|
1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Expansion of D Mall (Shopping Complex) | (b)Name of the Company / Organisation | MERA BABA REALITY ASSOCIATES PVT LTD | (c)Registered Address | DMALL, PLOT NO-A1, NETAJI SUBHASH PLACE, PITAMPURA, NEW DELHI,,North West,Delhi-110034 | (d)Legal Status of the Company | Private | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | MADAN MOHAN | (b)Designation (Owner/ Partner/ CEO) | DIRECTOR | (c)Address | 354, TARUN ENCLAVE, PITAMPURA, DELHI,,Saraswati Vihar,North West,Delhi-110034 | (d)Pin code | 110034 | (e)E-mail | mera_baba@rediffmail.com | (f)STD Code. | 11(f)Telephone No. | 43900000 | (g)Fax No. | | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 8(a) Building and Construction projects
| Minor Activity | 8(a) Building and Construction projects
| (b)Category | B2 | Reason for Applying at Ministry | SEIAA | (c)Proposal Number | IA/DL/MIS/104928/2008 | (d)Master Proposal Number(Single Window) | SW/104779/2019 | (e)EAC concerned (for category A Projects only) | INFRA-2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | Plot No. A-1 | (b)Pincode | 110052 | (c)Bounded Latitudes (North) | | From | | Degree | 3175776.31 | Minutes | | Second | | From | | Degree | 3175867.31 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 710303.68 | Minutes | | Second | | From | | Degree | 710332.98 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 53H01 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 223 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.31 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Delhi | |
|
|
Details of State of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
NIL | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | 21-62/2019-IA-III | (c)Date of Issue of TOR | 26 Aug 2008 | (f)Previous TOR Letter | Copy of Previous TOR letter | (b)Date of Apply of EC | 03 Jul 2019 | (c)Date of Issue of EC | 18 Oct 2019 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | As per EIA Notification 2006 and its amendment, al | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Lucknow | (iii)Letter No. | 4-578/08 | (iv)Status of Compliance | Compiled | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | May 29 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | plot area | 5124.228 | 0 | 5124.228 | Others | square meters | Others | NA | (2.) | Total Built-up Area | 31297.24 | 3506.16 | 34803.4 | Others | Not Applicable | Others | Not Applicable | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | - | - | - | - | - | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 28 Aug 2018 | (iv)Valid Upto | 30 Jan 2023 | (v)File No. | DPCC/CMC/2018/45076 | (vi)Application No. | DPCC/CMC/2018/45076 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 4.5100 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 0.26 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 0.045 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 0.062 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | No | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 0 | (b)Existing quantity of raw material/fuel | 0 | (c)Total quantity of raw material/fuel | 0 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | it is a construction project | 1 | Others | N/A | Local nearby market | Road | | 1 | MoU | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 22 Apr 2019 To 27 Apr 2019 | (b)Season | Summer | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 2 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 218.3 | 214.2 | 213.2 | 100 | (2.) | NOx | | Micro Gram per Meter Cube | 48.1 | 46.3 | 45.3 | 80 | (3.) | PM2.5 | | Micro Gram per Meter Cube | 115.8 | 108.4 | 107.4 | 60 | (4.) | SO2 | | Micro Gram per Meter Cube | 14.1 | 13.8 | 12.8 | 80 | |
14.2. No. of Ground Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | TDS | | | mg/l | | 1859 | 1859 | 500 | 500 | (2.) | Chlorides | | | mg/l | | 112 | 112 | 250 | 250 | (3.) | Fluoride | | | mg/l | | 0.85 | 0.85 | 1 | 1 | (4.) | pH | | | NA | | 7.1 | 7.1 | 8.5 | 8.5 | (5.) | TSS | | | mg/l | | 0 | 0 | 0 | 0 | (6.) | Total Hardness | | | mg/l | | 408 | 408 | 200 | 200 | (7.) | Others | alkalinity | | mg/l | | 380 | 380 | 200 | 200 | |
14.3. No. of Surface Water monitoring locations : 1 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 7.1 | 7.1 | E | (2.) | Others | TSS | mg/l | | 120 | 120 | E | (3.) | BOD | | mg/l | | 36 | 36 | E | (4.) | DO | | mg/l | | 4.5 | 4.5 | E | (5.) | COD | | mg/l | | 100 | 100 | E | |
14.4. No. of Ambient Noise monitoring locations : 1 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Day) | A-weighted decibels(dB(A)) | 58.2 | 58.2 | 65 | (2.) | Leq(Night) | A-weighted decibels(dB(A)) | 48.8 | 48.8 | 55 | |
14.5. No. of Soil Sample Monitored locations : 1 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 77 | 77 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 42.3 | 42.3 | (3.) | K(Potassium) | Milligram per Kilogram | | 76.1 | 76.1 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 735.8 | 735.8 | (5.) | pH | | | 7.2 | 7.2 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 2.4 To 53.17 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.69 To 54.02 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Others | Municipal Supply | 109 | 0 | Copy of Permission Letter | Pipeline | | Others | Pipeline | - | 22 Apr 2019 | 109 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | food court, domestic, flushing, cooling and misc. | 159 | 250 | STP | Reuse within the Plant & Recycling,Green Belt Renewal Plant,Others | losses of 14 KLD | 113 | 46 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 159 | (b)Total Discharged Water (Kilolitre per Day) | 46 | (c)Total Reused Water (Kilolitre per Day) | 113 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Bio Degradable Waste | Municipal Solid Waste | | 110 | Tons | 0 | Road | | Others | organic waste converter | (2.) | non-biodegradable waste | Municipal Solid Waste | | 82 | Tons | 0.1 | Road | | Authorized Recyclers | | (3.) | Plastic waste | Plastic Waste | | 82 | Tons | 0.1 | Road | | Authorized Recyclers | | (4.) | used oil | Hazardous Waste (as per Hazardous and Other Waste Management rules 2016) | | 0.3 | Tons | 0.1 | Road | | Authorized Recyclers | | (5.) | Electronic waste | E Waste | | 0.04 | Tons | 0.1 | Road | | Authorized Recyclers | | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | PM10 | | Microgram per Meter Cube | 216.25 | 0.9 | 0.9 | 217.16 | 100 | (2.) | PM2.5 | | Microgram per Meter Cube | 112.1 | 0.9 | 0.8 | 113.0 | 60 | (3.) | NOx | | Microgram per Meter Cube | 47.2 | 0.9 | 0.9 | 48.2 | 80 | (4.) | SO2 | | Microgram per Meter Cube | 13.95 | 0.9 | 0.3 | 14.26 | 80 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | DG set of capacity 2x1010 kVA | Low sulphur diesel fuel | 55 | 0.55 | SO2 | | 0.15 | (2.) | DG sets of 1x500 kVA | Low sulphur diesel fuel | 62.7 | 0.3 | PM10 | | 0.025 | (3.) | DG sets of 1x500 kVA | Low sulphur diesel | 62.7 | 0.3 | SO2 | | 0.09 | (4.) | DG set of 1x500 kVA | Low sulphur diesel fuel | 62.7 | 0.3 | Others | PM2.5 | 0.010 | (5.) | DG sets of 2x1010 kVA | Low sulphur diesel fuel | 55 | 0.55 | PM10 | | 0.042 | (6.) | DG sets of 1x500 kVA | Low sulphur diesel fuel | 62.7 | 0.3 | NOx | | 0.09 | (7.) | DG sets capacity 2x1010 kVA | Low sulphur diesel fuel | 55 | 0.55 | NOx | | 0.258 | (8.) | DG set of capacity 2x1010 kVA | Low sulphur diesel fuel | 55 | 0.55 | Others | PM2.5 | 0.017 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 2888.88 | (b)Source | Tata Power Delhi Distribution Limited | (c)Uploaded Copy of Agreement | Copy of Agreement | (d)Standby Arrangement (Details of DG Sets) | 2x1010 kVA and 1x500 kVA | (e)Stack Height (in m) | 6 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 0.51242 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 0.51242 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 0 | (b)Waste/Barren Land (ha.) | 0 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 0 | (e)Settlements (ha.) | 0 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 0 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : plot area | 0.51242 | Total (ha.) | 0.51242 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Others | plot area | 0.51242 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Critically Polluted Area | Wazirpur Industrial Area | 1.39 | North East dirction of project | (2.) | WLS | None | 0 | NA | (3.) | Corridors | None | 0 | NA | (4.) | Wildlife Corridors | None | 0 | NA | (5.) | NPA | None | 0 | NA | (6.) | ESZs | None | 0 | NA | (7.) | ESAs | None | 0 | NA | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Defence Installations | | None | 0 | None | (2.) | Archaeological Sites | | Delhi for or Lal Qila | 9.53 | South East of the project | (3.) | Forest | | Northern Ridge Reserve Forest | 6.02 | South East East Direction of the project | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0.51242 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | NA | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | No | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Western Yamuna Canal | (ii)Direction of Water Bodies in Buffer Area | North East | (iii)Distance of Water Bodies in Buffer Area | 0.73 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 0 | (b)Permanent Employment-During Operation | 0 | (c)Temporary Employment- During Construction | 100 | (d)Temporary Employment- During Operation | 450 | (e)No. of working days | 365 | (f)Total Manpower | 550 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 1793.47 | 0 | 1793.47 | (2.) | Percentage of Total Project Area | 35 | 0 | 35 | (3.) | No. of Plants | 40 | 24 | 64 | (4.) | Funds Allocated | 500000 | 0 | 500000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
(1.) | Environmental | Green Area Development | (2.) | Social | Employment Generation | (3.) | Financial | Revenue Generation | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details For INFRA-2 |
|
1. | Details of Building Construction: | (a)Maximum Height of the Building (Meters) | 71 | (b)Total No. of Flats to be Build | 0 | (c)No. of Buildings | 1 | (d)Total plot area (sqm) | 5124.228 | (e)Total built up area (sqm) | 34803.4 | |
|
2. | Foreshore Facilities and/or Marine Disposal: | (a)Whether Project Involves Foreshore Activities and/or marine Disposal? | No | |
|
3. | Rain Water Harvesting: | (a)No. of Storage | 0 | (b)Capacity | 0 | (c)No. of Recharge Pits | 1 | (d)Capacity | 91 | |
|
4. | Parking: | (a)Details of 4 Wheeler/ 2 Wheeler Parking | 482 ECS | |
|
5. | Energy Saving Measures: | (a)Source/Mode | Solar & LED | (b)Percentage | 1 | (c)Quantity | 28.88 | |
|
|
7. Type of Industries to be established with Industrial Estate as per their category A/B |
---|
S. No. | Type of Industry | No. of Units | Category A/B |
---|
NIL | |
8. | Length of the alignment | N/A | |
|
9. | Details Bridges/ROB/Interchanges,Flyovers,Vehicle Underpass and Pedestrian Underpass | Details Not Applicable | |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | No | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | Rev. 75, 10th April, 2019, Serial No. 119 | (ii)Name of the EIA Consultant | Perfact EnviroSolutions Pvt. Ltd. | (iii)Address | 5th floor, NN Mall, Mangalam Palace, Sector-3, Rohini, New Delhi | (iv)Mobile No. | 9818362330 | (v)Landline No. | 0114928136 | (vi)Email Id | info@perfactgroup.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | INFRA-2 | (ix)Validity of Accreditation | 27 May 2019 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | Kindly submit/upload the following documents for further consideration:
(i) Upload Form-1 and 1-A.
(ii) This is an expansion project. In all expansion cases, Certified Compliance Report issued by the MoEF&CC, Regional Office or concerned regional office of Central Pollution Control Board or the Member Secretary of the respective State Pollution Control Board is to be submitted by the Project Proponent for consideration of the proposal. Kindly submit the same.
(iii) Submit Plan for Corporate Environment Responsibility (CER) as specified under Ministry’s Office Memorandum vide F.No. 22-65/2017-IA.III dated 1st May 2018. | 24 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 03 Jul 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |
| Name of Applicant | MADAN MOHAN | Designation | DIRECTOR | Name of Company (Applicant Name should not be given here) | MERA BABA REALITY ASSOCIATES PVT LTD | Address | DMALL, PLOT NO-A1, NETAJI SUBHASH PLACE, PITAMPURA, NEW DELHI |
|