Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) Rahi Kyoung HEP
(b)Name of the Company / Organisation SIKKIM ENGINEERING PVT LTD
(c)Registered Address NIL
(d)Legal Status of the Company NIL
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Vijay Kumar A
(b)Designation (Owner/ Partner/ CEO) Sr. Vice President
(c)Address No.1366, R.No 45, Jubilee Hills, Hyderabad-33,,Khairatabad,Hyderabad,Telangana-500033
(d)Pin code 500033
(e)E-mail rahikyoung1@gmail.com
(f)STD Code. 3592(f)Telephone No. 40301100
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity1(c) River Valley projects
Minor Activity
(b)Category A
(c)Proposal Number IA/SK/RIV/27514/2015
(d)Master Proposal Number(Single Window) SW/105268/2019
(e)EAC concerned (for category A Projects only) River Valley and Hydroelectric Projects
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. Salim Pakyel
(b)Pincode 737101
(c)Bounded Latitudes (North)
From
Degree 27.52
Minutes
Second
From
Degree 27.55
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 88.53
Minutes
Second
From
Degree 88.55
Minutes
Second
(e)Survey of India Topo Sheet No. 78 a10
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 1154
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 0
(j)Seismic Zone 4
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Sikkim
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)SikkimManganMangan
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number J-12011/11/2015-IA-1
(b)Date of Apply of TOR 05 May 2015
(c)Date of Issue of TOR / Standard ToR 14 Jul 2015
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?No
(b)Whether details of Public Hearing available? Yes
(c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above Yes
     7.1.       Details of Public Hearing
S. No.Details of Advertisement Details of Public Hearing Venue Location DetailsNo. of People AttendedIssues RaisedDesignation of Presiding OfficerOther Designation of Presiding Officer
(1.)
Date of Advertisement :20 Mar 2017
Copy of advertisement :Copy of Advertisement
Copy of Public Hearing :Copy of Public Hearing
Date :20 Apr 2017
Distance of Public Hearing Venue from the Proposed Project :2
Saffo Gumpa Ground, Upper Dzongu, North Sikkim
State :Sikkim
District :Mangan
Tehsil :Mangan
Village :Saffo
171People asked for benefits of ProjectsDistrict Collector
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)Hydro Power Plant25 MW
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Power Generation25OthersMWOthersGrid
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue N/A
(iv)Valid Upto N/A
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date NA
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 215
(b) Funds Allocated for Environment Management (Capital) (in Crores) 16.536
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 3.22
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 16.536
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 23644
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 23644
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Fine aggregate8390Otherscubic meterOpen MarketRoad5 LinkageCopy of Linkage
(2.)coarse aggregate15254Otherscubic metermuckRoad5 LinkageCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 25 May 2016 To 30 May 2019
(b)Season Pre-Monsoon
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube15.910.315.0100
(2.)NOxMicro Gram per Meter Cube6.24.96.080
(3.)PM2.5Micro Gram per Meter Cube6.33.96.060
(4.)SO2Micro Gram per Meter Cube3.62.03.580
    14.2.     No. of Ground Water monitoring locations : 0
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)OthersNANA0000
(2.)TSSNA0000
(3.)pHNA0000
(4.)ChloridesNA0000
(5.)TDSNA0000
(6.)Total HardnessNA0000
(7.)FluorideNA0000
    14.3.     No. of Surface Water monitoring locations : 6
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)CODmg/l7.20.8A
(2.)pHNA7.57.3A
(3.)DOmg/l8.88.2A
(4.)BODmg/l2.40.1A
    14.4.     No. of Ambient Noise monitoring locations : 6
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Day)A-weighted decibels(dB(A))53.651.555
(2.)Leq(Night)A-weighted decibels(dB(A))40.839.045
    14.5.     No. of Soil Sample Monitored locations : 6
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)N(Nitrogen)Kilogram per hectare434.6389.5
(2.)Electric ConductivityOthersmicro mho/cm1012.2940.5
(3.)pH6.96.6
(4.)K(Potassium)Kilogram per hectare161.0135.0
(5.)P(Phosphorus)Kilogram per hectare23.719.3
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 0 To 0
(c)Whether Ground Water Intersection will be there ? No
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)Surface6860160Copy of Permission LettermodeOthersTunnelWeirNA29 Mar 2012686016
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)0000OthersNA00
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 0
(b)Total Discharged Water (Kilolitre per Day) 0
(c)Total Reused Water (Kilolitre per Day) 0
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Solid WasteMunicipal Solid Waste182.50Tons0.5RoadOthersTreatment, Storage and Disposal Facility (TSDF)
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube15.90.50015.95100
(2.)NOxMicrogram per Meter Cube6.20.5006.380
(3.)PM2.5Microgram per Meter Cube6.30.5006.460
(4.)SO2Microgram per Meter Cube3.60.5003.6180
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)0000OthersNA0
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 2000
(b)Source distribution network of department of power, Sikki
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 5
(e)Stack Height (in m) 0
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 4.7685
(b)Private Land (ha.) 10.7873
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0
    Total Land (ha.) 15.5558
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 0.0
(b)Waste/Barren Land (ha.) 581.0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 27.0
(e)Settlements (ha.) 123.0
(f)Industrial (ha.) 0.0
(g)Forest (ha.) 32897.0
(h)Mangroves (ha.) 0.0
(i)Marine Area (ha.) 0.0
(j)Others (ha.) : Scrub Land/ Snow cover 3804.0
    Total (ha.) 37432
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Main Plant15.5558
Total (ha.) 15.5558
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA00
(2.)WLSNA00
(3.)ESZsAround the boundary of KNP0.0660
(4.)NPAKhangchendzonga National Park0.09125 m ESZ declared
(5.)CorridorsNA00
(6.)ESAsNA00
(7.)Wildlife CorridorsNA00
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)Archaeological SitesNA00
(2.)ForestNA00
(3.)Defence InstallationsNA00
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) Not Applicable
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0
(b)Land yet to be acquired(Ha) 15.5558
(c)Status of Land acquisition if not acquired NA
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 1
(b)No. of Households 40
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 124
(e)Funds Allocated for R&R(in INR) (in Lacs) 794.00
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? No
(b)Whether conservation plan for Schedule-I Species has been prepared ? No
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? No
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? No
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 50
(b)Permanent Employment-During Operation 30
(c)Temporary Employment- During Construction 300
(d)Temporary Employment- During Operation 20
(e)No. of working days 22
(f)Total Manpower 400
32.
Green Belt in Ha:
(a)Total Area of Green Belt 4
(b)Percentage of Total Project Area 25.71
(c)No. of Plants to be Planted 3000
(d)Funds Allocated for Plantation 2500000
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)SocialEnergy generated from this project would ameliorate the pressure on the regional grid by reducing the deficit of energy generation that is affecting the region and, in turn, affecting the overall energy generation scenario of the country.
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details For River Valley and Hydroelectric Projects
S. No.Item Details
1. Project Sub Sector Hydroelectric Project
2. Name of the River Rahi Chhu
3.
Whether Cumulative Impact Assessment and Carrying Capacity Study of River Basin is Carried Out? No
     4.      Type of Project: (Construction of Dam/ Barrage/ Run of the River/ Lift Irrigation Scheme)
S. No.Project TypeDam Height (in meters)Dam Length (in meters)Total Submergence Area (in hectare)Gross Command Area (GCA) (in hectare)Irrigable Command Area (ICA) (in hectare)Culturable Command Area (CCA) (in hectare)Total Command Area (in hectare)
(1.)Run of River02100000
5.
Powerhouse Installed Capacity No
(a) Type of Powerhouse Underground
(b) Capacity (in megawatts) 25
(c) No. of Tunnels 1
(d) No. of Units 3
(e) Bank of River Left
6.
Generation of Electricity Annually.
(a) Quantity of Generation of Electricity Annually (in giga watt hours) 0
(b) Water Availability at Various percentage
S. No.PercentageWater availability (in cusecs)Dependable yearRemarks
(1.)50 %505.1220022001-02
(2.)75 %477.1020042003-04
(3.)90 %414.5920102009-2010
(c) Machine Availability (in percent) 0
(d) Cost of Electricity Generation (in INR) 0
(e) Internal Rate of Return (in percent) 0
(f) Year of achievement of Internal Rate of Return 0
7. Catchment Area Treatment Plan Copy of Catchment Plan
8.
Muck Management Plan
(a)Muck Management Plan Copy of Muck Management Plan
(b) Total Excavation Muck (in cubic meter) 164069
(c) Utilized for Construction (in cubic meter)112821
(d) No. of Muck Disposal sites6
(e) Total Muck Disposal Area (in hectare)1.8055
9.
Fishery Development and Management Plan
(a)Fishery Development and Management Plan Copy of Fishery Development and Management Plan
(b) No. of Fish Species 0
(c) Name of the umbrella Fish Species (Scientific Name)Schizothorax richardsonii, Schizothorax curvifrons
10.
Status of Environmental Flow
S. No.SeasonAverage Inflow (in cumec)Percent of Flow
(1.)Lean0.00000033720
(2.)Monsoon0.00000207525
(3.)Non-Lean Non-Monsoon0.000000820
11. Free Flow Stretch (in km) 0
12.
Approval of Central Water Commission No
13.
Approval of Central Electricity Authority No
14.
Details of Coffer Dam (Upstream) None
15.
Details of Coffer Dam (Downstream) None
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. NABET/EIA/1619/SA075
(ii)Name of the EIA Consultant R S ENVIROLINK TECHNOLOGIES PVT. LTD.
(iii)Address 402, BESTECH CHAMBERS COMMERCIAL PLAZA
(iv)Mobile No. 9810136853
(v)Landline No. 0124429538
(vi)Email Id ravi@rstechnologies.co.in
(vii)Category of Accreditation A
(viii)Sector of Accreditation River Valley and Hydroelectric Projects
(ix)Validity of Accreditation 15 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NA1. Base line dat collected in August, 2015 and April, 2016 is more than 3 years old. Thus, base line data needs to be collected afresh. 2. CER to be submitted as per OM dated 1.5.2018. 3. KML file to be submitted afresh. 4. Correction to be made in Form-2 regarding forest land and Schedule-I Species. 20 May 2019
2.NAThe correction have been made as per the instruction received 13 Jun 2019
            Additional Detail Sought:
Sno. ADS Letter Remarks Date of ADS
1.NA

Deferred

06 Aug 2019
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantVijay Kumar A
DesignationSr. Vice President
Name of Company (Applicant Name should not be given here)SIKKIM ENGINEERING PVT LTD
AddressSonam Complex, Jeevantheng Marg, Development Area, Gangtok, Sikkim
Print