Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) MEGHMANI ORGANICS LIMITED UNIT-5
(b)Name of the Company / Organisation MEGHMANI ORGANICS LTD UNIT FIVE
(c)Registered Address Meghmani Organics Ltd.(Unit-5), Plot No.: D-2/CH/10 at Dahej-2, GIDC Industrial Estate Dahej, Tal.-Vagra, Dist.-Bharuch, Gujarat,,Bharuch,Gujarat-392130
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Karna R Patel
(b)Designation (Owner/ Partner/ CEO) Director
(c)Address Meghmani Organics Ltd. Unit-5, Plot No.D-2/CH10 at Dahej-2, GIDC Industrial Estate Dahej, Tal.-Vagra, Dist.-Bharruch, Gujarat,,Vagra,Bharuch,Gujarat-392130
(d)Pin code 392130
(e)E-mail molunit5@gmail.com
(f)STD Code. 2641(f)Telephone No. 291017
(g)Fax No. 291017
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(b) Pesticides industry and pesticide specific intermediates (excluding formulations)
Minor Activity
(b)Category A
(c)Proposal Number IA/GJ/IND2/105464/2017
(d)Master Proposal Number(Single Window) SW/105461/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. D-2/CH/10, DAHEJ-2, GIDC INDUSTRIAL ESTATE, DAHEJ
(b)Pincode 392130
(c)Bounded Latitudes (North)
From
Degree 21.72413611
Minutes
Second
From
Degree 21.72783333
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 72.61416667
Minutes
Second
From
Degree 72.61666667
Minutes
Second
(e)Survey of India Topo Sheet No. F43M09, F43M10 (SOI)
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 16
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0.0
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Gujarat
Details of State of the project
S. No. State Name District Name Tehsil Name Village Name
NIL
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/506/2017-IA-II(I)
(b)Date of Apply of TOR 24 Oct 2017
(c)Date of Issue of TOR / Standard ToR 09 Dec 2017
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason project located within notified GIDC Area
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)BOILER250 KLD
(2.)COOLING TOWER900 KLD
(3.)RAW WATER STORAGE3068 KLD
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)GROUP A- 2,4 DICHLORO PHENOXY ACETIC ACID/2,4 D AMINE/2,4 D ESTER/ 2,4 D SODIUM/TRICLOPY ACID/TRICLOPY ESTER1000OthersMT/MONTHRoad
(2.)GROUP B- LUFENURON/NOVALURON600OthersMT/MONTHRoad
(3.)GROUP I- BIFENTHRIN ALCOHOL/LAMDA CYHALOTHRIC ACID/SODIUM SALT OF HTCP/MONO CHLORO ACETIC ACID/CYPERMETHRIC ACID CHLORIDE/META PHENOXY BENZALDEHYDE600OthersMT/MONTHRoad
(4.)OTHER- BUPROFEZIN/CHLORANTRANILIPROLE/CHLOROPYRIFOS/CYPROCONAZOLE/DIFENTHIURON/DINOTEFURAN/EMAMECTIN BENZOATE/ETHAPHON/FIPRONIL/FLONICAMIDE/MPB ALCOHOL/ PROMETRIN/ PROPARGITE/SPIROMESIFEN/SPIRODICLOFE600OthersMT/MONTHRoad
(5.)GROUP P- ZETA CYPERMETHRIN/ALPHA CYPERMETHRIN/BETA CYPERMETHRIN/BETA CYFLUTHRIN/BIFENTHRIN/CYPERMETHRINE/DELTAMETHRIN/LAMBDA CYHALOTHRIN/PERMETRINE/TRANSFLUTHRIN/CYFLUTHRINE600OthersMT/MONTHRoad
(6.)INORGANIC- POLY ALUMINIUM CHLORIDE3092OthersMT/MONTHRoad
(7.)GROUP NN- ACETAMAPRIDE/IMIDACLOPRIDE/THIAMETHOXAM600OthersMT/MONTHRoad
(8.)GROUP O- ACEPHATE/PROPHENOPHOS600OthersMT/MONTHRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 70
(b) Funds Allocated for Environment Management (Capital) (in Crores) 4.26
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 1.4
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 33.71
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? No
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 1827951.6
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 1827951.6
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)2,4 D ACID11424Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(2.)2% PHOSPHORIC ACID1440Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(3.)1-ISOPROPYL-3-T BYTYL THIOUREA4824Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(4.)2, BUTOXY ETHANOL6000Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(5.)2,3,5,6 TETRA FLUOROBENZYL ALCOHOL3564.36Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(6.)2-AMINO-5-CHLORO-N,3-MDIMETHYLBENZAMIDE3168Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(7.)FUEL- FURNACE OIL7008Tons per AnnumLOCAL SUPPLIERRoad10 LinkageCopy of Linkage
(8.)2,5 DICHLORO-4 1,1,2,3,3,3 HAXAFLUORO-PROXY ANILINE5400Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(9.)FUEL-LDO2628Tons per AnnumLOCAL SUPPLIERRoad10 LinkageCopy of Linkage
(10.)2-(4-TERT BUTYL PHENOXYCYCLOHEXANOL)5083.2Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(11.)2,6 DIFLUOROBENZAMIDE2970Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(12.)ALL 157 RAW MATERIALS ARE MENTIONED IN TABLE 2.4 OF CHAPTER 2 OF EIA REPORT1798936Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(13.)1,2,4 TRIAZOLE2388.24Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
(14.)FUEL-IMPORTED COAL67525Tons per AnnumLOCAL SUPPLIERRoad10 LinkageCopy of Linkage
(15.)2,6-DIFLUORO BENZOYL ISOCYANATE2304Tons per AnnumLOCAL SUPPLIERRoad50 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Oct 2017 To 01 Dec 2017
(b)Season Winter
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)NOxMicro Gram per Meter Cube3283280
(2.)PM2.5Micro Gram per Meter Cube39123960
(3.)OthersCOMili Gram per Meter Cube1.30.51.32
(4.)SO2Micro Gram per Meter Cube3983980
(5.)PM10Micro Gram per Meter Cube925892100
    14.2.     No. of Ground Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA8.368.036.58.5
(2.)TDSmg/l545023200
(3.)Chloridesmg/l148919200
(4.)OthersCODmg/l39410030
(5.)TSSmg/l3003000
(6.)Total Hardnessmg/l111012000
(7.)Fluoridemg/l0.410.21.52
    14.3.     No. of Surface Water monitoring locations : 7
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)DOmg/l53.4B
(2.)CODmg/l10320B
(3.)OthersTDSmg/l1179261B
(4.)pHNA8.87.97B
(5.)BODmg/l870B
    14.4.     No. of Ambient Noise monitoring locations : 8
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))583870
(2.)Leq(Day)A-weighted decibels(dB(A))664675
    14.5.     No. of Soil Sample Monitored locations : 8
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)K(Potassium)Milligram per Kilogram715195
(2.)Electric ConductivityOthersMICROSIMENS/CM1244.7283.83
(3.)P(Phosphorus)Milligram per Kilogram6.22.15
(4.)pH9.38.48
(5.)N(Nitrogen)Milligram per Kilogram00
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 5 To 5
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10 To 10
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersGIDC30515Copy of Permission LetterPipelineOthersPIPELINEGIDC/SE/CG/BRH/83125 Sep 2018550
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)DOMESTIC SEWAGE4040AEROBIC TREATMENTOthersREUSED IN GARDENING400
(2.)INDUSTRIAL EFFLUENT24171600ADVANCED TREATMENTOthersGIDC DISCHARGE PIPELINE8341583
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 2457
(b)Total Discharged Water (Kilolitre per Day) 1583
(c)Total Reused Water (Kilolitre per Day) 874
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)DISCARDED CONTAINERS/LINERSHazardous Waste (as per Hazardous and Other Waste Management rules 2016)216Tons0RoadAuthorized Recyclers
(2.)TEA HCLHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2059.2Tons0RoadOthersTO END USER
(3.)ALCL3 SOLUTIONHazardous Waste (as per Hazardous and Other Waste Management rules 2016)32268Tons0RoadOthersTO END USERS
(4.)DATE EXPIRY AND OFF SPECIFICATION PESTICIDESHazardous Waste (as per Hazardous and Other Waste Management rules 2016)2Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(5.)KCL SOLUTIONHazardous Waste (as per Hazardous and Other Waste Management rules 2016)18655.2Tons0RoadOthersTO END USER
(6.)SPENT ACIDHazardous Waste (as per Hazardous and Other Waste Management rules 2016)19793.316Tons0RoadOthersTO END USER
(7.)HBR SOLUTIONHazardous Waste (as per Hazardous and Other Waste Management rules 2016)7560Tons0RoadOthersTO END USER
(8.)BROMINEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3348Tons0RoadAuthorized Recyclers
(9.)TRIMETHYL AMMONIUM BROMIDEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)16128Tons0RoadAuthorized Recyclers
(10.)OCPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)108Tons0RoadOthersTO END USER
(11.)ETP WASTEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)9600Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(12.)MI FOR SALEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3468Tons0RoadOthersTO END USER
(13.)HYPOCHLORITEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)4600.8Tons0RoadAuthorized Recyclers
(14.)SBSHazardous Waste (as per Hazardous and Other Waste Management rules 2016)78379.32Tons0RoadOthersTO END USER
(15.)SPENT CARBONHazardous Waste (as per Hazardous and Other Waste Management rules 2016)165.12Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(16.)SPENT RESINHazardous Waste (as per Hazardous and Other Waste Management rules 2016)120Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(17.)2.6 DCPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)696Tons0RoadOthersTO END USER
(18.)2,4,5 TCPHazardous Waste (as per Hazardous and Other Waste Management rules 2016)228Tons0RoadOthersTO END USER
(19.)AMMONIUM SULFATE SOLUTIONHazardous Waste (as per Hazardous and Other Waste Management rules 2016)1476Tons0RoadOthersTO END USER
(20.)MEE SALTBottom Ash18000Tons0RoadTreatment, Storage and Disposal Facility(TSDF)
(21.)HYDROCHLORIC ACID 30%Hazardous Waste (as per Hazardous and Other Waste Management rules 2016)43932Tons0RoadAuthorized Recyclers
(22.)USED OILHazardous Waste (as per Hazardous and Other Waste Management rules 2016)3.6Kilolitre0RoadAuthorized Recyclers
(23.)PROCESS RESIDUEHazardous Waste (as per Hazardous and Other Waste Management rules 2016)6960Tons0RoadOthersCHWIF
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube925396100
(2.)PM2.5Microgram per Meter Cube39524260
(3.)NOxMicrogram per Meter Cube32533680
(4.)SO2Microgram per Meter Cube39524280
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)REACTOR OF 2,4 D ACID/2,4 D SODIUM PLANTNIL150.15OthersHCL,CL220,5
(2.)STEAM BOILERCOAL300.45SO2100
(3.)THERMIC FLUID HEATERCOAL300.45PM10150
(4.)DG SETSDIESEL110.15OthersNONE0
(5.)REACTOR OF MCA/CMAC/MPB/SODIUM SALT OF HTCP PLANTNIL150.15OthersHCL.CL220,5
(6.)BROMINE RECOVERY FOR PROFENOPHOS AND MPBNIL150.15OthersHBr5
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 4000
(b)Source DAKSHIN GUJARAT VIJ COMPANY LIMITED
(c)Uploaded Copy of Agreement Copy of Agreement
(d)Standby Arrangement (Details of DG Sets) ONE 500 KVA DG SET
(e)Stack Height (in m) 11
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 10
    Total Land (ha.) 10
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0057
(b)Waste/Barren Land (ha.) 0.0017
(c)Grazing/ Community Land (ha.) 0.00005
(d)Surface Water Bodies (ha.) 0.0001
(e)Settlements (ha.) 0.0004
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0.0012
(i)Marine Area (ha.) 0.0007
(j)Others (ha.) : CANALS, CREEKS,FALLOW LAND, JETTY, RIVER ROADS, SA 0.0220
    Total (ha.) 0.031849999999999996
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant0.4
(2.)Green belt3.3
(3.)Area for Solid Waste Management0.16
(4.)Built Up Area3
(5.)OthersOPEN LAND3.14
Total (ha.) 10
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)WLSNONE0NOT APPLICABLE
(2.)Wildlife CorridorsNONE0NOT APPLICABLE
(3.)ESAsNONE0NOT APPLICABLE
(4.)Critically Polluted AreaNONE0NOT APPLICABLE
(5.)NPANONE0NOT APPLICABLE
(6.)CorridorsNONE0NOT APPLICABLE
(7.)ESZsNONE0NOT APPLICABLE
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNONE0NOT APPLICABLE
(2.)Archaeological SitesNONE0NOT APPLICABLE
(3.)OthersNONENONE0NOT APPLICABLE
(4.)Defence InstallationsNONE0NOT APPLICABLE
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 10
(b)Land yet to be acquired(Ha) 0
(c)Status of Land acquisition if not acquired LAND HAS ALREADY BEEN ACQUIRED
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Completed
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 50
(c)Temporary Employment- During Construction 50
(d)Temporary Employment- During Operation 50
(e)No. of working days 300
(f)Total Manpower 200
32.
Green Belt in Ha:
(a)Total Area of Green Belt 3.3
(b)Percentage of Total Project Area 33.00
(c)No. of Plants to be Planted 6700
(d)Funds Allocated for Plantation 2300000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialTHE PROJECT WILL BE CARRYING OUT VARIOUS ACTIVITIES UNDER CORPORATE SOCIAL AND ENVIRONMENTAL RESPONSIBILITY THAT WILL BENEFIT PEOPLE RESIDING IN NEAR BY VILLAGES.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA069
(ii)Name of the EIA Consultant ANAND ENVIRONMENTAL CONSULTANTS
(iii)Address ANAND ENVIRONMENTAL CONSULTANTS, 16 EVEREST TOWER, NEAR ANKUR SOCIETY, NARANPURA, AHMEDABAD-13, GUJARAT
(iv)Mobile No. 9825011748
(v)Landline No. 7927484871
(vi)Email Id anandconsultants2009@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 26 Sep 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA- Some of the listed products are covered under banned category for manufacturing/use etc, and the proposal needs to be restructured accordingly. - GIDC has confirmed water supply of 950 cum/day, against the requirement of 3068 cum/day. How the said gap would be addressed. - Please reconfirm by way of an undertaking that none of the chemicals/OBAs/agro-chemicals is banned for manufacturing/use by the concerned regulatory authority, and/or proposed to be phased out under international obligations. 25 May 2019
2.NAThe correction have been made as per the instruction received 31 May 2019
3.NAPesticides covered under banned category and the products not covered under the ambit of the EIA Notification, 2006, still get reflected in Form-2 and remains part of the proposal. Needful may be done as requested earlier also. 05 Jun 2019
4.NAThe correction have been made as per the instruction received 11 Jun 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantKarna R Patel
DesignationDirector
Name of Company (Applicant Name should not be given here)MEGHMANI ORGANICS LTD UNIT FIVE
AddressMeghmani Organics Ltd.(Unit-5), Plot No.: D-2/CH/10 at Dahej-2, GIDC Industrial Estate Dahej, Tal.-Vagra, Dist.-Bharuch, Gujarat
Print