1. | Whether it is a violation case and application is being submitted under Notification No. S.O.804(E) dated 14.03.2017 ? | No | Details of Project: | (a)Name of the project(s) | Shree Chhatrapati Shahu Sahakari Sakhar Karkhana Ltd | (b)Name of the Company / Organisation | SHREE CHHATRAPATI SHAHU SAHAKARI SAKHAR KARKHANA LTD., KAGAL | (c)Registered Address | Kagal, Taluka : Kagal, District : Kolapur,,Kolhapur,Maharashtra-416216 | (d)Legal Status of the Company | Others | (e)Joint Venture | No | |
|
2. | Address for the correspondence: | (a)Name of the Applicant | Jitendra Anandrao Chavan | (b)Designation (Owner/ Partner/ CEO) | Managing Director | (c)Address | Shree Chatrapati Shahu S.S.K. Tdt., Kagal Shrimant Jayshingrao Ghatge Bhavan, Kagal, Taluka : Kagal, District : Kolhapur,,Kagal,Kolhapur,Maharashtra-416216 | (d)Pin code | 416216 | (e)E-mail | enveng@shahusugar.com | (f)STD Code. | 2325(f)Telephone No. | 244211 | (g)Fax No. | 02325244241 | (h)Copy of documents in support of the competence/authority of the person making this application to make application on behalf of the User Agency . | Annexure-Uploaded Copy of documents in support of the competence/authority | |
|
3. | Category of the Project/Activity as per Schedule of EIA Notification,2006: | (a.I)Project/Activity | 5(g) Distilleries 5(j) Sugar Industry
| Minor Activity | 1(d) Thermal Power Plants
| (b)Category | A | (c)Proposal Number | IA/MH/IND2/30200/2015 | (d)Master Proposal Number(Single Window) | SW/78609/2018 | (e)EAC concerned (for category A Projects only) | Industrial Projects - 2 | (f)Project Type | Expansion |
|
|
4. | Location of the Project: | (a)Plot/Survey/Khasra No. | 144/1/B, 144/2, 148-151, 153-157, 159-161, 164-172 | (b)Pincode | 416216 | (c)Bounded Latitudes (North) | | From | | Degree | 16.291267 | Minutes | | Second | | From | | Degree | 16.596367 | Minutes | | Second | | (d)Bounded Longitudes (East) | | From | | Degree | 74.294981 | Minutes | | Second | | From | | Degree | 74.296822 | Minutes | | Second | | (e)Survey of India Topo Sheet No. | 47L2, 47L6 | (f)Uploaded Topo Sheet File | Copy of Topo Sheet File | (g)Maximum Elevation Above Means Sea Level(AMSL) | 553 | (h)Uploaded (kml) File | Copy of Kml File | (i)Distance of Nearest HFL from the project boundary within the study area | 2.5 | (j)Seismic Zone | 4 | |
|
5. | (a)Number of States in which Project will be Executed | 1 | (b)Main State of the project | Maharashtra | |
|
|
Details of State(s) of the project |
---|
S. No. | State Name | District Name | Tehsil Name | Village Name |
---|
(1.) | Maharashtra | Kolhapur | Kagal | | |
|
6. | Details of Terms of Reference (ToR)/EC: | (a)MoEF&CC / SEIAA File Number | J-11011/225/2015-IA II (I) | (c)Date of Issue of TOR | 01 Jan 1900 | (f)Previous TOR Letter | NA | (b)Date of Apply of EC | 22 Dec 2016 | (c)Date of Issue of EC | 28 Mar 2017 | (d)Previous EC Letter | Copy of Previous EC letter | |
|
7. | Details of Public Consultation: | (a)Whether the Project Exempted from Public Hearing? | Yes | (b)Reason | Public Hearing exempted as per OM dated 29.08.2017 | (c)Supporting Document | Copy of Supporting Document | |
|
8. | Details of Project Configuration/Product: | Details Not Applicable | |
|
9. | In case of Expansion / Modernisation / One Time Capacity Expansion (only for Coal Mining) / Expansion under Clause 7(ii) / Modernisation under Clause 7(ii) / Change of Product Mix under Clause 7(ii): | (a)Details of certified report on compliance of earlier environmental clearance condition | (i)Certified Compliance By | Regional | (ii)Details of Regional Office of MoEFCC / Zonal Office of CPCB / SPCB / UTPCC from which certified report on | Nagpur | (iii)Letter No. | EC-334/RON/2017-NGP/5139 | (iv)Status of Compliance | Partially Complied | (v)Certified report on compliance of earlier environmental clearance conditions (Including Monitoring Report) | Copy of Certified Compliance Report | (vi)Date of site visit | Feb 7 2019 12:00AM | (b)Details of Capacity Expansion | |
|
S. No. | Product/Activity (Capacity/Area) | Quantity From | Quantity To | Total | Unit | Other Unit | Mode of Transport / Transmission of Product | Other Mode of Transport / Transmission of Product |
---|
(1.) | Sugar | 163380 | 70620 | 234000 | Tons per Annum(TPA) | | Road | | (2.) | Ethanol | 30 | 30 | 60 | Kilo Litre per Day(KLD) | | Road | | (3.) | Refined Sugar | 0 | 234000 | 234000 | Tons per Annum(TPA) | | Road | | (4.) | Bagasse | 378000 | 162000 | 540000 | Tons per Annum(TPA) | | Conveyor Belt | | (5.) | pressmud | 50400 | 21600 | 72000 | Tons per Annum(TPA) | | Road | | (6.) | Rectified spirit (RS)/ENA | 60 | 30 | 90 | Kilo Litre per Day(KLD) | | Road | To grid | (7.) | Electricity | 28 | 10 | 38 | Mega Watt(MW) | | Others | To grid | (8.) | Molasses | 50400 | 21600 | 72000 | Tons per Annum(TPA) | | Road | | (9.) | Rectified spirit (RS)/ENA | 60 | 30 | 90 | Kilo Litre per Day(KLD) | | Road | | |
| (c)Details of Configuration | |
|
S. No. | Plant / Equipment / Facility | Existing Configuration | Proposed Configuration | Final configuration after expansion | Remarks |
---|
(1.) | Sugar | 7000 TCD | 3000 TCD | 10000 TCD | | (2.) | Co-generation | 28 MW | 10 MW | 38 MW | | (3.) | Distillery | 60 KLD | 30 KLD | 90 KLD | | |
9.1. | Details of Consent to Operate | (i)Whether Consent to operate obtained ? | NA | (ii)Copies of all Consent to operate obtained since inception | NA | (iii)Date of Issue | 01 Aug 2018 | (iv)Valid Upto | 31 Jul 2019 | (v)File No. | Format 1.0/BO/CAC-CELL/UAN | (vi)Application No. | 1902000375 | (vii)Copy of Consent to operate valid as on date | Copy of Consent to Operate | |
|
|
10. | Project Cost: | (a)Total Cost of the Project at current price level (in Crores) | 110 | (b) Funds Allocated for Environment Management (Capital) (in Crores) | 19.45 | (c) Funds Allocated Towards CER (Corporate Environment Responsibility) (in Crores) | 2.77 | (d) Funds Allocated for Environment Management Plan (EMP) (Recurring per Annum) (in Crores) | 5.10 | |
|
11. | Whether project attracts the General Condition specified in the Schedule of EIA Notification ? | Yes | d)Inter-State boundaries and international boundaries | Yes | | |
12. | Whether project attract the Specific Condition specified in the Schedule of EIA Notification ? | No | | |
13. | Raw Material / Fuel Requirement: | (a)Proposed quantity of raw material/fuel | 3000 | (b)Existing quantity of raw material/fuel | 7000 | (c)Total quantity of raw material/fuel | 10000 | |
|
  13.1. Raw Material / Fuel Profile |
---|
S. No. | Raw Material / Fuel | Quantity | Unit | Other Unit | Source (incase of Import. please specify country and Name of the port from which Raw Material / Fuel is received ) | Mode of Transport | Other Mode of Transport | Distance of Source from Project Site (in Kilometres) (In case of import, distance from the port from which the raw material / fuel is received) | Type of Linkage | Other Type of Linkage | Uploaded Copy of Linkage |
---|
(1.) | Sugar cane | 1800000 | Tons per Annum | | Near by farm | Road | | 40 | Open Market | | Copy of Linkage | (2.) | Molasses | 90000 | Tons per Annum | | Open Market | Road | | 40 | Open Market | | Copy of Linkage | (3.) | Bagasse | 324000 | Tons per Annum | | Won Sugar Factory | Conveyor Belt | | 0 | Captive | | Copy of Linkage | |
|
14. | Baseline Data : | (a)Period of Base Line Data Collection | FROM 01 Dec 2018 To 28 Feb 2019 | (b)Season | Post-Monsoon | |
|
14.1. No. of ambient Air Quality (AAQ) monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Maximum Value | Minimum Value | 98 Percentile Value | Prescribed Standard |
---|
(1.) | PM10 | | Micro Gram per Meter Cube | 80.50 | 52.00 | 79.92 | 100 | (2.) | PM2.5 | | Micro Gram per Meter Cube | 42.70 | 16.30 | 42.07 | 60 | (3.) | NOx | | Micro Gram per Meter Cube | 45.60 | 19.00 | 44.22 | 80 | (4.) | SO2 | | Micro Gram per Meter Cube | 31.40 | 13.00 | 30.38 | 80 | |
14.2. No. of Ground Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Heavy Metal | Unit | Other Unit | Maximum Value | Minimum Value | Desirable Limit | Maximum Permissible Limit |
---|
(1.) | Total Hardness | | | mg/l | | 291.54 | 134.13 | 200 | 200 | (2.) | Chlorides | | | mg/l | | 305.43 | 57.09 | 250 | 250 | (3.) | pH | | | NA | | 7.38 | 7.00 | 6.5 | 8.5 | (4.) | TDS | | | mg/l | | 761.62 | 228.30 | 500 | 500 | (5.) | Fluoride | | | mg/l | | 2.32 | 0.14 | 1 | 1 | (6.) | TSS | | | mg/l | | 27.46 | 11.96 | 100 | 100 | |
14.3. No. of Surface Water monitoring locations : 8 |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Other Unit | Maximum Value | Minimum Value | Classification of inland water body |
---|
(1.) | pH | | NA | | 8.20 | 7.47 | E | (2.) | BOD | | mg/l | | 85.68 | 7.15 | E | (3.) | COD | | mg/l | | 180.86 | 24.17 | E | (4.) | DO | | mg/l | | 3.11 | 0.55 | E | |
14.4. No. of Ambient Noise monitoring locations : 8 |
---|
S. No. | Parameter | Unit | Maximum Value | Minimum Value | Prescribed Standard |
---|
(1.) | Leq(Night) | A-weighted decibels(dB(A)) | 51.3 | 40.1 | 70 | (2.) | Leq(Day) | A-weighted decibels(dB(A)) | 70.9 | 50.5 | 75 | |
14.5. No. of Soil Sample Monitored locations : 8 |
---|
S. No. | Parameter | Unit | Other Unit | Maximum Value | Minimum Value |
---|
(1.) | N(Nitrogen) | Milligram per Kilogram | | 918.76 | 412.38 | (2.) | P(Phosphorus) | Milligram per Kilogram | | 136.38 | 41.59 | (3.) | K(Potassium) | Milligram per Kilogram | | 297.41 | 100.26 | (4.) | Electric Conductivity | Millisiemens per Centimetre | | 3127.50 | 1325.30 | (5.) | pH | | | 8.16 | 7.52 | |
|
14.6. | Details of Ground Water Table: | (a)Range of Water Table Pre-Monsoon Season (Meters Below Ground Level (m bgl)) | From 0.00 To 16.28 | (b)Range of Water Table Post-Monsoon Season (Meters Below Ground Level (m bgl)) | From 1.5 To 10 | (c)Whether Ground Water Intersection will be there ? | No | |
|
15. Details of Water Requirement (During Operation) |
---|
S. No. | Source | Source Other | Required Quantity (Kilolitre per Day (Kld)) | Distance from Source | Copy of Permission from Competent Authority | Mode of Transport | Other Mode of Transport | Method of Water Withdrawal | Other Method of Water Withdrawal | Letter No. | Date of Issue | Permitted Quantity |
---|
(1.) | Surface | | 351 | 3.0 | Copy of Permission Letter | Pipeline | | Intake Well | | D818 | 10 Oct 2007 | 2196 | |
|
15.1. | (a)Whether Desalination is proposed | No | |
|
16. Waste Water Management(During Operation) |
---|
S. No. | Type/Source | Quantity of Waste Water Generated (Kilolitre per Day) | Treatment Capacity (Kilolitre per Day) | Treatment Method | Mode of Disposal | Other Mode of Disposal | Quantity of Treated Water Used in Recycling/Reuse (Kilolitre per Day) | Quantity of Discharged Water (Kilolitre per Day) |
---|
(1.) | Domestic Effluent | 73.2 | 80 | Proposed STP to be upgraded under expansion | Green Belt Renewal Plant | | 73.2 | | (2.) | Industrial Effluent (Distillery-Other) | 599 | 700 | treated in CPU | Reuse within the Plant & Recycling | | 599 | | (3.) | Industrial Effluent (Distillery- Spent wash) | 667 | 700 | Concentration in mEE followed by composting | Others | Composting | 667 | 0 | (4.) | Industrial Effluent (Sugar & Co-gen) | 867 | 900 | Full fledge ETP to be upgraded under expansion | Others | treated water-for crop cultivation | 867 | 0 | |
|
16.1. | (a)Total Waste Water Generation (Kilolitre per Day) | 2206.2 | (b)Total Discharged Water (Kilolitre per Day) | 0 | (c)Total Reused Water (Kilolitre per Day) | 2206.2 | |
|
17. Solid Waste Generation/Management |
---|
S. No. | Name of Waste | Item | Other Item | Quantity per Annum | Unit | Distance from Site(KM) | Mode of Transport | Other Mode of Transport | Mode of Disposal | Other Mode of Disposal |
---|
(1.) | Fermentation Residues | Industrial Waste | | 405 | Tons | 5.0 | Road | | Others | Mixed in composting process | (2.) | boiler Ash | Bottom Ash | | 15454.8 | Tons | 20 | Road | | Others | Composting/ send to brick manufacturer | (3.) | ETP Sludge | Industrial Waste | | 45 | Tons | 0 | Road | | Others | Use as mannure in own farm | |
|
|
18.1. Air Quality Impact Prediction |
---|
S. No. | Criteria Pollutants | Other Criteria Pollutants | Unit | Baseline Concentration | Distance GLC | Incremental Concentration | Total GLC | Prescribed Standard |
---|
(1.) | NOx | | Microgram per Meter Cube | 19.14 | 00 | 00 | 19.15 | 80 | (2.) | SO2 | | Microgram per Meter Cube | 30.38 | 2.53 | 0.05 | 30.44 | 80 | (3.) | PM10 | | Microgram per Meter Cube | 79.82 | 2.53 | 0.10 | 80.02 | 100 | (4.) | PM2.5 | | Microgram per Meter Cube | 42.07 | 2.53 | 0.033 | 42.13 | 60 | |
|
18.2. Stack Details |
---|
S. No. | Source | Fuel | Stack Height(m) | Stack Diameter(m) | Pollutants | Other Pollutants | Emission (GLS) |
---|
(1.) | Boiler | Biogas/Bagasse | 40 | 2.93 | SO2 | | 5.12 | |
|
19. | Power Requirement: | (a)Quantity (Kilo Volt Amps (kVA)) | 20000 | (b)Source | Own Co-gen | (c)Uploaded Copy of Agreement | Not Applicable | (d)Standby Arrangement (Details of DG Sets) | 500 KVA (2 Nos.), 300 KVA (2 Nos.) | (e)Stack Height (in m) | 5 | |
|
20. | Land Ownership Pattern: | (a)Forest Land (ha.) | 0 | (b)Private Land (ha.) | 140 | (c)Government Land (ha.) | 0 | (d)Revenue Land (ha.) | 0 | (e)Other Land (ha.) | 0 | Total Land (ha.) | 140 | |
|
21. | Present Land Use Breakup of the Study Area in Ha: | (a)Agriculture Area (ha.) | 13720 | (b)Waste/Barren Land (ha.) | 4512 | (c)Grazing/ Community Land (ha.) | 0 | (d)Surface Water Bodies (ha.) | 342 | (e)Settlements (ha.) | 3970 | (f)Industrial (ha.) | 0 | (g)Forest (ha.) | 25 | (h)Mangroves (ha.) | 0 | (i)Marine Area (ha.) | 0 | (j)Others (ha.) : Scrub Land, Mining Area, Fallow Land | 8846 | Total (ha.) | 31415 | |
|
22. Land requirement for various activities |
---|
S. No. | Description of Activity / Facility / Plant / Others | Others | Land Requirement (ha.) | Remarks |
---|
(1.) | Green belt | | 46.2 | | (2.) | Built Up Area | | 17.40 | | |
|
|
23. | Ecological and Environmental Sensitivity (Within 10 Km):- WLS-Wild Life Sanctuaries; NPA-Notified Protected Area; ESAs-Eco Sensitive Areas; ESZs-Eco Sensitive Zones : | |
|
23.1. Details of Ecological Sensitivity : |
---|
S. No. | Details of Ecological Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | WLS | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (2.) | ESZs | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (3.) | Critically Polluted Area | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (4.) | ESAs | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (5.) | NPA | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (6.) | Corridors | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | (7.) | Wildlife Corridors | Nil | 0 | There is no presence of any CPA, NPA, ESAs, ESZs, Corridors & wildlife corridors in 10 Km radius of project | |
23.2. Details of Environmental Sensitivity : |
---|
S. No. | Details of Environmental Sensitivity | Other Details of Environmental Sensitivity | Name | Distance from the Project (Km) | Remarks |
---|
(1.) | Archaeological Sites | | NA | 0 | There are no archealogical sites within 10 km from project site | (2.) | Defence Installations | | NA | 0 | There are no any defence installations within 10 km from project site | (3.) | Forest | | NA | 0 | There is no forest land within 10 km from project site | |
|
23.3. | (a)Whether Noc / Permission from the competent authority is required? | No | (b)Whether NBWL recommendation is required? | No | |
|
24. | Forest Land: | Whether any Forest Land involved? | No | |
|
25. | Tree Cutting: | (a)No. of Trees Cut for the Project (if Forest Land not Involved) | 0 | (b)Details of Tree Cutting and Planting of Trees | Not Applicable | |
|
26. | Land Acquisition Status: | (a)Acquired Land(Ha) | 0 | (b)Land yet to be acquired(Ha) | 0 | (c)Status of Land acquisition if not acquired | Nil | |
|
27. | Rehabilitation and Resettlement (R&R): | (a)No. of Villages | 0 | (b)No. of Households | 0 | (c)No. of PDFs (Project Displaced Families) | 0 | (d)No. of PAFs (Project Affected Families) | 0 | (e)Funds Allocated for R&R(in INR) (in Lacs) | 0 | (f)Status of R&R | Completed | |
|
28. | Details of Presence of Schedule-I Species: | (a)Whether there is Presence of Schedule-I Species ? | No | (b)Whether conservation plan for Schedule-I Species has been prepared ? | No | (c)Whether conservation plan for Schedule-I Species has been approved by competent authority ? | No | |
|
29. | Details of Presence of Water Bodies in Core Area: | (a)Whether there is Presence of Water Bodies in Core Area ? | Yes | (i)Details of Water Bodies in Core Area | Doodhaganga river, Jayshingrao Lake, | (b)Whether there is Diversion Required ? | No | (c)Whether permission has been obtained from competent authority ? | No | |
|
30. | Details of Presence of Water Bodies in Buffer Area: | (a)Whether there is Presence of Water Bodies in Buffer Area ? | Yes | (i)Details of Water Bodies in Buffer Area | Kaneri Lake | (ii)Direction of Water Bodies in Buffer Area | North West | (iii)Distance of Water Bodies in Buffer Area | 5.10 | |
|
31. | Manpower Requirement: | (a)Permanent Employment-During Construction | 50 | (b)Permanent Employment-During Operation | 100 | (c)Temporary Employment- During Construction | 0 | (d)Temporary Employment- During Operation | 50 | (e)No. of working days | 270 | (f)Total Manpower | 200 | |
|
|
S. No. | Description | Existing | Proposed | Total |
---|
(1.) | Total Area of Green Belt | 370000 | 92000 | 462000 | (2.) | Percentage of Total Project Area | 26.43 | 6.57 | 33 | (3.) | No. of Plants | 17979 | 70000 | 87979 | (4.) | Funds Allocated | 600000 | 3200000 | 3800000 | |
|
33. Project Benefits |
---|
S. No. | Type of Project Benefits | Details of Project Benefits |
---|
NIL | |
|
34. CRZ Specific Details : Not Applicable |
35. Sector Specific Details : NOT APPLICABLE |
35. Sector Specific Details For Industrial Projects - 2 |
|
|
36. | Details of Court Cases: | (a)Whether there is any Court Cases pending against the project and/or land in which the project is proposed to be set up ? | Yes | (b)Name of the Court | Districts Courts | (c)Name of the Sub Court | kolhapur | (d)Case No. | Crim.Misc.Appln.No 1117 | (e)Orders/Directions of the court ,if any and its relevance with the proposed project | No | (f)Case Details | Increased number of days for distillery operation | (g)Uploaded Court Order | Copy of Court Order | |
|
37. | Details of Direction Issued under Environment (Protection) Act / Air (Prevention & Control of Pollution)) Act / Water (Prevention & Control of Pollution) Act: | (a)Whether any Direction issued under EPA Act/Air Act/Water Act ? | No | |
|
38. | Details of EIA Consultant: | (a)Have you hired Consultant for preparing document? | Yes | (i)Accreditation No. | NABET/EIA/1518/SA063 | (ii)Name of the EIA Consultant | M/s. Equinox Environments (I) Pvt. Ltd., (EEIPL) | (iii)Address | F-11, Namdev Nest 1160āB, āEā Ward Sykes Extension opp. of Kamala College, Kolhapur 416 001 | (iv)Mobile No. | 9657865122 | (v)Landline No. | 0231253123 | (vi)Email Id | projects@equinoxenvi.com | (vii)Category of Accreditation | A | (viii)Sector of Accreditation | Industrial Projects - 2 | (ix)Validity of Accreditation | 21 Oct 2018 | (x)Uploaded Certificate of Accreditation certified by QCI/NABET | Copy of Certificate of Accreditation | |
|
|
Essential Detail Sought: |
---|
Sno. | EDS Letter | Remarks | Date of EDS |
---|
1. | NA | - Please submit copy of the EC dated 28/3/2017.
- Whether EIA Consultant was having NABET accreditation while preparation of EIA/EMP report and submission of the proposal for EC. Please clarify. | 02 Jun 2019 | 2. | NA | The correction have been made as per the instruction received | 06 Jun 2019 | 3. | NA | As per the Ministry's Notification dated 13/6/2019, the said project/activity has been listed under category B and thus requires appraisal/approval at State level by the concerned SEAC/SEIAA. | 14 Jun 2019 | 4. | NA | The correction have been made as per the instruction received | 17 Jun 2019 | 5. | NA | Please see our observations dated 2/6/2019 for the needful. | 07 Jul 2019 | 6. | NA | The correction have been made as per the instruction received | 08 Jul 2019 | 7. | NA | Please see our observations dated 14/6/2019 for the needful. | 04 Aug 2019 | 8. | NA | The correction have been made as per the instruction received | 06 Aug 2019 | |
Additional Detail Sought : NIL |
| Undertaking |
| I hereby give undertaking that the data and information given in the application and enclosures are true to be best of my knowledge and belief. And I am aware that if any part of the data and information found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at our risk and cost. In addition to above, I hereby give undertaking that no activity/ construction/ expansion has since been taken up. |