1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Enhancement in Cement Production Capacity (1.37 to 2.0 MTPA), Clinker (1.0 to 3.0 MTPA), CPP (18 to 25 MW) & WHRB (15 MW) at Village: Ghorawat, Tehsil: Pipar City (Earlier Bhopalgarh), District: Jodhp | (b)Name of the Company / Organisation | MARWAR CEMENT LIMITED | (c)Registered Address | Office No. 31, Saraswati Bhawan, off
Ganjawalalane ,Chamunda Circle, Boriwali West, Mumbai,,Jodhpur,Rajasthan-400091 | (d)Legal Status of the Company | Central Government | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Motilal Chouhan | (b)Designation (Owner/ Partner/ CEO) | Director | (c)Address | Ground Floor, Jodhpur Tower, Dharam Narain Ji Ka Hatha, Paota, Jodhpur,,Jodhpur,Jodhpur,Rajasthan-342010 | (d)Pin code | 342010 | (e)E-mail | vedantaindustries@yahoo.co.in | (f)STD Code. | 291(f)Telephone No. | 2540550 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 3(b) Cement plants
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/RJ/IND/27438/2015 | (d)Master Proposal Number(Single Window) | SW/105248/2019 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 1 | (f)Project Type | Fresh EC |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | List of Khasra no. along with khasra map is enclos | (b)Pincode | 342603 | (c)Bounded Latitudes (North) | | From | | Degree | 263030.53 | Minutes | | Second | | From | | Degree | 263054.28 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 734541.56 | Minutes | | Second | | From | | Degree | 734626.38 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 45 F/10, 45 F/11, 45 F/14 & 45 F/15 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 308 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 3.0 | (j)Seismic Zone | 2 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Rajasthan | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Karnataka | Bellary | Sandur | Ittanahalli/Taranagar | (2.) | Rajasthan | Jodhpur | Bhopalgarh | | |
|
6. | Details of Terms of Reference (ToR): | (a)MoEF&CC / SEIAA File Number | J-11011/154/2009-IA-II(I) | (b)Date of Apply of TOR | 01 Jun 2015 | (c)Date of Issue of TOR / Standard ToR | 22 Jul 2015 | (d)Previous TOR Letter | Copy of Previous TOR letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | No | (b)Whether details of Public Hearing available? | Yes | (c)Whether Public hearing was presided over by an officer of the rank of Additional District Magistrate or above | Yes | |
|
7.1. Details of Public Hearing |
---|
|
S. No. | Details of Advertisement | Details of Public Hearing | Venue | Location Details | No. of People Attended | Issues Raised | Designation of Presiding Officer | Other Designation of Presiding Officer |
---|
(1.) | | Copy of Public Hearing : | Copy of Public Hearing | Date : | 27 Aug 2018 | Distance of Public Hearing Venue from the Proposed Project : | 5 |
| Dadhimati Mataji ka Mandir | State : | Rajasthan | District : | Jodhpur | Tehsil : | Bhopalgarh | Village : | Village - Borunda |
| 84 | Issues related to Employment, Environment, CSR activities related, Water related etc. | Others | Additional District Magistrate | |
8. | Details of Project Configuration/Product: | |
|
8.1. Project Configuration |
---|
S. No. | Plant/Equipment/Facility | Configuration | Remarks |
---|
(1.) | Corrective/ coal stacker | 100 TPH + 150 TPH = 250 TPH | | (2.) | Coal Crusher | 100 TPH + 150 TPH = 250 TPH | | (3.) | Pyro Processing – Rotary Kiln | 3000 TPD + 6000 TPD = 9000 TPD | | (4.) | Cement Mill | 150 TPH + 150 TPH = 300 TPH | | (5.) | Truck Loading machine | 3 x 120 TPH + 3 x 120 TPH = 6 x 120 TPH | | (6.) | LS Stacker | 700 TPH + 1300 TPH = 2000 TPH | | (7.) | LS reclaimer | 300 TPH + 700 TPH = 1000 TPH | | (8.) | Packers | 2 x 120 TPH + 2 x 120 TPH = 4 x 120 TPH | | (9.) | Corrective Crusher | 100 TPH + 150 TPH = 250 TPH | | (10.) | Corrective coal reclaimer | 50 TPH + 100 TPH = 150 TPH | | (11.) | Coal Mill | 50 TPH + 0 = 50 TPH | | (12.) | Raw Mill (VRM) | 1 x 400 TPH + 1 x 400 TPH = 2 x 400 TPH | | |
8.2. Product |
---|
S. No. | Product/Activity (Capacity/Area) | Quantity | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Clinker | 3.0 | Others | MTPA | Road,Rail | | (2.) | WHRB | 15 | Mega Watt(MW) | | Others | Captive Use | (3.) | Captive Power Plant | 25 | Mega Watt(MW) | | Others | Captive use | (4.) | Cement | 2.0 | Others | MTPA | Road,Rail | | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | Details Not Applicable | |
|
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | N/A | (iv)Valid Upto | N/A | (v)File No. | NA | (vi)Application No. | NA | (vii)Copy of Consent to operate valid as on date | NA | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 1600 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 30 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 8 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 4.5 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 6.276 | (b)Existing quantity of raw material/fuel | N/A | (c)Total quantity of raw material/fuel | 6.276 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Petcoke | 0.30 | Others | MTPA | Imported - USA | Rail | | 650 | MoU | | Copy of Linkage | (2.) | Limestone | 4.57 | Others | MTPA | Captive Mines | Conveyor Belt | | 0 | Captive | | Copy of Linkage | (3.) | Fly ash | 0.66 | Others | MTPA | CPP and TPP located in nearby area | Road | | 300 | Open Market | Captive and Open Market | Copy of Linkage | (4.) | GYPSUM | 0.1 | Others | MTPA | RSMM / Imported | Road,Rail | | 300 | MoU | | Copy of Linkage | (5.) | Red Ochre/Iron Ore | 0.05 | Others | MTPA | Private Mine owner | Road | | 100 | Open Market | | Copy of Linkage | (6.) | Silica Sand | 0.06 | Others | MTPA | Private Mine owner | Road | | 10 | Open Market | | Copy of Linkage | (7.) | Coal | 0.536 | Others | MTPA | Imported - S. Africa & USA & Indigenous - Local | Road | | 650 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Mar 2016 To 31 May 2016 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 13 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | Others | CO | Mili Gram per Meter Cube | 0.89 | 0.66 | 0.88 | 4 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 38.2 | 22.2 | 37.88 | 60 | (3.) | SO2 | | Micro Gram per Meter Cube | 9.5 | 5.0 | 9.41 | 80 | (4.) | PM10 | | Micro Gram per Meter Cube | 76.3 | 59.3 | 75.96 | 100 | (5.) | NOx | | Micro Gram per Meter Cube | 22.5 | 13.0 | 21.31 | 80 | |
14.2. No. of Ground Water monitoring locations : 10 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (2.) | TDS | | | mg/l | | 1973 | 1088 | 500 | 2000 | (3.) | Total Hardness | | | mg/l | | 590.10 | 310.40 | 200 | 600 | (4.) | Chlorides | | | mg/l | | 913.19 | 327.26 | 250 | 1000 | (5.) | Fluoride | | | mg/l | | 1.47 | 1.08 | 1.0 | 1.5 | (6.) | pH | | | NA | | 7.90 | 7.20 | 8.5 | 8.5 | (7.) | Heavy Metals | | All Heavy Metals | NA | | 0 | 0 | 0 | 0 | |
14.3. No. of Surface Water monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.61 | 7.10 | E | (2.) | DO | | mg/l | | 6.2 | 6.0 | E | (3.) | COD | | mg/l | | 20.10 | 18.0 | E | (4.) | Others | TDS | mg/l | | 196 | 148 | E | (5.) | BOD | | mg/l | | 5.2 | 4.8 | E | |
14.4. No. of Ambient Noise monitoring locations : 13 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 43.8 | 38.2 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 54.3 | 49.2 | 75 | |
14.5. No. of Soil Sample Monitored locations : 10 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | P(Phosphorus) | Kilogram per hectare | | 18.40 | 12.42 | (2.) | Electric Conductivity | Millisiemens per Centimetre | | 0.32 | 0.17 | (3.) | N(Nitrogen) | Kilogram per hectare | | 276.20 | 193.32 | (4.) | K(Potassium) | Kilogram per hectare | | 136.64 | 63.04 | (5.) | pH | | | 7.74 | 7.12 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 108 To 137 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 105 To 134 | (c)Whether Ground Water Intersection will be there ? | NA | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | GroundWater | | 1160 | 0 | Copy of Permission Letter | Pipeline | | Tube Well | | 21-4 (386)/WR/CGWA/2009-747 | 05 Nov 2009 | 850 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Boiler Blow Down & RO reject | 80 | 0 | Neutralization pit | Others | Use for dust suppression | 80 | 0 | (2.) | Domestic Waste Water | 50 | 120 | Sewage Treatment Plant | Reuse within the Plant & Recycling | | 50 | | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 130 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 130 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Industrial Waste | Fly Ash | | 30000 | Tons | 0 | Pipe Conveyor | | Others | Utilization in manufacturing of PPC grade cement | (2.) | Used Oil & Grease | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 50 | Kilolitre | 0 | Road | | Authorized Recyclers | | (3.) | Industrial Waste | Bottom Ash | | 20000 | Tons | 0 | Pipe Conveyor | | Others | Utilization in manufacturing of PPC grade cement | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 73.2 | 1.0 | 5.21 | 78.51 | 100 | (2.) | SO2 | | Microgram per Meter Cube | 9.5 | 0.7 | 3.26 | 12.77 | 80 | (3.) | PM2.5 | | Microgram per Meter Cube | 035.6 | 1.0 | 0 | 35.8 | 60 | (4.) | NOx | | Microgram per Meter Cube | 22.1 | 0.7 | 4.81 | 26.92 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Clinker Cooler | NA | 50 | 3.73 | PM10 | | 9.44 mg/Nm3 | (2.) | Cement Mill | NA | 55 | 4.0 | PM10 | | 11.23 mg/Nm3 | (3.) | Raw Mill & Kiln | Petcoke & Coal | 152 | 4.98 | NOx | | 362.58 mg/Nm3 | (4.) | CPP Boiler | Coal | 92 | 1.9 | NOx | | 55.75 mg/Nm3 | (5.) | Raw Mill & Kiln | Petcoke & Coal | 152 | 4.98 | SO2 | | 110.77 mg/Nm3 | (6.) | Coal Mill | NA | 65 | 2.09 | PM10 | | 2.09 mg/Nm3 | (7.) | CPP Boiler | Coal | 92 | 1.9 | SO2 | | 111.49 mg/Nm3 | (8.) | Raw Mill & Kiln | Petcoke & Coal | 152 | 4.98 | PM10 | | 18.13 mg / Nm3 | (9.) | CPP Boiler | Coal | 92 | 1.9 | PM10 | | 9.29 mg/Nm3 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 42000 | (b)Source | Captive Power Plant, WHRB & State Grid | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 5 MW | (e)Stack Height (in m) | 32 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 57.87 | Total Land (ha.) | 57.87 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 57.87 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : NA | 0 | Total (ha.) | 57.8700 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Main Plant | | 8.4 | | (2.) | Township | | 2.4 | | (3.) | Green belt | | 19.1 | | (4.) | Others | Open area | 27.97 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Not applicable | 0 | No Critically Polluted area within 10 km raduis | (2.) | WLS | Not applicable | 0 | No WLS within 10 km radius | (3.) | NPA | Not applicable | 0 | No NPA within 10 km radius | (4.) | ESAs | Not applicable | 0 | No ESAs within 10 km radius | (5.) | Corridors | Not applicable | 0 | No Corridors within 10 km radius | (6.) | Wildlife Corridors | Not applicable | 0 | No Wildlife Corridors within 10 km radius | (7.) | ESZs | Not applicable | 0 | No ESZs within 10 km radius | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | Not applicable | 0 | No Defense Installation within 10 km radius | (2.) | Forest | | Not applicable | 0 | No forest within 10 km radius | (3.) | Archaeological Sites | | Not applicable | 0 | No Archaeological Sites within 10 km radius | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | Not Applicable | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 57.87 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Not applicable | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | Yes | (i)Details of Schedule-I Species | Peafowl & Chinkara | (b)Whether conservation plan for Schedule-I Species has been prepared ? | Yes | (i)Uploaded copy of conservation plan | Copy of conservation plan | (ii)Fund Provision made | 20.94 Lacs | (iii)Period of Implementation | 9 Years | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Jojri Nadi | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 1.8 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 350 | (c)Temporary Employment- During Construction | 1500 | (d)Temporary Employment- During Operation | 600 | (e)No. of working days | 26 | (f)Total Manpower | 2500 | |
|
32. | Green Belt in Ha: | (a)Total Area of Green Belt | 19.1 | (b)Percentage of Total Project Area | 33.01 | (c)No. of Plants to be Planted | 28600 | (d)Funds Allocated for Plantation | 1500000 | (e)Uploaded Green Belt plan | Copy of Green Belt Plan | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Financial | Revenue generation for State and Centre in terms of taxes etc. | (2.) | Social | Employment generation and upliftment of the nearby villagers through CER. | (3.) | Environmental | Greenery of the area will be increased. | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 1 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/2023/RA 0186 | (ii)Name of the EIA Consultant | J.M. EnviroNet Pvt. Ltd. | (iii)Address | 202 - A, ABW Tower, Near IFFCO Chowk, Sector - 25, Gurugram (Haryana) | (iv)Mobile No. | 9910494521 | (v)Landline No. | 0124414192 | (vi)Email Id | jmenviron@hotmail.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 1 | (ix)Validity of Accreditation | 07 Feb 2023 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | i. CGWA water abstraction permission is of 5.10.2009 and already expired on 4.10.2011. Renewed water abstraction permission may be furnished. Possibility to use surface water in place of Ground water may also be submitted.
ii. Implementation status of the existing project has not been furnished.
iii. Recent certified compliance report of Regional Office of the MoEF&CC shall be furnished.
iv.Base line data is of March – May, 2016 which is more than three years old. Re-validation of baseline data may be carried out. | 18 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 21 Dec 2020 | 3. | NA | our proposal is rejected due to the following:
ToR date = 22/07/2015
Baseline data collection = March - May 2016
ToR validity extension = 16/08/2018 till 21/07/2019
PH date = 27/08/2018
EC application & EDS raised on = 18/06/2019
EDS reply date = 21/12/2020 (After lapse of 1.5 years)
On perusal of the proposal, neither the form 2 nor the EIA report has been updated based on the EDS points raised.
In the present case, PP has submitted the revised application for grant of EC on 21/12/2020.
Since the application EC has not been submitted within the validity period of ToR, the process shall be started de-novo.
In view of this, the proposal is returned to the PP with a request to start the process de-novo. | 22 Dec 2020 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | Motilal Chouhan | Designation | Director | Name of Company (Applicant Name should not be given here) | MARWAR CEMENT LIMITED | Address | Office No. 31, Saraswati Bhawan, off
Ganjawalalane ,Chamunda Circle, Boriwali West, Mumbai |
|