Form-2
APPLICATION FOR PRIOR ENVIRONMENTAL CLEARANCE
S. No.Item Details
1.
Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? No
Details of Project:
(a)Name of the project(s) AD Pharmachem Pvt. Ltd.
(b)Name of the Company / Organisation AD PHARMACHEM PVT LTD
(c)Registered Address Plot No. A-86, Paithan MIDC, Paithan,,Aurangabad,Maharashtra-431148
(d)Legal Status of the Company Private
(e)Joint Venture No
2.
Address for the correspondence:
(a)Name of the Applicant Dinkar B Arbale
(b)Designation (Owner/ Partner/ CEO) MD
(c)Address Plot No. A-86, Paithan MIDC, Paithan,,Paithan,Aurangabad,Maharashtra-431148
(d)Pin code 431148
(e)E-mail dinkar.arbale@gmail.com
(f)STD Code. 240(f)Telephone No. 2333622
(g)Fax No.
(h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . Annexure-Uploaded Copy of documents in support of the competence/authority
3.
Category of the Project/Activity as per Schedule of EIA Notification,2006:
(a.I)Project/Activity5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk
Minor Activity
(b)Category A
(c)Proposal Number IA/MH/IND2/81668/2018
(d)Master Proposal Number(Single Window) SW/104878/2019
(e)EAC concerned (for category A Projects only) Industrial Projects - 2
(f)Project Type Fresh EC
4.
Location of the Project:
(a)Plot/Survey/Khasra No. A-86
(b)Pincode 431107
(c)Bounded Latitudes (North)
From
Degree 19.5333611
Minutes
Second
From
Degree 19.53421388
Minutes
Second
(d)Bounded Longitudes (East)
From
Degree 75.3869500
Minutes
Second
From
Degree 75.3873666
Minutes
Second
(e)Survey of India Topo Sheet No. 47M6, 47M7
(f)Uploaded Topo Sheet File Copy of Topo Sheet File
(g)Maximum Elevation Above Means Sea Level(AMSL) 440
(h)Uploaded (kml) File Copy of Kml File      
(i)Distance of Nearest HFL from the project boundary within the study area 473
(j)Seismic Zone 3
5.
(a)Number of States in which Project will be Executed 1
(b)Main State of the project Maharashtra
Details of State(s) of the project
S. No. State Name District Name Tehsil Name Village Name
(1.)MaharashtraAurangabadPaithan
(2.)MaharashtraKolhapurKagalKagal
6.
Details of Terms of Reference (ToR):
(a)MoEF&CC / SEIAA File Number IA-J-11011/358/2018-IA-II(I)
(b)Date of Apply of TOR 25 Oct 2018
(c)Date of Issue of TOR / Standard ToR 03 Dec 2018
(d)Previous TOR Letter Copy of Previous TOR letter
7.
Details of Public Consultation:
(a)Whether the Project Exempted from Public Hearing?Yes
(b)Reason Project is located in notified industrial area MID
(c)Supporting Document Copy of Supporting Document
8.
Details of Project Configuration/Product:
     8.1.       Project Configuration
S. No.Plant/Equipment/FacilityConfigurationRemarks
(1.)API & Intermediates535Tons Per Month
     8.2.       Product
S. No.Product/Activity (Capacity/Area)QuantityUnitOther UnitMode of Transport / Transmission of ProductOther Mode of Transport / Transmission of Product
(1.)Tetra Butyl Ammonium Bromide150OthersTons Per MonthRoad
(2.)4- Bromo Anisole50OthersTons Per MonthRoad
(3.)4-Bromo Phenetole50OthersTons Per MonthRoad
(4.)Metformin Hydrochloride200OthersTons Per MonthRoad
(5.)Pioglitazone5OthersTons Per MonthRoad
(6.)Tetra Butyl Ammonium Hydrogen Sulphate25OthersTons Per MonthRoad
(7.)4-Methyl Phenacyl Bromide5OthersTons Per MonthRoad
(8.)Cetrimide50OthersTons Per MonthRoad
9.
In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii):
Details Not Applicable
9.1.
Details of Consent to Operate
(i)Whether Consent to operate obtained ? NA
(ii)Copies of all Consent to operate obtained since inception NA
(iii)Date of Issue 10 May 2019
(iv)Valid Upto 10 May 2019
(v)File No. NA
(vi)Application No. NA
(vii)Copy of Consent to operate valid as on date Copy of Consent to Operate
10.
Project Cost:
(a)Total Cost of the Project at current price level (in Crores) 7
(b) Funds Allocated for Environment Management (Capital) (in Crores) 1.4
(c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) 0.14
(d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) 0.14
11.
Whether project attracts the General Condition specified in the Schedule of EIA Notification ? Yes
a)Protected areas notified under the wildlife (Protection) Act, 1972 Yes
12.
Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? No
13.
Raw Material / Fuel Requirement:
(a)Proposed quantity of raw material/fuel 14558.93
(b)Existing quantity of raw material/fuel N/A
(c)Total quantity of raw material/fuel 14558.93
    13.1.        Raw Material / Fuel Profile
S. No.Raw Material / Fuel QuantityUnitOther UnitSource (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received )Mode of TransportOther Mode of TransportDistance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received)Type of Linkage Other Type of Linkage Uploaded Copy of Linkage
(1.)Carbon837Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(2.)n- Butyl amine123900Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(3.)n- Butyl Bromide92850Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(4.)Ethyle Acetate13750Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(5.)Methylene Di Chloride16625Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(6.)Sulfuric Acid5200Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(7.)Dimethyl formamide26000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(8.)Hydrogen Peroxide22100Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(9.)Bromoacetdal dimethyl acetal24600Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(10.)4-Methoxy Acetophenone2125Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(11.)Iso propyl alcohol52000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(12.)Dimethyl Sulphate21550Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(13.)Pioglitazone Base5550Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(14.)Hydrochloric Acid3790Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(15.)Aceto Nitrile15000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(16.)Dimethyl Amine Hydrochloride137000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(17.)Potassium Thiocyanate7550Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(18.)Anisole32000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(19.)Sodium Carbonate2000Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(20.)Bromine52157Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(21.)Sodium Bromide50450Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(22.)Methanol4230Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(23.)hyflo342Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(24.)Tetra Butyl ammonnium bromide24737Tons per AnnumInohuseRoad0 OthersInhouseCopy of Linkage
(25.)Formamine37500Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
(26.)Dycyano di Amide114284Tons per AnnumAurangabadRoad50 Open MarketCopy of Linkage
14.
Baseline Data :
(a)Period of Base Line Data Collection FROM 01 Mar 2018 To 31 May 2018
(b)Season Summer
    14.1.     No. of ambient Air Quality (AAQ) monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsUnitMaximum ValueMinimum Value98 Percentile ValuePrescribed Standard
(1.)PM10Micro Gram per Meter Cube64.8748.4562.52100
(2.)SO2Micro Gram per Meter Cube30.509.5928.6280
(3.)NOxMicro Gram per Meter Cube40.1728.0837.5180
(4.)PM2.5Micro Gram per Meter Cube34.7016.0333.9060
    14.2.     No. of Ground Water monitoring locations : 9
S. No.Criteria Pollutants Other Criteria PollutantsHeavy MetalUnitOther UnitMaximum ValueMinimum ValueDesirable LimitMaximum Permissible Limit
(1.)pHNA7.526.678.50
(2.)TSSmg/l34.600.4000
(3.)TDSmg/l6341345002000
(4.)Total Hardnessmg/l536103200600
(5.)Chloridesmg/l155412501000
(6.)Fluoridemg/l0.030.0111.5
(7.)Heavy MetalsArsenicmg/l000.050
    14.3.     No. of Surface Water monitoring locations : 8
S. No.Criteria Pollutants Other Criteria PollutantsUnitOther UnitMaximum ValueMinimum ValueClassification of inland water body
(1.)pHNA7.906.89A
(2.)BODmg/l2.82.4A
(3.)DOmg/l6.81.2A
(4.)CODmg/l100A
    14.4.     No. of Ambient Noise monitoring locations : 9
S. No.Parameter UnitMaximum ValueMinimum ValuePrescribed Standard
(1.)Leq(Night)A-weighted decibels(dB(A))60.741.465
(2.)Leq(Day)A-weighted decibels(dB(A))66.151.775
    14.5.     No. of Soil Sample Monitored locations : 9
S. No.Parameter UnitOther UnitMaximum ValueMinimum Value
(1.)P(Phosphorus)Milligram per Kilogram12.25.3
(2.)K(Potassium)Milligram per Kilogram621196
(3.)Electric ConductivityMillisiemens per Centimetre0.670.15
(4.)pH8.17.09
(5.)N(Nitrogen)Milligram per Kilogram221125
14.6.
Details of Ground Water Table:
(a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) From 12.8 To 15
(b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) From 10.9 To 7.63
(c)Whether Ground Water Intersection will be there ? NA
     15.      Details of Water Requirement (During Operation)
S. No.Source Source Other Required Quantity (Kilolitre per Day (Kld))Distance from SourceCopy of Permission from Competent Authority Mode of TransportOther Mode of TransportMethod of Water WithdrawalOther Method of Water WithdrawalLetter No.Date of IssuePermitted Quantity
(1.)OthersMIDC Paithan630 Not Appliacble PipelineOthersMIDC PaithanNA13 May 201963
15.1.
(a)Whether Desalination is proposed No
    16.       Waste Water Management(During Operation)
S. No.Type/Source Quantity of Waste Water Generated (Kilolitre per Day)Treatment Capacity (Kilolitre per Day) Treatment MethodMode of DisposalOther Mode of DisposalQuantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day)Quantity of Discharged Water (Kilolitre per Day)
(1.)Boiler0.550Primary+Secondary+Tertiary TreatmentOthersTo ETP00.5
(2.)Process13.7550Primary+Secondary+Tertiary TreatmentOthersTo ETP013.75
(3.)Cooling Tower Make Up / Cooling4.550Primary+Secondary+Tertiary TreatmentOthersTo ETP04.5
(4.)Domestic410Soak PitGreen Belt Renewal Plant4
(5.)Boiler0.550Primary+Secondary+Tertiary TreatmentOthersTo ETP00.5
(6.)DM Water Plant / Purified water regeneration350Primary+Secondary+Tertiary TreatmentOthersETP03
(7.)Vacuum Pump0.350Primary+Secondary+Tertiary TreatmentOthersETP00.3
(8.)PD Lab QC, Micro Lab1.3050Primary+Secondary+Tertiary TreatmentOthersETP01.30
(9.)Equipment washing0.5050Primary+Secondary+Tertiary TreatmentOthersETP00.50
(10.)Softener150Primary+Secondary+Tertiary TreatmentOthersETP01
(11.)Floor washings2.350Primary+Secondary+Tertiary TreatmentOthersETP02.3
(12.)Scrubber150Primary+Secondary+Tertiary TreatmentOthersETP01
16.1.
(a)Total Waste Water Generation (Kilolitre per Day) 32.65
(b)Total Discharged Water (Kilolitre per Day) 28.65
(c)Total Reused Water (Kilolitre per Day) 4
    17.       Solid Waste Generation/Management
S. No.Name of Waste Item Other ItemQuantity per AnnumUnitDistance from Site(KM)Mode of TransportOther Mode of TransportMode of DisposalOther Mode of Disposal
(1.)Mild Steel ScrapIndustrial Waste2.8Tons180RoadTreatment, Storage and Disposal Facility(TSDF)
(2.)Stainless Steel ScrapIndustrial Waste0.7Tons180RoadAuthorized Recyclers
(3.)PaperMunicipal Solid Waste0.13Tons50RoadAuthorized Recyclers
(4.)PolybagsPlastic Waste1.4Tons50RoadAuthorized Recyclers
(5.)Boiler AshFly Ash219Tons180RoadAuthorized Recyclers
18.
    18.1.     Air Quality Impact Prediction
S. No.Criteria Pollutants Other Criteria PollutantsUnitBaseline ConcentrationDistance GLCIncremental ConcentrationTotal GLCPrescribed Standard
(1.)PM10Microgram per Meter Cube64.172000.4165.28100
(2.)SO2Microgram per Meter Cube0000.180
(3.)NOxMicrogram per Meter Cube40.172000.344180
(4.)PM2.5Microgram per Meter Cube34.72000.093560
    18.2.     Stack Details
S. No.Source FuelStack Height(m)Stack Diameter(m)PollutantsOther PollutantsEmission (GLS)
(1.)BoilerBriquette300.5PM10100
19.
Power Requirement:
(a)Quantity (Kilo Volt Amps (kVA)) 200
(b)Source MSEDCL
(c)Uploaded Copy of Agreement Not Applicable
(d)Standby Arrangement (Details of DG Sets) 250 KVS
(e)Stack Height (in m) 6.5
20.
Land Ownership Pattern:
(a)Forest Land (ha.) 0
(b)Private Land (ha.) 0
(c)Government Land (ha.) 0
(d)Revenue Land (ha.) 0
(e)Other Land (ha.) 0.54468
    Total Land (ha.) 0.54468
21.
Present Land Use Breakup of the Study Area in Ha:
(a)Agriculture Area (ha.) 14705
(b)Waste/Barren Land (ha.) 0
(c)Grazing/ Community Land (ha.) 0
(d)Surface Water Bodies (ha.) 7807
(e)Settlements (ha.) 1576
(f)Industrial (ha.) 0
(g)Forest (ha.) 0
(h)Mangroves (ha.) 0
(i)Marine Area (ha.) 0
(j)Others (ha.) : Fallow Land 7327
    Total (ha.) 31415
    22.     Land requirement for various activities
S. No.Description of Activity / Facility / Plant / Others OthersLand Requirement (ha.)Remarks
(1.)Built Up Area0.2120
(2.)Green belt0.180785
(3.)OthersOther0.15189
Total (ha.) 0.544675
23.
Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones :
    23.1.     Details of Ecological Sensitivity :
S. No.Details of Ecological Sensitivity NameDistance from the Project (Km)Remarks
(1.)Critically Polluted AreaNA0NA
(2.)WLSJayakwadi Bird Sanctury2NA
(3.)NPAJayakwadi Bird Sanctury2NA
(4.)ESZsJayakwadi Bird Sanctury2NA
(5.)CorridorsNA0NA
(6.)Wildlife CorridorsNA0NA
(7.)ESAsNA0NA
    23.2.     Details of Environmental Sensitivity :
S. No.Details of Environmental Sensitivity Other Details of Environmental Sensitivity NameDistance from the Project (Km)Remarks
(1.)ForestNA0NA
(2.)Defence InstallationsNA0NA
(3.)Archaeological SitesNA0NA
(4.)OthersNANA0NA
23.3.
(a)Whether Noc / Permission from the competent authority is required? No
(b)Whether NBWL recommendation is required? No
24.
Forest Land:
Whether any Forest Land involved? No
25.
Tree Cutting:
(a)No. of Trees Cut for the Project (if Forest Land not Involved) 0
(b)Details of Tree Cutting and Planting of Trees Not Applicable
26.
Land Acquisition Status:
(a)Acquired Land(Ha) 0.544685
(b)Land yet to be acquired(Ha) 0.544685
(c)Status of Land acquisition if not acquired 0
27.
Rehabilitation and Resettlement (R&R):
(a)No. of Villages 0
(b)No. of Households 0
(c)No. of PDFs (Project Displaced Families) 0
(d)No. of PAFs (Project Affected Families) 0
(e)Funds Allocated for R&R(in INR) (in Lacs) 0
(f)Status of R&R Yet To Start
28.
Details of Presence of Schedule-I Species:
(a)Whether there is Presence of Schedule-I Species ? Yes
(i)Details of Schedule-I Species White Stork
(b)Whether conservation plan for Schedule-I Species has been prepared ? Yes
(i)Uploaded copy of conservation plan Copy of conservation plan
(ii)Fund Provision made 10 Lkhs
(iii)Period of Implementation 5 Years
(c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? No
29.
Details of Presence of Water Bodies in Core Area:
(a)Whether there is Presence of Water Bodies in Core Area ? Yes
(i)Details of Water Bodies in Core Area Nath Sagar
(b)Whether there is Diversion Required ? No
(c)Whether permission has been obtained from competent authority ? No
30.
Details of Presence of Water Bodies in Buffer Area:
(a)Whether there is Presence of Water Bodies in Buffer Area ? Yes
(i)Details of Water Bodies in Buffer Area Nath Sagar
(ii)Direction of Water Bodies in Buffer Area South West
(iii)Distance of Water Bodies in Buffer Area 2
31.
Manpower Requirement:
(a)Permanent Employment-During Construction 10
(b)Permanent Employment-During Operation 20
(c)Temporary Employment- During Construction 10
(d)Temporary Employment- During Operation 15
(e)No. of working days 360
(f)Total Manpower 55
32.
Green Belt in Ha:
(a)Total Area of Green Belt 0.180785
(b)Percentage of Total Project Area 33.19
(c)No. of Plants to be Planted 200
(d)Funds Allocated for Plantation 5.6
(e)Uploaded Green Belt plan Copy of Green Belt Plan
    33.         Project Benefits
S. No.Type of Project Benefits Details of Project Benefits
(1.)FinancialContribution to the Revenue in the form of GST, Economical Opportunity for Indian Chemical & Pharmaceutical Company, Project will increase the export potential of Country thus it will increase the foreign exchange earnings
(2.)EnvironmentalDevelopment of Green Belt as per CPCB guidelines of on 1807.85 sqm, Rain Water Harvesting to recharge ground water by 2352.23 m3/year
(3.)SocialContribution of Rs. 0.14 Crores towards CER Fund for Various activities In study Area, Direct Employment to 55 Peoples, Indirect Employment opportunities to Local People
   34.   CRZ Specific Details : Not Applicable
   35.   Sector Specific Details : NOT APPLICABLE
   35.   Sector Specific Details For Industrial Projects - 2
S. No.Item Details
S. No.Item Details
36.
Details of Court Cases:
(a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? No
37.
Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act:
(a)Whether any Direction issued under EPA Act/Air Act/Water Act ? No
38.
Details of EIA Consultant:
(a)Have you hired Consultant for preparing document? Yes
(i)Accreditation No. 130
(ii)Name of the EIA Consultant sd engineering services pvt ltd
(iii)Address 15, Age Arcade, Near Sant Eknath Rang Mandir, New Osmanpura, Aurangabad. 431005
(iv)Mobile No. 9960634559
(v)Landline No. 0240233362
(vi)Email Id deepak.sanghai@gmail.com
(vii)Category of Accreditation A
(viii)Sector of Accreditation Industrial Projects - 2
(ix)Validity of Accreditation 10 Aug 2019
(x)Uploaded Certificate of Accreditation certified by QCI/NABET Copy of Certificate of Accreditation
39.
Documents to be Attached:
(a)Uploaded Copy of EIA/EMP Report Copy of EIA/EMP
Copy of EIA/EMP(Annexures)
Copy of EIA/EMP(Plans/Figures)
(b)Uploaded Copy of Risk Assessment Report Copy of Risk Assessment
(c)Uploaded Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan Copy of Feasibility Report/ Detailed Project Report(DPR) /Detailed Engineering Report /Detailed Conceptual Plan /Approved Mining Plan
(d)Uploaded Copy of Final Layout Plan Copy of Final Layout Plan
(e)Uploaded Cover Letter Copy of Cover Letter
(f)Uploaded Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency
(g)Uploaded Additional File Copy of Additional File
(h)Uploaded Proposal Presentation (To be given in EAC meeting) NA
            Essential Detail Sought:
Sno. EDS Letter Remarks Date of EDS
1.NAPlease justify applicability of general condition based on distance of the project site from nearest boundary of the Sanctuary along with supporting documents to ascertain admissibility of the proposal at central level. 07 Jul 2019
2.NAThe correction have been made as per the instruction received 17 Jul 2019
      Additional Detail Sought : NIL
Undertaking
I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up.
Name of ApplicantDinkar B Arbale
DesignationMD
Name of Company (Applicant Name should not be given here)AD PHARMACHEM PVT LTD
AddressPlot No. A-86, Paithan MIDC, Paithan