Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Fresh Environmental Clearance for balance work of 4th container terminal and marine container terminal
(b)Name of the Company / Organisation JAWAHARLAL NEHRU PORT TRUST
(c)Registered Address Jawaharlal Nehru Port Trust Admin Building Sheva Uran Navi Mumbai,Navi Mumbai,Raigad,Maharashtra-400707
(d)Legal Status of the Company Central Government
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Shri Sunilkumar Vishnu Madhbhavi
(b)Designation (Owner/ Partner/ CEO) CMPPD
(c)Address Jawaharlal Nehru Port Trust Admin Building, Sheva, Uran, Navi Mumbai,Navi Mumbai,,Raigad,Maharashtra-400707
(d)Pin code 400707
(e)E-mail cmppd.jnpt@gmail.com
(f)STD Code. 22(f)Telephone No. 27245146
(g)Fax No. 0222724178
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity7(e) Ports, Harbours
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/MIS/75011/2018
(d)Master Proposal Number(Single Window) SW/105571/2019
(e)EAC concerned (for category A Projects only) INFRA-2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. NA
(b)Pincode 400707
(c)Bounded Latitudes (North)
From
Degree 18
Minutes
Second
From
Degree 19
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72
Minutes
Second
From
Degree 73
Minutes
Second
(e)Survey of India Topo Sheet No. E43H1
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 5
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)Madhya PradeshDamohDamohbadyau
(2.)MaharashtraRaigadUran
6.
Details of Terms of Reference (ToR):
(a)Whether TOR is mandatory for submitting application Yes
(b)MoEF&CC / SEIAA File Number NIL
(c)Date of Apply of TOR NIL
(d)Date of Issue of TOR / Standard ToR NIL
(e)Previous TOR Letter NIL
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Public Hearing exempted under clause 7(ii) of EIA
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Rail Mounted Gantry Cranes04 Nos.For Phase I & II
(2.)Rubber Tyres Gantry Cranes36 Nos.For Phase I & II
(3.)Tractor Trailers120 Nos.For Phase I & II
(4.)Rail Mounted Quay Cranes12 Nos.For Phase I & II
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Container Handling2.4OthersMTUEsRoad,Rail
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 09 Feb 2018
(iv)Valid Upto 30 Sep 2019
(v)File No. MPCB-CONSENT- 0000034035
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 3169
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.44
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 7.99
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.72
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 0
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 0
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.).....Others.......Others...... Others...Copy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Jan 2018 To 31 Oct 2018
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)SO2Micro Gram per Meter Cube32.124.532.180
(2.)OthersNH3Micro Gram per Meter Cube29.527.129.5400
(3.)PM10Micro Gram per Meter Cube149.771.1145.9100
(4.)NOxMicro Gram per Meter Cube37.531.937.280
(5.)PM2.5Micro Gram per Meter Cube57.544.056.960
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)Total Hardnessmg/l............
(2.)Others...NA............
(3.)Chloridesmg/l............
(4.)TDSmg/l............
(5.)TSSmg/l............
(6.)Heavy Metals...NA............
(7.)Fluoridemg/l............
(8.)pHmg/l............
    14.3.     No. of Surface Water monitoring locations : 14
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHmg/l8.296.8D
(2.)DOmg/l7.524.2D
(3.)BODmg/l21D
(4.)CODmg/l9931D
    14.4.     No. of Ambient Noise monitoring locations : 12
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))7853.575
(2.)Leq(Night)A-weighted decibels(dB(A))78.556.670
    14.5.     No. of Soil Sample Monitored locations : 0
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)......
(2.)K(Potassium)......
(3.)N(Nitrogen)......
(4.)pH......
(5.)Electric Conductivity......
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMaharashtra Jeevan Pradhikaran152.5Copy of Permission LetterPipelineOthersTank309520 Dec 201615
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Sewage1012STPGreen Belt Renewal Plant,OthersCleaning of the Yard100.0
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 10
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 10
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)--Others--0Kilolitre0Others--Others--
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10NA...............
(2.)NOxNA...............
(3.)Others(Specify)...NA...............
(4.)SO2NA..............
(5.)PM2.5NA...............
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)DG SetDiesel80.5NOx0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 60000
(b)Source Maharashtra State Electricity Distribution Co. Ltd
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 1600 kVA x 5Nos.
(e)Stack Height (in m) 8
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 110
(e)Other Land (ha.) 0
    Total Land (ha.) 110
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 110
(e)Settlements (ha.) 0
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : -- 0
    Total (ha.) 110
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant74
(2.)OthersOther26
(3.)Green belt10
Total (ha.) 110
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)NPA........
(2.)Critically Polluted Area--......
(3.)ESAs.........
(4.)ESZs.........
(5.)Corridors.........
(6.)Wildlife Corridors.........
(7.)WLS--0.0no
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesElephanta1.60...
(2.)OthersNANA......
(3.)Defence InstallationsNA......
(4.)ForestMangrove Area...Mangrove Located Near FCT
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Copy of Details of Tree Cutting and Planting of Trees
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R In-Progress
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nhava Creek
(ii)Direction of Water Bodies in Buffer Area South
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 100
(d)Temporary Employment- During Operation 30
(e)No. of working days 365
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 10
(b)Percentage of Total Project Area 9.09
(c)No. of Plants to be Planted 1000
(d)Funds Allocated for Plantation 4500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.       Project Benefits
S. No. Type of Project BenefitsDetails of Project Benefits
NIL
   34.   CRZ Specific Details
S. No.Item Details
1.
Project Details:
(a)CRZ Classification IV
(b)Location Type Non-Eroding Coast
(c)Details of Mangroves Land Involved, if Any 0
(d)Area of Mangroves Land (hectare) 0
(e)EIA (Terrestrial) Studies Carried Out
(i)Summary Details of EIA (Terrestrial) Studies The EIA was carried out from January 2018 to Octob
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Terrestrial) 01 Jan 2018
(iv)Period of Study To (EIA Terrestrial) 31 Oct 2018
(f)EIA (Marine) Studies Carried Out
(i)Summary Details of EIA (Marine) Studies The EIA was carried out from January 2018 to Octob
(ii)Uploaded Recommendation made in EIAs Copy of Recommendation made in EIAs
(iii)Period of Study from (EIA Marine) 01 Jan 2018
(iv)Period of Study to (EIA Marine) 31 Oct 2018
(g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan Yes
2.
Description of the Project Under Consideration:
(a)Type of Project Offshore Structures
(i)Agency Name for Preparing CRZ Maps Institute of Remote Sensing, Anna University, Chen
(ii)Exploration or Development Development
(iii)Depth of Sea Bed ...
(iv)No. of Rigs/Platform ...
(v)Details of Group Gathering Stations ...
3.
Distance of Project (in meters) from ltl/htl to be stated :
(a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity IV
(b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? Yes
(i)Distance of Project (in meters) from HTL to be Stated 1
(ii)Uploaded Maps(Shape File) Copy of Maps
(iii)Distance of Project(in meters) from LTL to be Stated 1
(iv)Uploaded Maps(Shape File) Copy of Maps
(c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? No
(d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? No
(e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared No
(f)NOC from State Pollution Control Boards Obtained Yes
(i)Copy of NOC Copy of NOC
(g)Details of Rain Water Harvesting System
4.
Recommendation of State Coastal Zone Management Authority:
(a)Copy of CZMA Copy of CZMA
(b)State the Conditions Imposed --
(c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) includedinchapter5
   35.   Sector Specific Details For INFRA-2
S. No.Item Details
1.
Details of Building Construction:
(a)Maximum Height of the Building (Meters) 26
(b)Total No. of Flats to be Build 0
(c)No. of Buildings 5
(d)Total plot area (sqm) 1165000
(e)Total built up area (sqm) 71000
2.
Foreshore Facilities and/or Marine Disposal:
(a)Whether Project Involves Foreshore Activities and/or marine Disposal? Yes
(b)Upload Shoreline Study Copy of Shoreline stuudy
(c)Type of Cargo Container
(d)Quantity of Cargo 2.4
(e)Control Measures of Cargo NA
(f)Dust Control Measures Water Sprinkling
(g)Quantum ...
(h)Quantity of Dredging (Cubic meter per day) 100000
(i)Type of Dredging Capital
(j)Disposal of Dredge Material At DS3 location
(k)Details of Outfall Diffusers ...
(l)No. of Dilution Expected ...
(m)Distance at which the Outlet will Reach Ambient Parameters ..
(n)Details of Monitoring at Outfall ...
(o)Copy of NoC from PCB in case of Marine Disposal Copy of NoC
3.
Rain Water Harvesting:
(a)No. of Storage 0
(b)Capacity 0
(c)No. of Recharge Pits 0
(d)Capacity 0
4.
Parking:
(a)Details of 4 Wheeler/ 2 Wheeler Parking 100
5.
Energy Saving Measures:
(a)Source/Mode NA
(b)Percentage ...
(c)Quantity ...
6.
Other details:
(a)Details of impact on Water Bodies and Drainage patters of catchment area NA
(b)Details of Traffic Density Impact Assessment and Modelling Study Copy of Details of Traffic Density Impact Assessment and Modelling Study
(c)In case Underground Tunnel Project below the Forest Land - Subsidence Impact Study report Copy of Underground Tunnel Project below the Forest Land - Subsidence Impact Study report
     7.       Type of Industries to be established with Industrial Estate as per their category A/B
S. No.Type of IndustryNo. of UnitsCategory A/B
NIL
8.
Length of the alignment N/A
9.
Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass
Details Not Applicable
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/IA 007
(ii)Name of the EIA Consultant Global Management and Engineering Consultants Inte
(iii)Address Saharan Tower, 308, Officers Campus Extension, Sirsi Road, Khatipura, Jaipur -302012, Rajasthan
(iv)Mobile No. 9928599571
(v)Landline No. 0141235324
(vi)Email Id info@gmecinternational.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation INFRA-2
(ix)Validity of Accreditation 03 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAAs per your submission, it is informed that PA has applied for fresh recommendation from MCZMA on 11.12.2018. It has not been submitted to the Ministry yet. Kindly submit the following documents: (i) Submit recommendation of CZMA. (ii) Submit copy of final EIA Report as the EIA report presently submitted is marked as “Draft”. (iii) Submit ToR details in Form-2 and upload a copy of the same. (iv) As per ToR condition “Submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued earlier along with an action taken report on issues which have been stated to be partially complied or non/not complied”. The same has not been submitted. Kindly submit the same. (v) Submit break-up for proposed activities in the Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. 17 Jun 2019
2.NAThe correction have been made as per the instruction received 04 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantShri Sunilkumar Vishnu Madhbhavi
DesignationCMPPD
Name of Company (Applicant Name should not be given here)JAWAHARLAL NEHRU PORT TRUST
AddressJawaharlal Nehru Port Trust Admin Building Sheva Uran Navi Mumbai
Print