicros/cm7.85.9C
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))61.844.265
(2.)Leq(Night)A-weighted decibels(dB(A))45.730.350
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Milligram per Kilogram15.2310.23
(2.)Electric ConductivityOthersmicros/cm386287
(3.)K(Potassium)Milligram per Kilogram57.5541.02
(4.)pH7.76.8
(5.)P(Phosphorus)Milligram per Kilogram2.51.55
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 27.03 To 4.5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 16.97 To 4.16
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface2428700000Copy of Permission LettermodeOthersCanal and pipelinesOthersApproach channel from damN/A01 May 2019242870000
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)N/A00N/AOthersN/A00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste0.27Tons5RoadSanitary Landfills
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM2.5Microgram per Meter Cube0000.160
(2.)SO2Microgram per Meter Cube0000.180
(3.)Others(Specify)COMicrogram per Meter Cube0000.14
(4.)PM10Microgram per Meter Cube46.2025.771.91100
(5.)NOxMicrogram per Meter Cube0000.180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)N/AN/A00PM100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 24810
(b)Source Power generation by project and state electricity
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) 2*125 KVA
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 799.59
(b)Private Land (ha.) 1302.79
(c)Government Land (ha.) 1235.25
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 3337.63
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 1162.9
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 6.81
(e)Settlements (ha.) 50.84
(f)Industrial (ha.) 0
(g)Forest (ha.) 219.39
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Dry river bed 5.64
    Total (ha.) 1445.58
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)OthersMaa Ratangarh Multipurpose Project3337.63
Total (ha.) 3337.63
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSN/A0N/A
(2.)ESAsN/A0N/A
(3.)CorridorsN/A0N/A
(4.)Critically Polluted AreaN/A0N/A
(5.)Wildlife CorridorsN/A0N/A
(6.)ESZsN/A0N/A
(7.)NPAN/A0N/A
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Defence InstallationsN/A0N/A
(2.)ForestForest Division Datia01041.861 Protected forest and 206.96 reserved forests. The proposal for diversion of forest land is under process.
(3.)Archaeological SitesN/A0N/A
(4.)OthersN/AN/A0N/A
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? Yes
(a)Forests Clearance Status Application for Forest Clearance yet to be submitted
(b)Legal Status of Forest Land Protected and Reserve
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 1302.79
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired Under process
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 24
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 766
(d)No. of PAFs (Project Affected Families) 766
(e)Funds Allocated for R&R(in INR) (in Lacs) 30115.96
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species Crocodylus palustris(Mugger Crocodile), Gavialis gangeticus(Ghariyal) , Python molurus(Ajgar)
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 50 Lakhs
(iii)Period of Implementation -
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Sindh river
(b)Whether there is Diversion Required ? Yes
(i)Details of Diversion Required Dam will be constructed across the Sindh river for diversion of river water for irrigation
(ii)Details of Study Conducted Water availability studies
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Pond of Bariyarpur pick up dam
(ii)Direction of Water Bodies in Buffer Area East
(iii)Distance of Water Bodies in Buffer Area 10
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 0
(e)No. of working days 300
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Total Area of Green Belt 47
(b)Percentage of Total Project Area 1.41
(c)No. of Plants to be Planted 54000
(d)Funds Allocated for Plantation 11200000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Irrigation Project
2. Name of the River Sindh river
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Construction of Dam3117403149.631090157848478484109015
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Surface
(b) Capacity (in megawatts) 9
(c) No. of Tunnels 0
(d) No. of Units 3
(e) Bank of River Both
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0.009
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %5992.291988-
(2.)75 %4694.352006-
(3.)90 %3494.641984-
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 817339.61
(c) Utilized for Construction (in cubic meter)817339.61
(d) No. of Muck Disposal sites1
(e) Total Muck Disposal Area (in hectare)0
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 3
(c) Name of the umbrella Fish Species (Scientific Name)Cirrhinus mrigala, Catla catla, labeo rohita
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean63.1227.05
(2.)Non-Lean Non-Monsoon149.5847.43
(3.)Monsoon876.4177.70
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 49
(ii)Name of the EIA Consultant Enviro Infra Solutions Pvt. Ltd.
(iii)Address 301,302 & 305, SRBC, Plot No. INS - 12, Sector - 9,Vasundhara, Ghaziabad. (U.P.) - 201012
(iv)Mobile No. 9818922344
(v)Landline No. 0120415118
(vi)Email Id eis@enviroinfrasolutions.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 13 Feb 2020
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Status of filing of application for forest clearance stage I 2. Approved conservation plan for schedule I species to be submitted. 3. QCI/NABET certificate during the period of base line data collected by the consultant for preparation of EIA/EMP reports. 20 May 2019
2.NAThe correction have been made as per the instruction received 26 Oct 2019
3.NA1 While opening .kml file submitted with form 2 is "showing not valid". Submit the proper kml having polygonal feature. 2. PH issues to be addressed in the appropriate chapter along with the point wise compliance of issue raised. 3. QCI NABET certificate of the consultant to be submitted for the period of collection of base line data (01.12.2017-30.09.2018). 4. Details of activity proposed under CER alongwith budget allocation and timeline in tabular form to be submitted. 5. Bifurcation of EMP cost to Capital and Recurring cost. 6. Environmental matrix for both construction and operation period. 7. Clarification on the level of officer chaired the Public Hearings. 8. Revised Form 2 29 Nov 2019
4.NAThe correction have been made as per the instruction received 30 Dec 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

The EAC in the present meeting deliberated on the information submitted by the PP (EIA/EMP report, Form 2 etc.). EAC after detailed deliberation deferred the proposal for want of following information:

 

Print