1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of Grain Based Distillery Unit with 3.75 MW Co-generation Power Plant from 59 KLD to 70 KLD as per Para 7(ii) | (b)Name of the Company / Organisation | KHEMANI DISTILLERIES PVT LTD | (c)Registered Address | Ringanwada, Kachigam Road, Daman,,Daman,Daman and Diu-396210 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Hinchhalal Dwivedi | (b)Designation (Owner/ Partner/ CEO) | EHSHead | (c)Address | Ringanwada, Kachigam Road, Daman,,Daman,Daman,Daman and Diu-396210 | (d)Pin code | 396210 | (e)E-mail | ehs@khemanigroup.com | (f)STD Code. | 224(f)Telephone No. | 2672 | (g)Fax No. | 2673 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/DD/IND2/105696/2019 | (d)Master Proposal Number(Single Window) | SW/105694/2019 | (e)EAC concerned (for category A Projects only) | NIL | (f)Project Type | Expansion under para 7(ii) |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 50/1-A (1), 50/1-g, 50/2, 53/1, 53/2, 53/4, 58, 59 | (b)Pincode | 396210 | (c)Bounded Latitudes (North) | | From | | Degree | 2256728.33 | Minutes | | Second | | From | | Degree | 2257258.23 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 277762.01 | Minutes | | Second | | From | | Degree | 278439.94 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | F43S15 (46D/15) | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 17 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 042 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Daman and Diu | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | Not Applicable | |
|
4. | Whether the Project Exempted from Public Hearing? | Details Not Applicable | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Bhopal | (iii)Letter No. | 18-E-2/2019(ENV)/197 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 28 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Product- ENA | 59 | 11 | 70 | Kilo Litre per Day(KLD) | | Road,Others | Sold to Market and captive consumption for IMFL | (2.) | By-product- CO2 | 29.5 | 6.5 | 36 | Others | TPD | Others | Shall be captured & sold commercially | (3.) | Product- IMFL/CL/RS | 6600000 | 0 | 6600000 | Others | cases/annum | Road,Others | sold to Market | (4.) | Cogeneration Power | 3.75 | 0 | 3.75 | Mega Watt(MW) | | Road,Others | Captive | (5.) | By-Product - DWGS | 81 | 14 | 95 | Others | TPD | Road,Others | Sold as cattle feed | (6.) | By - Product - DDGS | 27 | 6 | 33 | Others | TPD | Road,Others | Sold as cattle feed | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Grain Unloading Facility | 1 | 0 | 1 | Existing Facilities will be used | (2.) | Evaporation Facility | 2 | 0 | 2 | Existing Facility will be used | (3.) | Decantation & Dryer Facility | 1 | 0 | 1 | Existing facility will be used | (4.) | Effluent Treatment Plant with RO Facility | 1 | 0 | 1 | Existing Facility Will be Used | (5.) | WTP & Waste Water Recovery Facility | 1 | 0 | 1 | Existing Facility will be used | (6.) | Steam Boiler - Stand-by | 12 TPH | 0 | 12 TPH | | (7.) | DG Sets | 2 x 1000 KVA & 1 x 500 KVA | 0 | 2 x 1000 KVA & 1 x 500 KVA | | (8.) | Liquefaction & Fermentation Facility | 1 | 0 | 1 | Existing Facility will be used | (9.) | Steam Boiler- 27.5 TPH & Turbine 3.75 MW | 1 | 0 | 1 | Existing Facility will be used | (10.) | Multi Pressure Distillation Facility | 2 | 0 | 2 | Existing Facility will be used | (11.) | Grain Silo Facility | 2 | 0 | 2 | Existing Facility will be used | (12.) | Grain Milling Facility | 1 | 0 | 1 | Existing Facility will be used | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Oct 2018 | (iv)Valid Upto | 30 Sep 2021 | (v)File No. | PCC/DDD/R-34-WA/AA/RW/94-95/192669/262 | (vi)Application No. | PCC/DDD/R-34-WA/AA/RW/94-95/192669/262 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 100 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 27 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 2.65 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | b)Critically polluted areas as notified by the Central Pollution Control Board(CPCB) from time to time | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Grains – Maize, jowar, broken rice | 165 | Others | TPD | open Market | Road | | 700 | Open Market | | Copy of Linkage | (2.) | Sodium hydroxide | 80 | Others | Kg/day | Local market from Daman and Vapi | Road | | 15 | Open Market | | Copy of Linkage | (3.) | Anti-foam Agent | 34.5 | Others | Kg/day | Local market from Daman and Vapi | Road | | 15 | Open Market | | Copy of Linkage | (4.) | Nutrient | 23 | Others | Kg/day | Local market from Daman and Vapi | Road | | 15 | Open Market | | Copy of Linkage | (5.) | Enzymes | 96.6 | Others | Kg/day | Local market from Daman and Vapi | Road | | 15 | Open Market | | Copy of Linkage | (6.) | Yeast | 27.6 | Others | Kg/day | Local market from Daman and Vapi | Road | | 15 | Open Market | | Copy of Linkage | (7.) | bio fuel as rice husk/bagasse | 150 | Others | TPD | Local Market | Road | | 500 | Open Market | | Copy of Linkage | |
|
16. | Baseline Data | Not Applicable | |
|
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 4.08 To 8.40 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.98 To 5.38 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 417 | 0.1 | Copy of Permission Letter | Pipeline | | Others | Bore Well | 21-4/65/DD/IND/2017-454 | 18 Mar 2019 | 417 | (2.) | Others | Canal | 137 | 0.42 | Copy of Permission Letter | Canal | | Others | - | 411958 | 24 Aug 2018 | 137 | (3.) | GroundWater | | 472 | 0.1 | Copy of Permission Letter | Pipeline | | Others | Bore Well | 21-4/77/DD/IND/2019 | 11 Apr 2019 | 1067 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Process waste | 560 | 600 | ETP (including RO), Decantation, MEE, Dryer | Reuse within the Plant & Recycling,Others | Green area | 560 | 0 | (2.) | Domestic | 16 | 20 | Septic Tank & Soak Pit | Others | Soak Pit | 16 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 576 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 576 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | ETP - Sludge | Others | ETP- SLUDGE | 109.5 | Tons | 0 | Others | TROLLY | Others | used as Bio- Manure within the Plant | (2.) | Grain waste | Others | Grain waste | 565.75 | Tons | 200 | Road | | Others | Sold as cattle Feed | (3.) | Recyclables | Municipal Solid Waste | | 7.3 | Tons | 10 | Road | | Others | Approved Recycler | (4.) | e-waste | E Waste | | 0.144 | Tons | 10 | Road | | Authorized Recyclers | | (5.) | Organics | Municipal Solid Waste | | 3.7 | Tons | 0 | Others | - | Others | organic as manure & incinerable to boiler | (6.) | Used Oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 5 | Kilolitre | 10 | Road | | Authorized Recyclers | | (7.) | Ash - (Bio-Fuels) | Fly Ash | | 4380 | Tons | 200 | Road | | Others | Brick Manufacturer & Bio-Manure Manufacturer | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | SO2 | | Microgram per Meter Cube | 14.70 | 0.9 | 0.85 | 15.55 | 80 | (2.) | NOx | | Microgram per Meter Cube | 14.8 | 0.9 | 5 | 19.9 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 62.10 | 0.9 | 0.5 | 62.61 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 18.8 | 0.9 | 0 | 18.9 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Steam Boiler 12 TPH (Stand by) | Furnace Oil | 32 | 1.15 | Others | PM | 0.5 | (2.) | 2 x 1000 KVA existing DG sets | Low Sulphur Diesel | 30 | 0.25 | SO2 | | 0.0017 | (3.) | Steam Boiler 27.5 TPH | Agro Based fuel | 50 | 1.2 | Others | PM | 0.5 | (4.) | 1 x 500 KVA existing DG set | Low sulphur Diesel | 10 | 0.123 | SO2 | | 0.0017 | (5.) | 1 x 500 KVA existing DG set | Low sulphur Diesel | 10 | 0.123 | NOx | | 0.8 | (6.) | Steam Boiler 12 TPH (Stand by) | Furnace Oil | 32 | 1.15 | SO2 | | 1.3 | (7.) | 1 x 500 KVA existing DG Sets | Low sulphur Diesel | 10 | 0.123 | Others | PM | 0.04 | (8.) | 2 x 1000 KVA existing DG Sets | Low sulphur Diesel | 30 | 0.25 | Others | PM | 0.04 | (9.) | 2 x 1000 KVA existing DG sets | Low Sulphur Diesel | 30 | 0.25 | NOx | | 0.5 | (10.) | Steam Boiler 27.5 TPH | Agro based fuel | 50 | 1.2 | NOx | | 0.5 | (11.) | Steam Boiler 12 TPH (Stand By) | Furnace Oil | 32 | 1.15 | NOx | | 0.5 | (12.) | Steam Boiler 27.5 TPH | Agro based fuel | 50 | 1.2 | SO2 | | 1.3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2700 | (b)Source | Inhouse power generation | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 1 x 500 & 2 x 1000 KVA | (e)Stack Height (in m) | 30 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 9.7473 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 9.7473 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 10 | (b)Waste/Barren Land (ha.) | 20 | (c)Grazing/ Community Land (ha.) | 10 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 10 | (g)Forest (ha.) | 20 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 1 | (j)Others (ha.) : 0 | 200 | Total (ha.) | 271 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 9.7473 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Industrial cluster of Vapi | 4.0 | SE direction | (2.) | WLS | None | 0 | None | (3.) | ESZs | None | 0 | None | (4.) | Corridors | None | 0 | None | (5.) | Wildlife Corridors | None | 0 | None | (6.) | NPA | None | 0 | None | (7.) | ESAs | None | 0 | None | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Coast Guard Air Station | 4.81 | NW direction | (2.) | Forest | | Reserve Forest near Balitha | 2.82 | NEE direction | (3.) | Archaeological Sites | | Holy Jesus Church | 4.13 | NWW Direction | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 9.7473 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Acquired | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Indian Peafowl | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Canal near Project Site | (ii)Direction of Water Bodies in Buffer Area | South West | (iii)Distance of Water Bodies in Buffer Area | 0.42 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 110 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 210 | (e)No. of working days | 365 | (f)Total Manpower | 320 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 32200 | 0 | 32200 | (2.) | Percentage of Total Project Area | 33 | 0 | 33 | (3.) | No. of Plants | 1700 | 1534 | 3234 | (4.) | Funds Allocated | 10000000 | 0 | 10000000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Zero liquid discharge complex | (2.) | Social | Direct and Indirect employment generation | (3.) | Financial | Revenue Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev 76, 06th May 2019/sr no. 119 | (ii)Name of the EIA Consultant | Perfact Enviro Solutions PVt Ltd | (iii)Address | 5th Floor, NN Mall, Sector-3, Rohini | (iv)Mobile No. | 9818362330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.in | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - There being no increase in pollution load due to the proposed expansion (from 59 to 70 KLPD), proposal may be first examined in terms of the Ministry's Notification dated 23/11/2016 for the requirement of EC and/or amendment in the existing EC dated 27/8/2018.
- Earlier EC was granted on 27/8/2018 and the project was operational in October, 2018 i.e. within a month. This needs to be suitably clarified.
- Entries against items 20&21 of Form-2 can not be the same.
- As mentioned at item 11, how the general conditions are applicable and its relevance in the present context. | 25 May 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Hinchhalal Dwivedi | Designation | EHSHead | Name of Company (Applicant Name should not be given here) | KHEMANI DISTILLERIES PVT LTD | Address | Ringanwada, Kachigam Road, Daman |
|