1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Fresh Environmental Clearance for balance work of 4th container terminal and marine container terminal | (b)Name of the Company / Organisation | JAWAHARLAL NEHRU PORT TRUST | (c)Registered Address | Jawaharlal Nehru Port Trust Admin Building Sheva Uran Navi Mumbai,Navi Mumbai,Raigad,Maharashtra-400707 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Shri Sunilkumar Vishnu Madhbhavi | (b)Designation (Owner/ Partner/ CEO) | CMPPD | (c)Address | Jawaharlal Nehru Port Trust Admin Building, Sheva, Uran, Navi Mumbai,Navi Mumbai,,Raigad,Maharashtra-400707 | (d)Pin code | 400707 | (e)E-mail | cmppd.jnpt@gmail.com | (f)STD Code. | 22(f)Telephone No. | 27245146 | (g)Fax No. | 0222724178 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 7(e) Ports, Harbours
| Minor Activity | | (b)Category | A | (c)Proposal Number | IA/MH/MIS/75011/2018 | (d)Master Proposal Number(Single Window) | SW/105571/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | NA | (b)Pincode | 400707 | (c)Bounded Latitudes (North) | | From | | Degree | 18 | Minutes | | Second | | From | | Degree | 19 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 72 | Minutes | | Second | | From | | Degree | 73 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | E43H1 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 5 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 0 | (j)Seismic Zone | 3 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Madhya Pradesh | Damoh | Damoh | badyau | (2.) | Maharashtra | Raigad | Uran | | |
|
6. | Details of Terms of Reference (ToR): | (a)Whether TOR is mandatory for submitting application | Yes | (b)MoEF&CC / SEIAA File Number | NIL | (c)Date of Apply of TOR | NIL | (d)Date of Issue of TOR / Standard ToR | NIL | (e)Previous TOR Letter | NIL | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing exempted under clause 7(ii) of EIA | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Rail Mounted Gantry Cranes | 04 Nos. | For Phase I & II | (2.) | Rubber Tyres Gantry Cranes | 36 Nos. | For Phase I & II | (3.) | Tractor Trailers | 120 Nos. | For Phase I & II | (4.) | Rail Mounted Quay Cranes | 12 Nos. | For Phase I & II | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Container Handling | 2.4 | Others | MTUEs | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 09 Feb 2018 | (iv)Valid Upto | 30 Sep 2019 | (v)File No. | MPCB-CONSENT- 0000034035 | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 3169 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 1.44 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 7.99 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.72 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | .. | ... | Others | ... | .... | Others | ... | ... | Others | ... | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Jan 2018 To 31 Oct 2018 | (b)Season | Winter | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 6 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | SO2 | | Micro Gram per Meter Cube | 32.1 | 24.5 | 32.1 | 80 | (2.) | Others | NH3 | Micro Gram per Meter Cube | 29.5 | 27.1 | 29.5 | 400 | (3.) | PM10 | | Micro Gram per Meter Cube | 149.7 | 71.1 | 145.9 | 100 | (4.) | NOx | | Micro Gram per Meter Cube | 37.5 | 31.9 | 37.2 | 80 | (5.) | PM2.5 | | Micro Gram per Meter Cube | 57.5 | 44.0 | 56.9 | 60 | |
14.2. No. of Ground Water monitoring locations : 0 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | ... | ... | ... | ... | (2.) | Others | ... | | NA | | ... | ... | ... | ... | (3.) | Chlorides | | | mg/l | | ... | ... | ... | ... | (4.) | TDS | | | mg/l | | ... | ... | ... | ... | (5.) | TSS | | | mg/l | | ... | ... | ... | ... | (6.) | Heavy Metals | | ... | NA | | ... | ... | ... | ... | (7.) | Fluoride | | | mg/l | | ... | ... | ... | ... | (8.) | pH | | | mg/l | | ... | ... | ... | ... | |
14.3. No. of Surface Water monitoring locations : 14 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | mg/l | | 8.29 | 6.8 | D | (2.) | DO | | mg/l | | 7.52 | 4.2 | D | (3.) | BOD | | mg/l | | 2 | 1 | D | (4.) | COD | | mg/l | | 99 | 31 | D | |
14.4. No. of Ambient Noise monitoring locations : 12 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 78 | 53.5 | 75 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 78.5 | 56.6 | 70 | |
14.5. No. of Soil Sample Monitored locations : 0 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | | | ... | ... | (2.) | K(Potassium) | | | ... | ... | (3.) | N(Nitrogen) | | | ... | ... | (4.) | pH | | | ... | ... | (5.) | Electric Conductivity | | | ... | ... | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0 To 0 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Maharashtra Jeevan Pradhikaran | 15 | 2.5 | Copy of Permission Letter | Pipeline | | Others | Tank | 3095 | 20 Dec 2016 | 15 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Sewage | 10 | 12 | STP | Green Belt Renewal Plant,Others | Cleaning of the Yard | 10 | 0.0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 10 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 10 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | -- | Others | -- | 0 | Kilolitre | 0 | Others | -- | Others | -- | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | NA | ... | ... | ... | ... | ... | (2.) | NOx | | NA | ... | ... | ... | ... | ... | (3.) | Others(Specify) | ... | NA | ... | ... | ... | ... | ... | (4.) | SO2 | | NA | ... | ... | ... | .. | ... | (5.) | PM2.5 | | NA | ... | ... | ... | ... | ... | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG Set | Diesel | 8 | 0.5 | NOx | | 0 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 60000 | (b)Source | Maharashtra State Electricity Distribution Co. Ltd | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 1600 kVA x 5Nos. | (e)Stack Height (in m) | 8 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 110 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 110 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 110 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : -- | 0 | Total (ha.) | 110 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 74 | | (2.) | Others | Other | 26 | | (3.) | Green belt | | 10 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | NPA | ... | ... | .. | (2.) | Critically Polluted Area | -- | ... | ... | (3.) | ESAs | ... | ... | ... | (4.) | ESZs | ... | ... | ... | (5.) | Corridors | ... | ... | ... | (6.) | Wildlife Corridors | ... | ... | ... | (7.) | WLS | -- | 0.0 | no | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | Elephanta | 1.60 | ... | (2.) | Others | NA | NA | ... | ... | (3.) | Defence Installations | | NA | ... | ... | (4.) | Forest | | Mangrove Area | ... | Mangrove Located Near FCT | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | 0 | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | In-Progress | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Nhava Creek | (ii)Direction of Water Bodies in Buffer Area | South | (iii)Distance of Water Bodies in Buffer Area | 2 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 20 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 30 | (e)No. of working days | 365 | (f)Total Manpower | 200 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 10 | (b)Percentage of Total Project Area | 9.09 | (c)No. of Plants to be Planted | 1000 | (d)Funds Allocated for Plantation | 4500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
|
1. | Project Details: | (a)CRZ Classification | IV | (b)Location Type | Non-Eroding Coast | (c)Details of Mangroves Land Involved, if Any | 0 | (d)Area of Mangroves Land (hectare) | 0 | (e)EIA (Terrestrial) Studies | Carried Out | (i)Summary Details of EIA (Terrestrial) Studies | The EIA was carried out from January 2018 to Octob | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Terrestrial) | 01 Jan 2018 | (iv)Period of Study To (EIA Terrestrial) | 31 Oct 2018 | (f)EIA (Marine) Studies | Carried Out | (i)Summary Details of EIA (Marine) Studies | The EIA was carried out from January 2018 to Octob | (ii)Uploaded Recommendation made in EIAs | Copy of Recommendation made in EIAs | (iii)Period of Study from (EIA Marine) | 01 Jan 2018 | (iv)Period of Study to (EIA Marine) | 31 Oct 2018 | (g)Disaster Management Plan/National Oil Spill Disaster Contigency Plan | Yes | |
|
2. | Description of the Project Under Consideration: | (a)Type of Project | Offshore Structures | (i)Agency Name for Preparing CRZ Maps | Institute of Remote Sensing, Anna University, Chen | (ii)Exploration or Development | Development | (iii)Depth of Sea Bed | ... | (iv)No. of Rigs/Platform | ... | (v)Details of Group Gathering Stations | ... | |
|
3. | Distance of Project (in meters) from ltl/htl to be stated : | (a)Clause of CRZ Notification Under which the Project is a Permissible/Regulated Activity | IV | (b)Whether CRZ Map Indicating HTL,LTL Demarcation in 1:4000 Scale Prepared? | Yes | (i)Distance of Project (in meters) from HTL to be Stated | 1 | (ii)Uploaded Maps(Shape File) | Copy of Maps | (iii)Distance of Project(in meters) from LTL to be Stated | 1 | (iv)Uploaded Maps(Shape File) | Copy of Maps | (c)Whether Project Layout Superimposed on CRZ Map 1:4000 Scale ? | No | (d)Whether CRZ Map 1:25000 Covering 7 km Radius Around Project Site Prepared ? | No | (e)Whether CRZ Map Indicating CRZ-I,II,III and IV Including Other Notified ESAs Prepared | No | (f)NOC from State Pollution Control Boards Obtained | Yes | (i)Copy of NOC | Copy of NOC | (g)Details of Rain Water Harvesting System | | |
|
4. | Recommendation of State Coastal Zone Management Authority: | (a)Copy of CZMA | Copy of CZMA | (b)State the Conditions Imposed | -- | (c)Social and Environmental Issues and Mitigations Measures Suggested Including but not Limited to R&R, Water, Air, Hazardous Wastes, Ecological aspects, etc. (Brief Details to be Provided) | includedinchapter5 | |
|
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 26 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 5 | (d)Total plot area (sqm) | 1165000 | (e)Total built up area (sqm) | 71000 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | Yes | (b)Upload Shoreline Study | Copy of Shoreline stuudy | (c)Type of Cargo | Container | (d)Quantity of Cargo | 2.4 | (e)Control Measures of Cargo | NA | (f)Dust Control Measures | Water Sprinkling | (g)Quantum | ... | (h)Quantity of Dredging (Cubic meter per day) | 100000 | (i)Type of Dredging | Capital | (j)Disposal of Dredge Material | At DS3 location | (k)Details of Outfall Diffusers | ... | (l)No. of Dilution Expected | ... | (m)Distance at which the Outlet will Reach Ambient Parameters | .. | (n)Details of Monitoring at Outfall | ... | (o)Copy of NoC from PCB in case of Marine Disposal | Copy of NoC | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 0 | (d)Capacity | 0 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 100 | |
|
5. | Energy Saving Measures: | (a)Source/Mode | NA | (b)Percentage | ... | (c)Quantity | ... | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1619/IA 007 | (ii)Name of the EIA Consultant | Global Management and Engineering Consultants Inte | (iii)Address | Saharan Tower, 308, Officers Campus Extension, Sirsi Road, Khatipura, Jaipur -302012, Rajasthan | (iv)Mobile No. | 9928599571 | (v)Landline No. | 0141235324 | (vi)Email Id | info@gmecinternational.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 03 Aug 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | As per your submission, it is informed that PA has applied for fresh recommendation from MCZMA on 11.12.2018. It has not been submitted to the Ministry yet. Kindly submit the following documents:
(i) Submit recommendation of CZMA.
(ii) Submit copy of final EIA Report as the EIA report presently submitted is marked as “Draft”.
(iii) Submit ToR details in Form-2 and upload a copy of the same.
(iv) As per ToR condition “Submit Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned Regional Office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board for the conditions stipulated in the environmental clearance issued earlier along with an action taken report on issues which have been stated to be partially complied or non/not complied”. The same has not been submitted. Kindly submit the same.
(v) Submit break-up for proposed activities in the Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 17 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 04 Jul 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Shri Sunilkumar Vishnu Madhbhavi | Designation | CMPPD | Name of Company (Applicant Name should not be given here) | JAWAHARLAL NEHRU PORT TRUST | Address | Jawaharlal Nehru Port Trust Admin Building Sheva Uran Navi Mumbai |
|